- facility-security.md: continuous temperature/humidity/PM control, zoned filtration, burning-season PM2.5 design point, HVAC in PV/battery sizing - traceability.md: end-to-end per-order customer traceability, batch genealogy, log-at-source principles, machine data access as a procurement requirement
This commit is contained in:
1 parent
0a4f47a5cc
commit
0b79c4fb73
5 files changed
+110
-9
No files matched your search
@@ -1,8 +1,37 @@
|
||||
# Facility: Security and Site Systems
|
||||
|
||||
What the plant needs beyond the production machinery. Access control and
|
||||
CCTV are set requirements; the rest of this list is what a plant of this
|
||||
profile definitely needs, to be refined during site design.
|
||||
What the plant needs beyond the production machinery. Access control, CCTV,
|
||||
and whole-factory HVAC control are set requirements; the rest of this list
|
||||
is what a plant of this profile definitely needs, to be refined during site
|
||||
design.
|
||||
|
||||
## Climate control: whole-factory HVAC
|
||||
|
||||
The entire factory runs under continuous HVAC control, covering temperature,
|
||||
humidity, and particulate matter (PM). This is a set requirement, not an
|
||||
option per room.
|
||||
|
||||
- **Temperature and humidity**: the process spec already demands 20-26 °C at
|
||||
35-60% relative humidity for pressing; the same conditioning extends to
|
||||
the whole building so materials, masters, packaging stock, and electronics
|
||||
never sit outside controlled conditions. PVC compound and paper packaging
|
||||
are both humidity-sensitive.
|
||||
- **Particulate matter**: filtration for the whole plant, with stricter
|
||||
tiers by zone. Dust in a groove is an audible defect, so the cutting room
|
||||
and galvanics clean room run at the tightest spec with positive pressure;
|
||||
pressing and packaging run cleaner than ambient; offices and logistics at
|
||||
a baseline tier. Northern Thailand's burning season (roughly February to
|
||||
April) brings some of the world's worst PM2.5 episodes, so intake
|
||||
filtration and building tightness must be designed for those peaks, not
|
||||
for average days.
|
||||
- **Continuous monitoring and alarms**: temperature, humidity, and PM
|
||||
sensors logging in every zone, with alarms on excursions, tied into the
|
||||
plant monitoring below.
|
||||
- **Energy design**: conditioning a whole factory in a tropical climate is
|
||||
a major electrical load on top of the 250 kW process cooling, and it must
|
||||
be included in the solar PV and battery sizing from the start. Heat
|
||||
recovery from the press hall (steam, hydraulics, and hot PVC all reject
|
||||
heat) and from compressors should feed the design rather than fight it.
|
||||
|
||||
## Physical security
|
||||
|
||||
@@ -58,9 +87,9 @@ profile definitely needs, to be refined during site design.
|
||||
- **Lightning protection and grounding**: northern Thailand has intense
|
||||
storm seasons; the PV array, steel structures, and electronics all need a
|
||||
proper LPS and earthing design.
|
||||
- **Environmental monitoring**: temperature and humidity logging in
|
||||
production (the process spec calls for 20-26 °C, 35-60% RH), the archive,
|
||||
and the clean room.
|
||||
- **Environmental monitoring**: the whole-factory HVAC monitoring above
|
||||
(temperature, humidity, PM in every zone), with the archive and clean room
|
||||
as the most tightly alarmed spaces.
|
||||
|
||||