Payap model: two-storey office building with canteen, changing and showers
User, October 2026: the office building also houses several showers, a changing room, toilets and a canteen; the office area itself about 150 m2; the building can be multi-storey. Model (office rebuilt live in FreeCAD 26.3; factory and site untouched): - 32 x 15 m on two storeys (off_storey 3.6 m), ~960 m2 of floor, Arch Stairs plus a lift, first floor slab with the stair and lift void; - ground floor: reception and lobby (entrance and link door), canteen ~40 seats with kitchen and servery, changing rooms women and men with 4 showers each and lockers, toilets, mastering and cutting (acoustic lining), listening room, archive; - first floor: offices 147 m2 (16 desks), training room (Payap programmes), meeting room, IT and server, toilets, pantry, flexible room; - factory staff entry relabelled "PPE, WC" (changing is in the office). New docs/cnx_vinyl_parametric_payap-office.png with both floor plans. Docs: site-candidates Payap section (office bullet, staff entry, area ~3,400 m2 footprint / ~3,880 m2 floor), README bullet and layout line.
This commit is contained in:
1 parent
4263fbbd9b
commit
0700c14b5c
6 files changed
+29
-15
No files matched your search
@@ -132,10 +132,12 @@ The detail lives in dedicated documents:
|
||||
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
|
||||
on a square placeholder plot of Payap land: a 112 x 25 m production-only
|
||||
factory with the five-press fleet, room for ten more Classics and one
|
||||
shared hydraulic and air plant, a separate office building for offices,
|
||||
mastering and IT, a separate water treatment building next to
|
||||
galvanics, the utility yard and site access, all driven by one
|
||||
parameter sheet
|
||||
shared hydraulic and air plant, a separate two-storey office building
|
||||
([floor plans](docs/cnx_vinyl_parametric_payap-office.png): canteen,
|
||||
changing rooms and showers, mastering and listening below; ~150 m² of
|
||||
offices, training room and IT above), a separate water treatment
|
||||
building next to galvanics, the utility yard and site access, all
|
||||
driven by one parameter sheet
|
||||
- [Process logging and traceability](docs/traceability.md): end-to-end
|
||||
per-order traceability for customers, batch genealogy from audio file to
|
||||
shipment, and the requirements this sets for the factory software
|
||||
@@ -237,6 +239,7 @@ docs/
|
||||
├── cnx_vinyl_parametric_payap.FCStd Payap scenario parametric BIM model
|
||||
├── cnx_vinyl_parametric_payap.png Top view of the Payap model
|
||||
├── cnx_vinyl_parametric_payap-iso.png Isometric view of the Payap model
|
||||
├── cnx_vinyl_parametric_payap-office.png Office building floor plans
|
||||
├── crane-workshop-tours.md Overhead crane, workshop, visitor corridor
|
||||
├── digital-factory.md Data platform, NixOS/Clan fleet, acquisition, app
|
||||
├── facility-security.md Security, HVAC, fire and life safety, compliance
|
||||
|
||||