d9c65bcf0c9a6a4d32e2758a7999c6070598eba6
4
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
0005f7dce1 |
feat: codified backtests, honest docs, belt-and-braces serving, perf fixes
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 13s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 23s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
Documentation / Validate Documentation (push) Failing after 7s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 15s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 3s
Retrained on the gap-filled DB (592k -> 976k rows) and re-examined the flood backtests, now reproducible via scripts/backtest_render.py (renders the three docs/img charts and gates on a >=12h 2024 first-alert lead — currently failing by design and documented as such). Findings, all documented in FLOOD_FORECASTING.md: the true 2024 crossing was 24 Sep 17:00 (8h earlier than recorded; confirmed against the independent HII sensor), the historical 24h-warning claim was partly a missing-data artifact, and retrained warn classifiers collapse on the filled grid (P.1 24h PR-AUC 0.900 -> 0.288) while regression MAE improves (11.3 -> 10.5 cm). Serving therefore becomes max(classifier, sigmoid(regression)) so alerting is never worse than the regression path; metrics table, head-gating tiers, honest-limits and runbook expectations all updated to the current model (hgb-v1+d2d0e65). Perf, from Locust load testing (scripts/locustfile.py + load_test.py): single-flight lock around /forecast inference (concurrent cache misses previously each ran ~18s inference and starved the shared thread pool; 200-user run after: 105 rps, 0.01% errors), and /measurements/latest + /health moved off the event loop (synchronous DB/network calls in async handlers were stalling every request under load). |
||
|
|
27fa292e09 |
docs: September 2025 flood render - deployed config, 24 h warning, peak within 7 cm
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 25s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 12s
Documentation / Validate Documentation (push) Failing after 8s
Documentation / Generate API Documentation (push) Successful in 11s
Documentation / Build Sphinx Documentation (push) Successful in 16s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 0s
Documentation / Documentation Summary (push) Successful in 2s
Hour-by-hour chart of the 25-28 Sep 2025 event as forecast by the exact deployed configuration (trained through 2024, event unseen): first alert 26 Sep 18:00, flooding began 27 Sep 18:00 (24 h lead), predicted peak 4.00 m vs actual 3.93 m. The near-miss 3.51 m crest on 26 Sep correctly never alerted. |
||
|
|
f0183faa62 |
feat: discharge-driven river animation speed, replay stat tiles, hourly doc render
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 24s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 15s
Documentation / Validate Documentation (push) Failing after 10s
Documentation / Generate API Documentation (push) Successful in 11s
Documentation / Build Sphinx Documentation (push) Successful in 20s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 3s
- river dash animation now flows at a speed continuously derived from each segment's discharge (period 260/(Q+45) s, clamped 0.5-5.5 s) via inline per-path animation-duration, so it updates live and per-frame during the replay (CSS speed classes removed - setStyle cannot change classes) - the replay drives the Combined discharge and Strongest flow stat tiles each frame (marked '2024 replay'), restored on finish - docs: hour-by-hour detection detail render (22-28 Sep 2024) showing the model alert at 24 Sep 01:00, flooding at 25 Sep 01:00, and the 24 h warning between them; embedded with commentary - Matrix alerts now link to https://water.buildfor.life/ (override via ALERT_DASHBOARD_URL), replacing the Grafana public dashboard link |
||
|
|
6112c681a7 |
docs: render of actual vs predicted through the 2024 flood; adaptive replay speed
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 24s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 12s
Documentation / Validate Documentation (push) Failing after 7s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 15s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 3s
docs/img/backtest-2024-p1.png: observed P.1 level vs the 24h-ahead predicted peak issued at each hour by a model trained only on pre-flood data, with the warning-probability panel below (first alert 24 Sep 01:00, 24 h before flooding began). Embedded in FLOOD_FORECASTING.md's headline-validation section with an honest reading, including the ~0.4 m peak under-prediction. Replay pacing is now adaptive: 4 h/frame through quiet days, 2 h when risk is elevated, 1 h (hour-by-hour) while the model is alerting or the river is near/above flood stage - so viewers can watch the detection sequence unfold. |