Commit Graph
3 Commits
Author SHA1 Message Date
grabowski 27fa292e09 docs: September 2025 flood render - deployed config, 24 h warning, peak within 7 cm
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 25s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 12s
Documentation / Validate Documentation (push) Failing after 8s
Documentation / Generate API Documentation (push) Successful in 11s
Documentation / Build Sphinx Documentation (push) Successful in 16s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 0s
Documentation / Documentation Summary (push) Successful in 2s
Hour-by-hour chart of the 25-28 Sep 2025 event as forecast by the exact
deployed configuration (trained through 2024, event unseen): first alert
26 Sep 18:00, flooding began 27 Sep 18:00 (24 h lead), predicted peak
4.00 m vs actual 3.93 m. The near-miss 3.51 m crest on 26 Sep correctly
never alerted.
2026-08-10 18:35:55 +07:00
grabowski f0183faa62 feat: discharge-driven river animation speed, replay stat tiles, hourly doc render
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 24s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 15s
Documentation / Validate Documentation (push) Failing after 10s
Documentation / Generate API Documentation (push) Successful in 11s
Documentation / Build Sphinx Documentation (push) Successful in 20s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 3s
- river dash animation now flows at a speed continuously derived from
  each segment's discharge (period 260/(Q+45) s, clamped 0.5-5.5 s) via
  inline per-path animation-duration, so it updates live and per-frame
  during the replay (CSS speed classes removed - setStyle cannot change
  classes)
- the replay drives the Combined discharge and Strongest flow stat
  tiles each frame (marked '2024 replay'), restored on finish
- docs: hour-by-hour detection detail render (22-28 Sep 2024) showing
  the model alert at 24 Sep 01:00, flooding at 25 Sep 01:00, and the
  24 h warning between them; embedded with commentary
- Matrix alerts now link to https://water.buildfor.life/ (override via
  ALERT_DASHBOARD_URL), replacing the Grafana public dashboard link
2026-08-10 18:29:01 +07:00
grabowski 6112c681a7 docs: render of actual vs predicted through the 2024 flood; adaptive replay speed
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 24s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 12s
Documentation / Validate Documentation (push) Failing after 7s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 15s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 3s
docs/img/backtest-2024-p1.png: observed P.1 level vs the 24h-ahead
predicted peak issued at each hour by a model trained only on pre-flood
data, with the warning-probability panel below (first alert 24 Sep
01:00, 24 h before flooding began). Embedded in FLOOD_FORECASTING.md's
headline-validation section with an honest reading, including the
~0.4 m peak under-prediction.

Replay pacing is now adaptive: 4 h/frame through quiet days, 2 h when
risk is elevated, 1 h (hour-by-hour) while the model is alerting or the
river is near/above flood stage - so viewers can watch the detection
sequence unfold.
2026-08-10 18:10:48 +07:00