Commit Graph
5 Commits
Author SHA1 Message Date
grabowski 28b62e5a36 feat: Mae Ngat dam features — built, evaluated, defaulted OFF
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 15s
Documentation / Validate Documentation (push) Failing after 8s
Documentation / Generate API Documentation (push) Successful in 9s
Documentation / Build Sphinx Documentation (push) Successful in 15s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 2s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 27s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
src/ml/dam.py loads rid_reservoir_daily into a leakage-safe hourly frame
(daily row visible from 07:00 its own date, ffill capped at 48 h) and is
plumbed through features/train/predict/evaluate exactly like rain, gated
to the six mainstem stations below the Mae Ngat confluence.

The experiment concludes as a documented NEGATIVE result: on the 2024
record-flood backtest every dam-feature subset costs 1-3 h of first-alert
lead (13h -> 10-12h) for <=3 cm of peak-error gain, because the daily RID
report lags up to 31 h and describes yesterday's benign absorbing
reservoir during fast onset. Features therefore default OFF (--dam
opt-in on the training and backtest CLIs; rise_rain_dam/rise_dam harness
variants, excluded from the default variant set). The ablation also
isolated the HII gap-fill as lead-neutral: the acceptance gate holds at
13 h with fill enabled, and docs/img charts are regenerated with the
shipping configuration. Full table in docs/FLOOD_FORECASTING.md §5.

Review-swarm fixes: evaluate.py skips variants whose feature family is
absent instead of crashing the run; --dam forwards --db-url and warns
loudly when no dam history loads; an empty DB result can no longer wipe
a good dam cache; run-level metrics version claims v4 only when a dam
station is actually in the set.
2026-08-13 20:42:21 +07:00
grabowski df0ae8cda3 feat: hgb-v3 — Open-Meteo rain features clear the 12h warning gate
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 13s
Documentation / Validate Documentation (push) Failing after 7s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 17s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 0s
Documentation / Documentation Summary (push) Successful in 2s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 24s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
The rolling-origin harness (models/eval_rain.json) showed catchment rain
halving flood-year Brier scores, cutting flood-regime MAE 20-40%, and
extending the hard 2024 leads (+6h -> +11h at P.1, +10h -> +19h at
P.103). Ported: train_all loads the catchment-mean series (use_rain /
--no-rain to opt out; without it bundles train as v2), predict fetches
live rain hourly and passes an empty series on failure so rain-trained
bundles serve with NaN features instead of tripping the feature guard,
and the leader worker persists hourly per-point + catchment-mean rows to
a new openmeteo_rain table.

Regenerated backtest: the 2024 record flood now gets a 13-HOUR WARNING
(alert 04:00 vs 17:00 crossing, river at 2.9m at alert time) — the >=12h
acceptance gate PASSES for the first time. Journey on that crossing:
v1 -18h, v2 +6h, v3 +13h. The marginal 2025 double-crest trades its
artifact +46h latch for a calibrated +2h with zero false alarms. P.1
MAE 4.9/7.2/8.7 cm at 6/12/24h. Docs updated throughout.
2026-08-12 17:05:01 +07:00
grabowski 21e9d2e114 feat: hgb-v2 — regression heads predict rise, recovering flood warning lead
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 15s
Documentation / Validate Documentation (push) Failing after 9s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 17s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 28s
Documentation / Documentation Summary (push) Successful in 2s
Rolling-origin evaluation (5 monsoon folds x 4 variants, P.1 + P.103;
results in models/eval_variants.json) showed the absolute-level target
alerting AT the crossing on essentially every event, while the rise
target (future max - current level, level added back at serving) gives
+6h on the hard 2024 crossings, +45h in 2025, fewer false alarms than
weighted/quantile variants, and ~11% better MAE. Weighted and quantile
variants rejected: more false alarms, no Brier-score calibration gain.

Ported to production: train.py fits rise in both eval and refit passes
(sigma/metrics computed in absolute space), bundles stamped hgb-v2 with
regression_target='rise', predict.py adds the level back for v2 and
stays compatible with v1 bundles, backtest_render.py mirrors the same
math. Regenerated backtest charts: 2024 first alert 11:00 24 Sep (6h
BEFORE the 17:00 crossing, was 18h after), 2025 alert 45h ahead, and
the record-peak underprediction is gone (rise models can exceed the
training max). The >=12h acceptance gate still fails honestly at +6h —
closing that needs rainfall inputs. New P.1 MAE 5.0/7.2/9.4 cm at
6/12/24h; docs updated throughout.
2026-08-12 15:43:29 +07:00
grabowski 0005f7dce1 feat: codified backtests, honest docs, belt-and-braces serving, perf fixes
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 13s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 23s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
Documentation / Validate Documentation (push) Failing after 7s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 15s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 1s
Documentation / Documentation Summary (push) Successful in 3s
Retrained on the gap-filled DB (592k -> 976k rows) and re-examined the
flood backtests, now reproducible via scripts/backtest_render.py (renders
the three docs/img charts and gates on a >=12h 2024 first-alert lead —
currently failing by design and documented as such).

Findings, all documented in FLOOD_FORECASTING.md: the true 2024 crossing
was 24 Sep 17:00 (8h earlier than recorded; confirmed against the
independent HII sensor), the historical 24h-warning claim was partly a
missing-data artifact, and retrained warn classifiers collapse on the
filled grid (P.1 24h PR-AUC 0.900 -> 0.288) while regression MAE improves
(11.3 -> 10.5 cm). Serving therefore becomes max(classifier,
sigmoid(regression)) so alerting is never worse than the regression path;
metrics table, head-gating tiers, honest-limits and runbook expectations
all updated to the current model (hgb-v1+d2d0e65).

Perf, from Locust load testing (scripts/locustfile.py + load_test.py):
single-flight lock around /forecast inference (concurrent cache misses
previously each ran ~18s inference and starved the shared thread pool;
200-user run after: 105 rps, 0.01% errors), and /measurements/latest +
/health moved off the event loop (synchronous DB/network calls in async
handlers were stalling every request under load).
2026-08-12 10:46:00 +07:00
grabowski 27fa292e09 docs: September 2025 flood render - deployed config, 24 h warning, peak within 7 cm
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 25s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 12s
Documentation / Validate Documentation (push) Failing after 8s
Documentation / Generate API Documentation (push) Successful in 11s
Documentation / Build Sphinx Documentation (push) Successful in 16s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 0s
Documentation / Documentation Summary (push) Successful in 2s
Hour-by-hour chart of the 25-28 Sep 2025 event as forecast by the exact
deployed configuration (trained through 2024, event unseen): first alert
26 Sep 18:00, flooding began 27 Sep 18:00 (24 h lead), predicted peak
4.00 m vs actual 3.93 m. The near-miss 3.51 m crest on 26 Sep correctly
never alerted.
2026-08-10 18:35:55 +07:00