README usage: mixed rect+pads selection example, solve-time warning
Build PCM package / build (push) Successful in 8s
Build PCM package / build (push) Successful in 8s
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
@@ -58,8 +58,14 @@ SWIG API. Requires KiCad **10.0.1+**.
|
|||||||
`ELECTRODE_NEG_LAYER`), any number per side, axis-aligned;
|
`ELECTRODE_NEG_LAYER`), any number per side, axis-aligned;
|
||||||
- **pads and vias** (SMD pad: real copper shape on its own layer;
|
- **pads and vias** (SMD pad: real copper shape on its own layer;
|
||||||
through-hole pads and vias become **barrel contacts**: the current
|
through-hole pads and vias become **barrel contacts**: the current
|
||||||
enters at the drill wall on every spanned layer, see below);
|
enters at the drill wall on every spanned layer, see below).
|
||||||
selected pads/vias fill a side that has no rectangles;
|
Selected pads/vias fill the side that has **no rectangles**, so
|
||||||
|
mixing both kinds is the everyday workflow: e.g. select **one
|
||||||
|
rectangle on `User.1`** (V+) **plus any number of pads / THT
|
||||||
|
holes** (Ctrl-click) — the pads together form the V− terminal
|
||||||
|
(a connector's pin group, a via cluster, …). All selected
|
||||||
|
pads/vias go to that one side; if both marker layers already
|
||||||
|
provide rectangles, selecting pads on top is an error;
|
||||||
- legacy: exactly 2 selected contacts with no marker rectangles still
|
- legacy: exactly 2 selected contacts with no marker rectangles still
|
||||||
works; empty selection scans the whole board's marker layers.
|
works; empty selection scans the whole board's marker layers.
|
||||||
2. **Select the contacts**, click the **Fill Resistance** Ω button.
|
2. **Select the contacts**, click the **Fill Resistance** Ω button.
|
||||||
@@ -68,7 +74,11 @@ SWIG API. Requires KiCad **10.0.1+**.
|
|||||||
("All selected layers" = bolted-lug/through contact), the **test
|
("All selected layers" = bolted-lug/through contact), the **test
|
||||||
current**, and optionally a grid cell size. Multiple layers are coupled
|
current**, and optionally a grid cell size. Multiple layers are coupled
|
||||||
through the net's via/pad barrels automatically.
|
through the net's via/pad barrels automatically.
|
||||||
4. Read R / voltage drop / total power in the figure titles and status
|
4. Wait for the solve. Depending on board size, included layers, cell
|
||||||
|
size and your hardware it can take **considerable time** — large
|
||||||
|
multi-layer pours at fine cell sizes may run for minutes (on our
|
||||||
|
test setup a typical real-board run finishes in ≈ 8 s). Then read
|
||||||
|
R / voltage drop / total power in the figure titles and status
|
||||||
bar. Outputs land in `<board dir>\fill_res_results\<timestamp>\`:
|
bar. Outputs land in `<board dir>\fill_res_results\<timestamp>\`:
|
||||||
per-layer `1_raster_map` / `2_potential` / `3_current_density` /
|
per-layer `1_raster_map` / `2_potential` / `3_current_density` /
|
||||||
`4_power_density` PNGs, `summary.txt` (incl. the busiest vias with
|
`4_power_density` PNGs, `summary.txt` (incl. the busiest vias with
|
||||||
|
|||||||
Reference in New Issue
Block a user