A separate FreeCAD 26.3 model (the Mueang Chi model is untouched) sites the plant on a 110 m square placeholder plot of Payap land, built from BIM objects (Arch Site, Buildings and Levels, walls, slabs, columns, beams, a ramp, Spaces with computed areas, Equipment). Every object sits on an expression-driven base, so the Params sheet drives plot, setbacks, floor level, building sizes, fire wall line and office gap (checked: plot 110 to 120 m and factory 84 to 90 m, everything followed). - Factory 84 x 25 m, production only, in process order along a 54 m glazed corridor; press hall 465 m2 with the October fleet (two Duplex systems, each EX 50 + EX 35, and the Classic); crane to the fire wall; machine door and 12 m ramp at the north-west corner. - Office building 24 x 15 m, 12 m away on its own slab with a covered link: reception, offices, meeting/training, mastering and cutting, listening, IT, archive. Resolves the crane-zone conflict of the old sketch. - Utility yard behind the press hall (boiler and chiller flagged for re-sizing), gate, truck apron, car park, service road. - site-candidates: new section and plot-fit note; crane doc: conflict resolved, 54 m corridor; README bullet and layout lines; the old sketch is labelled as Mueang Chi with the earlier fleet.
331 KiB
2069x1212px
331 KiB
2069x1212px