Models the plot and everything on it in FreeCAD, and writes up the decisions the modelling forced. Parcel geometry is traced from the DOL LandsMaps cadastral polygon and reconciled against that portal's own measured edge lengths (40.86 + 26.61 / 166.81 / 42.48 + 14.94 / 152.46 m), which the trace reproduces to within about 1% with 1.67 m of closure error over a 444 m perimeter. Note the mapped extent comes out near 9,570 sqm against a deed area of 8,266 sqm, a ~16% gap that needs a surveyor before any offer. On the site: 60x25 m production building on a 10 degree monopitch, a 45x38 m phase-2 building, roof and carport PV, fire and raw water tanks, a detached boiler/chiller utility yard, perimeter wall and gate, guard house, roofed staff parking, and the loading and fire-access roads. Docs: - scale.md: expansion headroom for a second building, and the detached utility yard, which frees ~126 sqm inside the main shed - sustainability.md: roof orientation study (rotating the building for solar gains under 1 point and costs 4 m of clearance, so it stays aligned to the plot), and a new water supply section - facility-security.md: fire water supply behind the existing suppression design Figures marked as estimates are planning-grade, not engineering calculations; the PV module spec is a generic placeholder, and zoning for factory use on this plot is still unverified.
26 lines
285 B
Plaintext
26 lines
285 B
Plaintext
# Claude Flow / Ruflo runtime state
|
|
.claude-flow/
|
|
.swarm/
|
|
*.db
|
|
*.db-shm
|
|
*.db-wal
|
|
*.log
|
|
*.tmp
|
|
|
|
# Local Claude config (kept out of the repo)
|
|
.claude/
|
|
CLAUDE.md
|
|
|
|
# Node
|
|
node_modules/
|
|
|
|
# Env
|
|
.env
|
|
.env.local
|
|
|
|
# FreeCAD auto-backups
|
|
*.FCBak
|
|
|
|
# Playwright MCP session output
|
|
.playwright-mcp/
|