User, October 2026: the factory is too small and needs room to grow (possibly ten more Classics), one shared hydraulic and air supply, water treatment perhaps in a separate building connected to the galvanics lab, and a fully equipped workshop (maintenance tools, 3D printers, maybe a lathe and a small CNC mill). Model (rebuilt live in FreeCAD 26.3, BIM objects, Params-driven, parametric check plot 135->145 m and factory 112->120 m passed): - plot 135 m (11.4 rai) with a reserve; factory 112 x 25 m, 16 bays, 82 m visitor corridor, fire wall at 90 m; - press hall ~870 m2: two Duplex systems (EX 50 + EX 35), the Classic, ten future Classic positions in two rows on a service trench; - central hydraulics and compressed-air plant room (~62 m2); - water treatment building 12 x 10 m behind galvanics: buried duct (gravity from the +1.2 m floor), covered crossing 6 m clear; - workshop ~200 m2 with benches, tool cabinets, 3D printers, lathe, small CNC mill, drill, saw, welding bay, press, washer, measuring table. Docs: galvanics (water treatment building, proposed), crane doc (workshop fit-out; lathe and CNC mill not yet priced; corridor now 82 m), site-candidates Payap section rewritten, README bullet.
365 KiB
2172x1274px
365 KiB
2172x1274px