Files
cnx_vinyl/docs/payap-partnership.md
T
grabowski 967e6b1c76
Deploy test site / deploy (push) Successful in 2m40s
Payap still an option: rezoning route; order example opaque
User, 20 Oct 2026: Payap University claims they can rezone the land;
update the deck to show it is still an option. And: do not use a
transparent vinyl as the example in the order tool screenshot.

- land-listings/payap/rezoning-2026-10-20.md (new): what a rezoning is
  under the Town Planning Act B.E. 2562 (section 35 amendment started by
  DPT or the local official, Town Planning Commission, 30-day posting
  with objections, Ministry of Interior notification via Cabinet and the
  Royal Gazette; a landowner can ask, not rezone), the DPT's own work
  plan (~70 weeks without objections, ~82 with: ~16 to 19 months), the
  schedule effect (roughly a year on first production unless the request
  starts now; estimate) and what to ask Payap. DPT procedure PDF filed.
- site-candidates.md: Payap "still an option" in the table, rezoning
  paragraph with an Open action, check 1 and the re-siting rule; zoning
  record, payap-partnership.md and README point to it.
- Business plan 6.1, risk table and critical path: Payap's rezoning
  claim and its ~16 to 19 months; A and B rebuilt (63 pages, checked).
- Deck: site slide names Payap as an option once rezoned, notes and
  source line; risk row updated.
- order.html: the "Splatter 12"" preset now has a white base instead of
  clear; deck platform screenshots re-shot in both themes (numbers
  unchanged: 100 fans, break-even 46, ~480 THB kept). Order checks 96/96,
  fan parity 206/206; deck verify clean in both themes, PDFs rebuilt.
2026-10-20 14:58:40 +07:00

5.1 KiB

Payap University Partnership

Two strands came out of the October 2026 conversations with Payap University: land it would lease to the project (see site candidates), and close collaboration on new student programmes built around the plant: audio engineering (mastering and lathe cutting), IT, business administration and more. This page holds the programme strand. Nothing is agreed yet; scope, form and money are open.

Why it fits

  • The hardest hires are the programme subjects. Mastering and cutting engineers are an open item in the supplier map, and the plant needs one or two at maturity (scale). A cutting and mastering programme is a hiring pipeline for the plant, and for the region.
  • Payap brings what a factory does not have: a College of Music, IT, business administration and communication arts faculties, an International College teaching in English, and a Faculty of Pharmacy with analytical labs.
  • The plant brings what a university cannot: a working cutting lathe, real production data and a factory application with real users.

Programme areas against the plant

Area What students work on Where it lives in this repo
Mastering Mastering for the physical limits of the groove, side length against format, technical QA, the approval workflow with the artist process flow stages 1 and 2, the audio checks on the artist platform
Lathe cutting Test cuts and lacquers, groove microscopy, dead-wax scribing, pitch and depth automation (Sillitoe Space / Time Control or the Agnew route) vendor landscape, part marking in quality automation
IT The factory application (cnx-factory), data acquisition, traceability, the artist platform, operations on the NixOS fleet digital factory, traceability, artist platform
Business administration Costing and the price calculator, production planning and lead times, export sales and logistics, fan-funded campaigns, BOI compliance revenue model, production timeline, BOI
To discuss Music (recordings for the programme and the platform), communication arts (label and artist marketing, plant tours), science and pharmacy (the PVC material lab, galvanics chemistry) quality automation, galvanics and stamper prep

What it changes in the plan

  • The cutting room moves up the agenda. The roadmap puts mastering and cutting last (item 27), earlier only if title-services demand shows up. A teaching programme is a second reason to bring it forward, as a room that trains students and cuts customer lacquers. The teacher comes before the students: an experienced cutting engineer, or the lathe vendor's training, has to be in place first. Student test cuts consume lacquer blanks and styli, a running cost to price into the programme.
  • Pre-release security. Labels ask how unreleased audio is protected. Teaching uses own or licensed material (Poy Records, recordings from Payap's College of Music); customer masters only under NDA and the room access control in facility security.
  • Safety and access. Students on the plant floor fall under the worker safety programme; the galvanics clean room is seen through the visitor corridor window, not entered (crane, workshop and tours). IT students work on a staging copy of the factory application and on exported data, never with write access to production systems.
  • Location. On Payap land the plant and the classroom share a campus; at Mueang Chi they are ~35 km apart. The programme works better with the Payap site but need not depend on it. The first Payap plot needs rezoning, which Payap says it can obtain (20 October 2026; what that takes: site candidates).
  • BOI. R&D contracted with a Thai university and training cooperation may count toward the R&D merit measure; an open item in BOI.

Form, to agree with Payap

Start small and formal: a memorandum of understanding, internships and work-integrated learning, and jointly taught short certificate courses in mastering and lathe cutting. Degree tracks come later, because new degree programmes go through the university's own curriculum approval and national accreditation; Payap knows those lead times.

To settle in writing: who teaches what; who owns equipment used for teaching; lathe and room time for teaching against production; fees and how they are shared; who owns student work that uses plant data; and confidentiality.

Questions for the next meeting: which faculties and programmes, on what timeline; what Payap expects from CNX (instructors, equipment, internships, funding); whether the programmes are tied to the land lease.