User, October 2026: we want unified Engelbert Strauss work clothes.

- worker-safety.md: decision recorded; everyone, office included, in the
  same Strauss workwear with the company logo, process PPE on top. Kit at
  Strauss catalogue prices checked October 2026 (incl. 19 % German VAT,
  which drops out on export): production 3 trousers e.s.motion 2020, 3
  polo shirts, 2 T-shirts, a sweatshirt, S1 safety shoes e.s. Vasegus II
  low, ~293 EUR before VAT, ~338 with embroidered logos (embroidery price
  an estimate); office 4 polos and a softshell jacket, ~127 EUR. Ordering:
  Strauss ships outside Germany where customs law allows, shipping quoted
  with the order, prepayment, duty and taxes charged to the recipient;
  Thai duty on work trousers 13.8 %, BOI does not cover clothing. About
  9k USD (~0.3M THB) a year at the start fleet. Check lighter lines for
  the press hall heat with samples.
- revenue-model.md: workwear noted on top of the x1.3.
- Fleet calculator: workwear line under labour (production and office
  kits a year, shipping and Thai duty), six new assumptions; 8,573 USD a
  year at the defaults.
2026-10-10 20:46:27 +07:00
grabowski 1a368287f8 Labour from base salaries; health care with check-ups for all staff
Deploy test site / deploy (push) Successful in 34s
User, October 2026: option to enter base salaries; the company should
provide proper extra health care with check-ups for all staff.

- worker-safety.md: new "Health care for all staff" policy (decided
  October 2026): group health insurance (inpatient and outpatient) and a
  yearly check-up for everyone, office included, on top of social
  security; the occupational checks Thai law requires for risk-factor
  work (Ministerial Regulation B.E. 2547: within 30 days, then yearly, by
  an occupational physician, records kept 2 years after the job ends) for
  the press floor, galvanics and maintenance; planning costs with sources
  checked October 2026 (group insurance ~8,000 to 18,006 THB a head a
  year, plan ~15,000; Rajavej Chiang Mai check-ups 1,290 to 5,990 THB,
  plan ~2,500 plus ~1,500 risk-factor tests, estimates); social security
  5 % up to the 17,500 THB ceiling since 1 January 2026.
- revenue-model.md: cutting engineer 50,000 THB is base salary; health
  care on top of the x1.3 (~0.35M THB a year at the start fleet); what the
  x1.3 is made of.
- Fleet calculator: base salaries per role (the revenue model loaded
  rates / 1.3; cutting engineer 50,000), employer social security 5 %
  capped at 17,500, 25 % overtime, bonus and PPE, health insurance and
  check-ups for all staff incl. 4 office staff (scale.md 3 to 5), risk-
  factor tests for the press floor, galvanics and maintenance; all as
  editable assumptions; people table gains office and all-staff rows.
  Defaults: labour 5.25M THB (was 4.67M loaded), direct cost 1.90 USD a
  record, EBITDA 2.19M USD.
2026-10-10 20:17:39 +07:00
grabowski 917a3eb933 Plan the overhead crane, maintenance workshop and visitor corridor
New docs/crane-workshop-tours.md: a 5 t single-girder EOT crane over the
whole production compartment (stops at the warehouse fire wall), a
machine door and crane-served workshop/machine bay at the ramp end, and
a glazed ground-level visitor corridor along the car-park elevation with
stations in process order, its own air and acoustic glazing so tours
need no PPE. Covers what each changes in the shell (crane-ready frame,
hook height under the 7.0 m eave, no full-height cross walls in the
crane zone, room lids and crane hatches), safety, costs and open
decisions.

Propagated: construction RFQ (crane-ready frame, new section 1c, machine
door, accessible 1:12 entrance now required), scale zone table (+210 to
280 m2, total ~1,400 to 2,000 m2), facility security, worker safety,
roadmap items 9 and 15, total investment added-scope table, README.
2026-10-02 17:34:24 +02:00
grabowski 0a4f47a5cc Split README into topic documents
- README reduced to overview with linked document index
- docs/equipment/pressing-line.md: fleet strategy, Newbilt plan, site reqs
- docs/suppliers/vendor-landscape.md: researched vendor narratives
- docs/sustainability.md: solar, zero-discharge water, materials
- docs/worker-safety.md: training, clean rooms, PPE
- docs/facility-security.md: access control, CCTV, archive/audio protection,
  fire and life safety, plant monitoring, Thai compliance anchors
2026-07-17 12:51:04 +07:00