Commit Graph
4 Commits
Author SHA1 Message Date
grabowski d194ebdc30 Add tiered PVC lab checks: per-lot benchtop, in-house workhorses, external qualification panel 2026-07-17 15:23:36 +07:00
grabowski 5b6beba305 Soften packaging assembly-check claim per review 2026-07-17 15:17:11 +07:00
grabowski d85e8fec8d Add raw PVC per-lot and packaging QC gates to quality automation spec 2026-07-17 15:16:33 +07:00
grabowski 808e3e34b8 Add quality automation spec: stamper metrology and layered record QC
- Keyence-class instrument stack for father/mother/stamper analysis
  (VK-X confocal sampled zones, VR-6000 wide-area, XRF thickness) with
  genealogy integration via middleware
- Three-layer pressed-record QC: 100% inline optical inspection,
  per-cycle press telemetry, sampled automated audio comparison
- Honest limits documented: no turnkey products exist for the optical
  and audio layers; 100% audio QC impossible at press speed
2026-07-17 13:56:45 +07:00