Commit Graph
5 Commits
Author SHA1 Message Date
grabowski bd357ab03f Business plan draft 0.3 in two versions: Plan A ~180M and Plan B ~225M THB
Deploy test site / deploy (push) Successful in 52s
- One build makes both documents: plan_variant.py switches the
  plan-specific text (pick / is_a / label); build_plan.py writes
  CNX-Vinyl-Business-Plan-A and -B (docx), export_pdf.py exports both PDFs
  with the table of contents filled in. Draft 0.2 (single launch-plant
  plan with contingency) is removed; it stays in the history.
- Plan A: the launch plant with every machine and six cost levers, ~177M
  THB with the ramp-up reserve, no contingency. Plan B: the second Duplex
  at launch, five presses, ~224M THB on the same basis. Each version reads
  as a complete plan with one table comparing it with the other; the
  216M investor-question text is gone, Pheenix is priced at OMS's
  reference plus 20 %.
- Calculator renders in both documents, each from its own preset: the
  plant at a glance (Figure 4), the budget check (Figure 5) and ten years
  of cash (Figure 6), in docs/renders/calculator/.
- Calculator budget card: the verdict and third KPI now name the tightest
  budget the midpoint fits (Plan A: 3.3M to spare under 180M; Plan B:
  0.8M under 225M) instead of always 225M.
- Fixes: CD replication cross-references point to section 4.10; the
  blended price in section 3.3 and roadmap item 1 is 3.76 to 5.27 USD at
  60 % specials (3.50 to 4.60 at a standard-heavy mix).
2026-10-17 15:42:35 +07:00
grabowski bbeaed7e87 Add loading dock, second gate, and phase 1 construction RFQ
Site model: two sealed dock positions on the north gable (depressed
12 m pit + 12 m ramp cut into ground and paving), water treatment
moved clear of the cooling tower, second car/staff gate on the NE
edge with access road to parking, guard house relocated between the
gates, perimeter wall rebuilt continuous on its 0.4 m inset line,
leftover door recesses filled on both envelopes, loading-apron
marking removed. Renders re-exported.

Docs: phase 1 contractor pricing request (PEB spec, PIR envelope,
dock, site works, exclusions, soil caveats).
2026-07-30 18:11:30 +07:00
grabowski ed987b4375 Fix render camera orientation so world up is up in frame
setViewDirection leaves camera roll unconstrained, so the aerials came
out with a tilted horizon. The camera orientation is now built explicitly
with world +Z projected as the frame up-vector.

Two FreeCAD quirks had to be worked around. setCameraOrientation() goes
through an animated setter (UseAnimation defaults on), so saveImage fired
mid-transition and the roll drifted; setting the Coin camera node
directly avoids the animation entirely. The first call after a standard
view also needs a second application to take, so each render now verifies
up.z equals cos(elevation) before saving and retries if not.

Also tightened framing 20%, since fitAll was zooming out to include the
road strip that runs well past the parcel.
2026-07-30 01:12:28 +07:00
grabowski 9aff3a5c24 Replace renders with a top-visible set only
The first pass included two orthographic elevations and a low approach
view, which read the site edge-on and showed no roof. Dropped those.

The set is now six views that all look down: a straight-down site plan,
four aerials at 45 degrees from each corner, and one 35 degree hero shot.
2026-07-30 00:58:09 +07:00
grabowski e2ad342a1a Export site renders; pin the freecad-mcp MCP server
Nine 2400px views of the site model in docs/renders: an isometric, a
site plan, dimetric and trimetric, four aerial obliques from each corner,
a low approach view from the road, and two orthographic elevations.

Also hardens the freecad MCP entry added in the previous commit. It ran
"uvx freecad-mcp" unpinned, which resolves and executes whatever version
is current at every launch. Now pinned to 0.1.20 and marked optional, in
line with the ruv-swarm and flow-nexus entries alongside it.
2026-07-30 00:54:20 +07:00