OMS introduction letter and links, Sibert's answer (9 October 2026)
OMS (Lou Wullms) sent its introduction letter, filed in docs/equipment/oms/: wet-room units with reference prices, two 4-cell configurations (EUR 224,000 basic with two EFS2-200, EUR 311,000 advanced with one AEFS4-250 and PLC; installation days extra), capacities of 24 and 32 shells in an 8-hour day, utilities, rooms, staffing, used equipment, and five contacts for buying a cutting lathe. Recorded in galvanics.md (tables, our reading: the advanced units add up to EUR 314,000, know-how transfer is left out of both totals although CNX has no plating know-how, the basic set has no passivation unit), the exhibitor follow-ups, vendor landscape (new section on used lathes and cutting-room contacts, plus Lou's three websites), supplier map, roadmap items 6 and 13, total investment (basis note only, block unchanged) and the scale people estimate. Open: forward the letter to Simona, as Lou asked. Sibert (Ian Locke, 9 October): footprints and formal quotations when we are ready; settle the pressing side first, hopefully with Pheenix, and mention his recommendation if we do; impressed by the green-factory plans (supplier feedback). Open: pass on the recommendation if Pheenix is chosen. CNX-01 in proplan: OMS basic and advanced added as options to D-002 with their reference prices in THB; budget line 3 notes the OMS range.
This commit is contained in:
1 parent
90d8a3778a
commit
f1334f4756
9 files changed
+235
-27
No files matched your search
+5
-1
@@ -215,7 +215,11 @@ small against the connection, but its own feeder and meter.
|
||||
Rough mature-operation headcount (estimate): 4 to 6 press/finishing
|
||||
operators per shift, 2 to 3 galvanics, 1 to 2 mastering/cutting engineers,
|
||||
1 to 2 QC, 2 maintenance, 3 to 5 admin/sales/logistics. Roughly **15 to 25
|
||||
people** across shifts at maturity, fewer than half that at launch.
|
||||
people** across shifts at maturity, fewer than half that at launch. For
|
||||
galvanics, OMS's rule of thumb (one person runs about 20 stampers a day,
|
||||
two from about 30) against the 8 to 20 parts a day at full capacity
|
||||
points to one operator per shift
|
||||
([galvanics and stamper prep](equipment/galvanics.md)).
|
||||
|
||||