OMS introduction letter and links, Sibert's answer (9 October 2026)
OMS (Lou Wullms) sent its introduction letter, filed in docs/equipment/oms/: wet-room units with reference prices, two 4-cell configurations (EUR 224,000 basic with two EFS2-200, EUR 311,000 advanced with one AEFS4-250 and PLC; installation days extra), capacities of 24 and 32 shells in an 8-hour day, utilities, rooms, staffing, used equipment, and five contacts for buying a cutting lathe. Recorded in galvanics.md (tables, our reading: the advanced units add up to EUR 314,000, know-how transfer is left out of both totals although CNX has no plating know-how, the basic set has no passivation unit), the exhibitor follow-ups, vendor landscape (new section on used lathes and cutting-room contacts, plus Lou's three websites), supplier map, roadmap items 6 and 13, total investment (basis note only, block unchanged) and the scale people estimate. Open: forward the letter to Simona, as Lou asked. Sibert (Ian Locke, 9 October): footprints and formal quotations when we are ready; settle the pressing side first, hopefully with Pheenix, and mention his recommendation if we do; impressed by the green-factory plans (supplier feedback). Open: pass on the recommendation if Pheenix is chosen. CNX-01 in proplan: OMS basic and advanced added as options to D-002 with their reference prices in THB; budget line 3 notes the OMS range.
This commit is contained in:
1 parent
90d8a3778a
commit
f1334f4756
9 files changed
+235
-27
No files matched your search
+143
-12
@@ -17,7 +17,8 @@ line-up drawing, sent by Sibert's Ian Locke on 5 October 2026, in
|
||||
[`sibert/`](sibert/); the April 2021 issues they replace are in
|
||||
[`sibert/specs-2021/`](sibert/specs-2021/)), plus Sibert's 2008 to 2009
|
||||
optical-disc literature (below). Every figure here is vendor-published, not
|
||||
quoted; the only price is Sibert's budget confirmation by email (below).
|
||||
quoted; the only prices are Sibert's budget confirmation by email and
|
||||
OMS's reference prices in its introduction letter (both below).
|
||||
Digital Matrix / Plating Power stays the comparison; its datasheets are not
|
||||
in the repo yet (see the
|
||||
[vendor landscape](../suppliers/vendor-landscape.md)).
|
||||
@@ -122,8 +123,9 @@ and refurbishes vinyl electroforming equipment, including conversions of
|
||||
CD/DVD electroforming lines to 14" vinyl. The same directory gives
|
||||
Newbilt's equipment page as OMS's website, and that page announces new
|
||||
Newbilt electroplating equipment with the portfolio "presented here soon";
|
||||
whether OMS builds it is not confirmed, so ask both. No OMS datasheet or
|
||||
price is on file.
|
||||
whether OMS builds it is not confirmed, so ask both. OMS's introduction
|
||||
letter (below) presents the units as its own designs (EFS2-200, AEFS4-250)
|
||||
and does not mention Newbilt.
|
||||
|
||||
What it adds: a third galvanics vendor next to Digital Matrix and Pheenix,
|
||||
named by a supplier who knows Lou Wullms and has installed equipment at
|
||||
@@ -149,9 +151,121 @@ will work on the project. Company details as OMS gives them:
|
||||
|
||||
Alexander has replied to confirm (October 2026), with the split Lou asked
|
||||
about: Simona covers management and the audio side, Alexander the
|
||||
technical side, so galvanics questions go to Alexander. **Next step: wait
|
||||
for his material**, then file it here and answer the OMS questions below
|
||||
from it.
|
||||
technical side, so galvanics questions go to Alexander.
|
||||
|
||||
#### OMS introduction letter (9 October 2026)
|
||||
|
||||
Lou Wullms sent his material two days later: an introduction letter to
|
||||
Alexander and Simona, filed as
|
||||
[`oms/OMS_Introduction_letter_2026-10-09.docx`](oms/OMS_Introduction_letter_2026-10-09.docx).
|
||||
He asks Alexander to give Simona a copy so that she can work through the
|
||||
figures. **Open:** forward the letter to Simona. It is an introduction,
|
||||
not an offer: the prices are "for reference only", final pricing comes
|
||||
with an official quote, and a dedicated offer needs our plans first. Lou
|
||||
would rather explain the options in Baarlo, where the equipment can be
|
||||
seen.
|
||||
|
||||
Background, as Lou gives it: from 1986 to 1994 at Philips' optical-disc
|
||||
equipment business (ODM, then OD&ME and ODME, the company later called
|
||||
Toolex Alpha); two years setting up a CD plant with mastering and
|
||||
electroforming at WPME in Kaarst, Germany; then OMS, for service to the
|
||||
optical-disc industry; involved in setting up Mimeos, a CD and later DVD
|
||||
stamper service that closed in 2012; in vinyl stamper production since
|
||||
2015. OMS runs an independent stamper service for vinyl plants and builds
|
||||
the wet-room equipment to its own designs.
|
||||
|
||||
The wet room for a turnkey line, with the letter's reference prices:
|
||||
|
||||
| # | Unit | What it does | EUR, reference |
|
||||
|---|---|---|---|
|
||||
| 1 | Wet bench | Cleaning, rinsing, soaking, wetting and pre-treating the lacquer | 20,000 |
|
||||
| 2a | Silvering booth, manual (\*) | Silvering the lacquer | 16,000 |
|
||||
| 2b | Silvering booth, automatic/manual (\*) | The same, automatic | 22,000 |
|
||||
| 3 | Pre-plate, 4 positions (\*) | First plating of the silvered lacquer at lower temperature and current | 45,000 |
|
||||
| 4a | Electroforming unit EFS2-200, 2 cells | Fast plating; the basic unit | 55,000 each |
|
||||
| 4b | Electroforming unit AEFS4-250, 4 cells with PLC | The advanced unit | 155,000 |
|
||||
| 5 | Cleaning / passivation | Extra cleaning of the stamper at high temperature and current; passivation | 25,000 |
|
||||
| 6 | Spin dryer | Spin-drying DMMs, lacquers and stampers; scuffing (pre-treatment) of DMMs and lacquers | 14,000 each |
|
||||
| 7 | Know-how transfer, including training at OMS | | 10,000 |
|
||||
| 8 | Silvering recipe | | 5,000 |
|
||||
|
||||
(\*) Not needed for stampers made only from DMMs: these are the lacquer
|
||||
path. The model names of the electroforming units come from the
|
||||
letter's expansion lines.
|
||||
|
||||
The letter totals two configurations:
|
||||
|
||||
| | Basic | Advanced |
|
||||
|---|---|---|
|
||||
| Units | 1, 2a, 3, 2 × 4a, 2 × 6, 8 | 1, 2b, 3, 1 × 4b, 5, 3 × 6, 8 |
|
||||
| Cells | 4 (two EFS2-200) | 4 (one AEFS4-250, PLC) |
|
||||
| Total in the letter | **EUR 224,000** (~USD 259k) | **EUR 311,000** (~USD 359k) |
|
||||
| One 8-hour day (30 min lunch included) | "7 runs should be possible", then counted with 6: 6 × 4 = **24 shells** | 8 × 4 = **32 shells** |
|
||||
| Doubling | 2 more EFS2-200, EUR 110,000, "over 50 stampers a day" | 1 more AEFS4-250, EUR 155,000, "over 68 stampers a day" |
|
||||
|
||||
USD at the [total investment](../finance/total-investment.md) rate of
|
||||
1 EUR = 1.155 USD. Reading the letter:
|
||||
|
||||
- **The sums.** The basic total adds up; the advanced units add up to EUR
|
||||
314,000, not the 311,000 stated. A re-quote point.
|
||||
- **Know-how transfer is left out of both totals**, with the note that
|
||||
electroplating know-how "is already present at your facility". That is
|
||||
not the case for CNX: nobody on the team has run a plating room. With
|
||||
the EUR 10,000 item (training at OMS included) the totals are EUR
|
||||
234,000 and 321,000, ~USD 270k and 371k (our reading).
|
||||
- **The basic set has no cleaning/passivation unit** (item 5). Ask how
|
||||
parts are passivated between generations without it.
|
||||
- **Installation is extra**: training and start-up on site at EUR 1,200 a
|
||||
day each, travel days at EUR 600, all other costs invoiced on top.
|
||||
- **Used equipment** is also on offer ("good used/pre-owned equipment").
|
||||
- **Finishing is not OMS's scope.** For back-polishing, centre punching and
|
||||
forming/trimming the letter points to Sibert and Ian Locke as the
|
||||
reference, as Sibert pointed to OMS for electroforming.
|
||||
|
||||
What it changes in the plan:
|
||||
|
||||
- **Price.** A complete 4-cell wet room at ~USD 259k to 371k, depending
|
||||
on the configuration and the know-how item, is at or below the low end
|
||||
of the USD 320k to 650k galvanics block in
|
||||
[total investment](../finance/total-investment.md). Neither includes
|
||||
water treatment (its own block) or installation days. Reference prices,
|
||||
so the block stays until quotes exist.
|
||||
- **Capacity.** 6 to 8 runs in a 7.5-hour working day is roughly an hour a
|
||||
run, which matches the 1 to 1.5 hours per part the cell count below
|
||||
assumes. Full capacity needs 8 to 20 parts a working day, so either
|
||||
4-cell configuration covers it on one shift, and the doubling options
|
||||
buy headroom only. This is the first vendor figure on cycle times.
|
||||
- **Staff.** One person runs about 20 stampers a day; from about 30 a day
|
||||
it takes two. Lou asks for people who work accurately and precisely,
|
||||
attentively, and like clean work. At the plant's 8 to 20 parts a day that
|
||||
is one operator per shift ([scale](../scale.md) people estimate).
|
||||
- **Utilities and rooms.** Compressed air, a demineralised-water system,
|
||||
waste-water collection or treatment, and cooling water, which Lou says
|
||||
can be passive, with no active chiller (he expects this needs more
|
||||
discussion). The Pheenix PDPU asks for 12 to 20 °C cooling water, so
|
||||
whether passive cooling holds at 30 °C and more ambient is a question for
|
||||
Lou. Space beyond the wet room: an acid cabinet with fume extraction for
|
||||
mixing chemicals, storage for stampers, lacquers and DMMs, a quality
|
||||
room with turntable, speakers and inspection microscope, spare parts and
|
||||
consumables. Smaller items: a drill stand for removing lacquer from the
|
||||
back of lacquers, lab ware (glass and PP ware, temperature sensor,
|
||||
density meter, pH meter), and a laundry washing machine and a concrete
|
||||
mixer for cleaning the anode baskets and anode bags.
|
||||
- **Data.** The AEFS4-250 has a PLC: programs of up to 20 steps, each step
|
||||
setting time, voltage, current, flow and rotation; an automatic wake-up
|
||||
function and pump-curve calibration; a modified cell flow that allows
|
||||
higher current "without stretching the bath solution". Lou calls it very
|
||||
energy-efficient with extremely low maintenance (vendor claims). The
|
||||
protocol is not stated, so the [digital factory](../digital-factory.md)
|
||||
RFQ clauses apply. The letter mentions no PLC for the basic EFS2-200,
|
||||
which would keep galvanics a manual check-in station.
|
||||
- **DMM.** The lacquer-path units (2a or 2b, and 3) are EUR 61,000 to
|
||||
67,000 of either configuration; a plant cutting only DMM would not need
|
||||
them, which bears on the Sillitoe DMM question in the
|
||||
[vendor landscape](../suppliers/vendor-landscape.md).
|
||||
- **Cutting lathes.** The letter ends with five contacts for buying a
|
||||
lathe, second-hand included; they are in the
|
||||
[vendor landscape](../suppliers/vendor-landscape.md#used-lathes-and-cutting-room-contacts-via-oms).
|
||||
|
||||
### Cycle times and cell count
|
||||
|
||||
@@ -190,7 +304,9 @@ first version of this page assumed 2 to 3 hours per part and concluded
|
||||
that the high end needed two. One PASU, one PPPU (pre-plate is for the
|
||||
masters, 2 to 4 a day at full capacity, and the unit takes four at once)
|
||||
and one PMPB cover the rest. Ask Pheenix for measured cycles at the
|
||||
plant's thickness before this goes into a budget.
|
||||
plant's thickness before this goes into a budget. OMS's letter (above) is
|
||||
the first vendor figure: 6 to 8 runs on 4 cells in a 7.5-hour working day,
|
||||
roughly an hour a run, which fits these times.
|
||||
|
||||
## Stamper prep: the Sibert VS line
|
||||
|
||||
@@ -222,7 +338,9 @@ What this changes in the plan:
|
||||
2026) that a budget of USD 250k covers "all 3 auto-machines"; Ian
|
||||
Locke's own time, spare parts, shipping and travel come on top. This is a
|
||||
budget confirmation, not a quote: Sibert offers a fully itemised
|
||||
quotation once we go ahead. It sits above the 60k to 170k estimate in
|
||||
quotation once we go ahead. Ian Locke repeated on 9 October 2026 that
|
||||
equipment footprints and formal quotations follow when we are ready, and
|
||||
advised settling the pressing side first. It sits above the 60k to 170k estimate in
|
||||
[total investment](../finance/total-investment.md), which carries the
|
||||
difference in its not-yet-rolled-up table until the next re-base.
|
||||
- **Single-phase power.** All three run on 115 to 230 VAC, 50/60 Hz, ~2.5
|
||||
@@ -340,10 +458,17 @@ goes ahead.
|
||||
works or a regional partner); the roughness the VSF reaches; crated
|
||||
sizes and weights (the VSC is now 1 t); what it installed at Pheenix in
|
||||
January 2025, and whether Pheenix sells Sibert machines with its line.
|
||||
- **OMS (Optical Media Services)**: equipment range and datasheets, a
|
||||
budget for one line next to Pheenix and Digital Matrix, installations and
|
||||
service in Asia, stamper service prices and turnaround, and whether it
|
||||
builds the electroplating equipment Newbilt announces.
|
||||
- **OMS (Optical Media Services)**: a dedicated offer once we send our
|
||||
plans (lacquer, DMM or both; parts per day; shifts), ideally after seeing
|
||||
the equipment in Baarlo (the February 2027 Europe trip could fit);
|
||||
datasheets for the EFS2-200 and AEFS4-250 (dimensions, empty and filled
|
||||
weights, power, cooling water); how parts are passivated in the basic set
|
||||
without the cleaning/passivation unit; the advanced total (the units add
|
||||
up to EUR 314,000, the letter says 311,000); whether passive cooling holds
|
||||
at Thai ambient; the AEFS4-250's PLC protocol and tag list; the used
|
||||
equipment on offer; installations and service in Asia; stamper service
|
||||
prices and turnaround; which water-treatment partner his customers use;
|
||||
and whether OMS builds the electroplating equipment Newbilt announces.
|
||||
- **Press vendors** (Newbilt, Pheenix, M-Tech): the stamper centre hole and
|
||||
edge form each mould expects, so the punch size and coiner tooling can be
|
||||
ordered to match ([pressing line](pressing-line.md)).
|
||||
@@ -362,6 +487,12 @@ goes ahead.
|
||||
Medstead, Hampshire, UK, by the email signature (the specification
|
||||
sheets still carry the older Alton address); sales@sibert.co.uk,
|
||||
ian.locke@sibert.co.uk.
|
||||
- [`oms/`](oms/): OMS's introduction letter of 9 October 2026 (Word;
|
||||
sent as "Introduction letter BUILDFOR.LIFE.docx", attached to Lou
|
||||
Wullms' email of the same day): wet-room units with reference prices,
|
||||
two configurations, capacities, utilities, staffing, used equipment and
|
||||
lathe contacts. Optical Media Services B.V., Tangweg 16, Baarlo,
|
||||
Netherlands.
|
||||
- [`sibert/sps-optical-disc-2009/`](sibert/sps-optical-disc-2009/): SPS
|
||||
punching and finishing literature (2008 to 2009), the punch-and-die
|
||||
return form, and the Blu-ray stamper characteristics paper (2008).
|
||||