Utilities: build the backbone once, add modules with the presses; four-module boiler hall and chiller compound
Deploy test site / deploy (push) Successful in 57s
Deploy test site / deploy (push) Successful in 57s
Phased build list for steam, cooling and hydraulics (launch, Duplex 1, Duplex 2, Classic, options): everything cheap to oversize and costly to retrofit (rooms, pads, headers and ring mains with a valved branch per press position, tanks, HX frame, feeders, one sequencer) is built for the five-press fleet at launch; boilers, chillers and hydraulic pump sets come in identical modules as presses arrive. The Single 2.1 aggregate is proposed as the first central pump set; per-branch isolation and filters. Rooms sized for four modules each (user decision, estimates until vendor footprints): boiler hall ~18 x 9 m for four 500 kg/h positions (fired case, AIX DZL0.5 body), open screened chiller compound ~12.5 x 10.8 m with four pads (250 kW at 40 C ~ Carrier 30RB 080-090), ~40 m2 pump and HX room; the cooling tower pad of the water-cooled concept is dropped. Yard 178 -> ~379 m2. Four boilers carry ~8 presses with N+1; four 250 kW chillers carry the five presses with CH-4 as reserve and no growth position unless the pads take the ~350 kW frame (RFQ option). - scale.md: yard table and basis, utility phasing section - pressing-line.md: hydraulics phasing and re-quote questions - steam-cooling.html: B-4 position, phasing and rooms card, details, RFQ questions (pw_sc_check clean) - construction RFQ: yard table, sealed area 6,549 m2 (68 %) - total-investment: added-scope row +73k to +122k USD (building rate on the ~200 m2 the yard grows by) - Payap parts model: yard rebuilt from Params (blr_n, blr_inst, ch_*, bh_*, cy_*, pr_*), renders updated
This commit is contained in:
1 parent
7688d03be6
commit
e49abf89d3
8 files changed
+163
-29
No files matched your search
@@ -51,6 +51,20 @@ automated candidate). What it means:
|
||||
trench along the press rows. Open for the re-quote (below): whether the
|
||||
Single 2.1's own aggregate becomes part of the central plant or a
|
||||
standby, and whether the Classic can run from it.
|
||||
|
||||
Built to grow from one press (October 2026): the plant room is built at
|
||||
full size, and the hydraulic and air ring mains are sized for the whole
|
||||
fleet from the start, with a valved, capped tee at every press position,
|
||||
the empty ones included, so a new press is connected without stopping
|
||||
the others. The proposal for the Single 2.1's own aggregate, already
|
||||
sized for the second press, is to set it in the plant room as the first
|
||||
pump set on the ring main instead of beside the press; system 2 and the
|
||||
Classic add pump sets in parallel on one manifold with the accumulators,
|
||||
and a standby set follows. Each branch gets its own isolation valves and
|
||||
filter: with one shared oil system, a contamination event otherwise
|
||||
reaches every press. Steam and cooling follow the same pattern; the
|
||||
phased list for all three is in
|
||||
[scale](../scale.md#utility-phasing-backbone-once-modules-with-the-presses).
|
||||
- **Cell layout (October 2026).** Each Duplex system is one operator's
|
||||
cell, as sketched in [duplex-cell-layout-sketch.png](duplex-cell-layout-sketch.png)
|
||||
(arrangement only, not to scale):
|
||||
@@ -84,7 +98,10 @@ automated candidate). What it means:
|
||||
of cooling with extruders and hydraulics, against the ~400 kg/h steam
|
||||
generator and ~250 kW cooling system that the 2024 quote's exclusions
|
||||
describe for one Duplex. The proposal is a bank of two 500 kg/h boilers
|
||||
and three 250 kW chillers, one module per press stage; the layout, the
|
||||
and three 250 kW chillers, one module per press stage, in a boiler hall
|
||||
and a chiller compound built for four modules each
|
||||
([scale](../scale.md#detached-utility-yard-parking-and-what-that-moves));
|
||||
the layout, the
|
||||
operating cases and the open RFQ questions are in
|
||||
[steam and cooling](../steam-cooling.html), the electrical consequences in
|
||||
[scale](../scale.md) and the costs in the
|
||||
@@ -100,7 +117,10 @@ automated candidate). What it means:
|
||||
Classic's price, weight, power, steam and cooling figures; and the
|
||||
central hydraulic supply (an option the flyer offers) for the whole
|
||||
fleet, extendable to ten more Classics, including whether the Classic
|
||||
can run from it.
|
||||
can run from it, whether the presses hold their pressure from it over
|
||||
the ring-main lengths of the hall, the filtration and isolation each
|
||||
branch needs, and whether the Single 2.1's aggregate can be its first
|
||||
pump set.
|
||||
|
||||
The Pheenix AD12 leaves the plan; it stays in the
|
||||
[vendor landscape](../suppliers/vendor-landscape.md) as the comparison if
|
||||
|
||||
Reference in new issue