ERPNext runs the whole plant; every tool we build integrates with it
Decided by the user (October 2026): the whole plant runs ERPNext, and all tooling we develop has to interact with it. digital-factory.md: standing decision in the summary; decision 10 (ERPNext owns the business documents, the factory application owns the floor; ERPNext names are the shared keys); new section 'ERPNext: the plant's ERP' with the ownership table (customers, prices, sales orders, items and BOMs, work orders and job cards per station, batches and quality inspections per compound lot, serial numbers for metal parts, downtime entries, delivery notes, assets, accounting, payroll vs. cycles, per-record inspection, genealogy and the hash-chained log staying in the factory application), the integration rules (one typed Frappe REST client in cnx-factory, an integration user per tool, webhooks in, transactional outbox with idempotent postings so the floor never waits on the ERP, business-sized postings, customisation as a Frappe app in Gitea, nightly reconciliation, no public ERPNext endpoint, new tools use the same client), hosting on NixOS (no nixpkgs module, NixOS/nixpkgs #241921; Avunu frappe-nix as the start, frappe_docker as oci-containers fallback; MariaDB + Redis; vinyl-erp on site behind the gateway proxy; OIDC sign-on; upgrades on a restored copy), Thai localisation (Ecosoft erpnext_thailand: VAT, WHT, PND, billing notes; Ecosoft as partner to quote; payroll and BOI reporting to check), phasing (dev ERPNext now; accounting and assets from the first capex invoice; manufacturing at commissioning) and estimates. ERPNext added to the architecture diagram, services, machines (vinyl-erp), module list, backup, cost, build order and open decisions; the old 'ERP out of scope, decide after launch' line replaced. artist-platform.md: price list, customers, sales orders, campaign pledges as payment entries, through the plant's outbox. traceability.md: one ERP, one set of keys. README summary. total-investment.md added scope: ERPNext (to quote, not in the sum, no licence fee).
This commit is contained in:
1 parent
655d5705c4
commit
e12ad2ed7b
5 files changed
+201
-11
No files matched your search
@@ -149,8 +149,9 @@ The detail lives in dedicated documents:
|
||||
shipment, and the requirements this sets for the factory software
|
||||
- [Digital factory systems plan](docs/digital-factory.md): every system
|
||||
that has to exist for environment, machine, QC and genealogy data to land
|
||||
in one database keyed to one record identity: the plant as one more site
|
||||
in B4L's existing NixOS fleet (the cnx-network clan: mesh, DNS, fleet
|
||||
in one database keyed to one record identity, with ERPNext as the
|
||||
plant's ERP that every tool we build integrates with: the plant as one
|
||||
more site in B4L's existing NixOS fleet (the cnx-network clan: mesh, DNS, fleet
|
||||
monitoring, site gateway module, public proxy), what changes in that
|
||||
repo, VLAN zoning, Telegraf/MQTT acquisition source by source, QC
|
||||
instrument integration, the factory application, alerting, backup,
|
||||
|
||||
Reference in new issue
Block a user