Press hall laid out 60/40 for Duplex systems (special pressings first)
Deploy test site / deploy (push) Successful in 46s
Deploy test site / deploy (push) Successful in 46s
User (October 2026): "the factory should have more space for duplex setups than classic, we will mainly focus on special prints and not mono colours plan it to be 60/40 duplex classic". - Press hall (~870 m2) planned 60/40 by floor: four Duplex bays along the visitor corridor and six Classic positions in the second row (440 + 300 = ~740 m2 at 110 / 50 m2), the rest open for mould carts and staging; the launch plant fills one of each, growth adds Duplex systems first. Replaces "room for ten more Classics". - Full hall: 8 semi-automatic presses + 6 Classics, 57/43 by press count, ~1,250 to 1,410 records/h gross, ~3.6 to 4.7M a year on the scale.md basis (was 4.7 to 5.8M for 2 Duplex + 11 Classics); ~2.1 to 2.5 t/h steam and up to ~1.8 MW cooling, still a utility phase of its own. By hourly output the six automatic Classics still press more than the eight semi-automatic presses (estimate). - pressing-line.md, scale.md (capacity table, utilities), site-candidates .md, crane-workshop-tours.md, roadmap.md, README (the FreeCAD Payap model still draws the earlier layout; noted, not redrawn). - Calculator: preset "Full hall 60/40 (4 D + 6 C)", fleet ladder Duplex first (1+1, 2+1, 3+2, 4+3, 4+6) plus the same floor Classic-led (2+11) and Duplex-only (7+0) for comparison; plant view reserves 4 Duplex bays and 6 Classic positions. - Business plan draft 0.2 rebuilt (capacity table row, plot fit, layout). Checks: renderer 720 checks pass (node budget 2,700 for the Duplex-heavy stress preset, 60 fps), calculator regression 0 fails, level selector and page checks clean at 390 / 1024 / 1440 px dark and light; PDF 47 pages with a filled table of contents.
This commit is contained in:
1 parent
4beda7f27a
commit
d8b2c1e2db
11 files changed
+71
-40
No files matched your search
@@ -321,8 +321,8 @@ into a separate office building, so only production sits under the
|
||||
crane. The tour then starts in the office building, at the cutting-room
|
||||
window and the listening room, and crosses a covered link into a 98 m
|
||||
corridor. That is longer than the 45 to 55 m assumed below, because the
|
||||
press hall keeps room for ten more Classics and a colour store sits
|
||||
before it. In that model the crane runway ends at the press hall:
|
||||
press hall keeps room for four Duplex systems and six Classics and a
|
||||
colour store sits before it. In that model the crane runway ends at the press hall:
|
||||
finishing and packaging sit beyond it in a two-storey block with the
|
||||
print room and stocks upstairs, which the crane cannot serve, so loads
|
||||
there move by forklift and goods lift. The model also draws the
|
||||
|
||||
Reference in new issue