Press hall laid out 60/40 for Duplex systems (special pressings first)
Deploy test site / deploy (push) Successful in 46s
Deploy test site / deploy (push) Successful in 46s
User (October 2026): "the factory should have more space for duplex setups than classic, we will mainly focus on special prints and not mono colours plan it to be 60/40 duplex classic". - Press hall (~870 m2) planned 60/40 by floor: four Duplex bays along the visitor corridor and six Classic positions in the second row (440 + 300 = ~740 m2 at 110 / 50 m2), the rest open for mould carts and staging; the launch plant fills one of each, growth adds Duplex systems first. Replaces "room for ten more Classics". - Full hall: 8 semi-automatic presses + 6 Classics, 57/43 by press count, ~1,250 to 1,410 records/h gross, ~3.6 to 4.7M a year on the scale.md basis (was 4.7 to 5.8M for 2 Duplex + 11 Classics); ~2.1 to 2.5 t/h steam and up to ~1.8 MW cooling, still a utility phase of its own. By hourly output the six automatic Classics still press more than the eight semi-automatic presses (estimate). - pressing-line.md, scale.md (capacity table, utilities), site-candidates .md, crane-workshop-tours.md, roadmap.md, README (the FreeCAD Payap model still draws the earlier layout; noted, not redrawn). - Calculator: preset "Full hall 60/40 (4 D + 6 C)", fleet ladder Duplex first (1+1, 2+1, 3+2, 4+3, 4+6) plus the same floor Classic-led (2+11) and Duplex-only (7+0) for comparison; plant view reserves 4 Duplex bays and 6 Classic positions. - Business plan draft 0.2 rebuilt (capacity table row, plot fit, layout). Checks: renderer 720 checks pass (node budget 2,700 for the Duplex-heavy stress preset, 60 fps), calculator regression 0 fails, level selector and page checks clean at 390 / 1024 / 1440 px dark and light; PDF 47 pages with a filled table of contents.
This commit is contained in:
1 parent
4beda7f27a
commit
d8b2c1e2db
11 files changed
+71
-40
No files matched your search
@@ -548,8 +548,8 @@ def blocks():
|
||||
"~0.71 to 0.97 million records"],
|
||||
["Growth option: second Duplex", "4 semi-automatic + 1 Classic, 2 shifts; room reserved, not in "
|
||||
"the investment", "~1.0 to 1.5 million records"],
|
||||
["Expansion option", "The five-press fleet plus up to ten more Classics; a utility phase of its "
|
||||
"own", "~4.7 to 5.8 million records (estimate)"],
|
||||
["Full hall (option)", "4 Duplex systems + 6 Classics, the press hall laid out 60/40 for Duplex "
|
||||
"(special pressings first); a utility phase of its own", "~3.6 to 4.7 million records (estimate)"],
|
||||
], widths_mm=[40, 80, 50],
|
||||
caption="Basis: semi-automatic 60 to 80 records/h assumed; Classic ~128/h (vendor flyer); 16 h/day, "
|
||||
"300 days/yr, 60 to 70% overall equipment effectiveness. The launch plant is 248 to 288 "
|
||||
|
||||
@@ -487,7 +487,7 @@ def blocks():
|
||||
"**Flooding:** Payap describes the land as low-lying when bought; check the plot against the "
|
||||
"2024 flood extents.",
|
||||
"**Plot fit:** the building, the detached utility yard and a second building need 6 to 8 rai; "
|
||||
"the Payap scenario model draws a 150 m square (14.1 rai) with room for ten more Classics.",
|
||||
"the Payap scenario model draws a 150 m square (14.1 rai) with room for the full press hall.",
|
||||
"**Galvanics on a campus:** the lessor's written consent; zero discharge becomes a lease "
|
||||
"condition, not only a commitment.",
|
||||
]),
|
||||
@@ -628,7 +628,8 @@ def blocks():
|
||||
"It is where finished goods move to free production floor, where pressing capacity can double, "
|
||||
"or where a CD replication line would go if that option is chosen (section 4.9). Where the "
|
||||
"second Duplex system stands on the Mueang Chi footprint is not drawn yet; the Payap scenario "
|
||||
"model draws the whole five-press fleet with room for ten more Classics."),
|
||||
"model draws the five-press fleet; its press hall is now planned 60/40 for Duplex systems (four "
|
||||
"Duplex bays and six Classic positions), because the plant focuses on special pressings."),
|
||||
H3("What the construction RFQ asks"),
|
||||
P("The budget-level construction RFQ, with quantities from the parametric model, asks contractors "
|
||||
"for: the shell rate per m² at the insulated-panel specification (not a bare shed); heavy-duty "
|
||||
|
||||
Reference in new issue