Steam and cooling, plant operation: show the launch plant (1 Duplex + 1 Classic)
Deploy test site / deploy (push) Successful in 43s

User (October 2026): "launch plant should be 1x duplex system and 1x
classic". The calculator already did; these two pages did not.

- steam-cooling.html: default case is now "Launch plant" (D1-A, D1-B,
  Classic; B-1 and B-2; CH-1 and CH-2: 450 to 540 kg/h on 1,000 kg/h,
  391.5 kW on 500 kW). Other cases: Duplex first (commissioning), Second
  Duplex (growth option, five presses), One module down (launch plant
  with B-2 and CH-2 out). Idle boxes say "reserved position" / "growth
  option". Phasing table: launch plant, second Duplex, options;
  galvanics cooling is launch scope. Five-press figures labelled as the
  growth case or backbone sizing; chiller cost per the CSV 2-module row.
- plant-operation.html: the launch plant: Classic C2 removed everywhere
  (press, trimmer, routes, conveyor, lamps, texts), Classic re-centred;
  one PDPU (2 cells) as in total-investment; boilers 2 x 500 kg/h,
  chillers 2 x 250 kW; title arrivals scaled to three presses; phone
  legend in one column.
- Landing entries and README bullets for both pages.

Verified headless (Edge): skill checks pw_sc_check and pw_plant_check
with launch-plant expectations, 90-day runs, perf unchanged; 390 / 1024
/ 1440 px dark and light without page errors or overflow.
This commit is contained in:
grabowski committed 2026-10-16 16:58:37 +07:00
1 parent 71e30b0633
commit d7380919e4
4 files changed
+139 -125

No files matched your search

+10 -8
View File
@@ -72,9 +72,9 @@ document.documentElement.setAttribute("data-theme",t);})();
<li>
<a href="demos/plant-operation/">
<strong>Plant overview (simulated SCADA)</strong>
<span>The mature plant animated at real cycle times: Newbilt Duplex
and Classic presses, Pheenix Alpha electroforming and Sibert stamper
prep, from PVC intake and the material lab through pressing,
<span>The launch plant animated at real cycle times: one Newbilt
Duplex system and one Classic press, Pheenix Alpha electroforming and
Sibert stamper prep, from PVC intake and the material lab through pressing,
inspection, packaging and fulfillment, with the artist gates,
utilities and energy alongside. Real time up to a day in 24 s;
every station is clickable; on a phone, turn it sideways and pinch
@@ -97,11 +97,13 @@ document.documentElement.setAttribute("data-theme",t);})();
<li>
<a href="demos/steam-cooling/">
<strong>Steam and cooling plant</strong>
<span>The utilities for the five-press fleet as a clickable process
diagram: boiler bank, steam header and condensate return, chiller
bank, plate heat exchanger and a branch to every press. Switch
between the launch press, the full fleet and one module down to see
demand against installed capacity.</span>
<span>The utilities for the launch plant (one Duplex system and one
Classic on two boiler and two chiller modules, rooms built for four)
as a clickable process diagram: boiler bank, steam header and
condensate return, chiller bank, plate heat exchanger and a branch to
every press position. Switch between the launch plant, the Duplex
commissioned first, the second Duplex growth option and one module
down to see demand against installed capacity.</span>