Steam and cooling, plant operation: show the launch plant (1 Duplex + 1 Classic)
Deploy test site / deploy (push) Successful in 43s
Deploy test site / deploy (push) Successful in 43s
User (October 2026): "launch plant should be 1x duplex system and 1x classic". The calculator already did; these two pages did not. - steam-cooling.html: default case is now "Launch plant" (D1-A, D1-B, Classic; B-1 and B-2; CH-1 and CH-2: 450 to 540 kg/h on 1,000 kg/h, 391.5 kW on 500 kW). Other cases: Duplex first (commissioning), Second Duplex (growth option, five presses), One module down (launch plant with B-2 and CH-2 out). Idle boxes say "reserved position" / "growth option". Phasing table: launch plant, second Duplex, options; galvanics cooling is launch scope. Five-press figures labelled as the growth case or backbone sizing; chiller cost per the CSV 2-module row. - plant-operation.html: the launch plant: Classic C2 removed everywhere (press, trimmer, routes, conveyor, lamps, texts), Classic re-centred; one PDPU (2 cells) as in total-investment; boilers 2 x 500 kg/h, chillers 2 x 250 kW; title arrivals scaled to three presses; phone legend in one column. - Landing entries and README bullets for both pages. Verified headless (Edge): skill checks pw_sc_check and pw_plant_check with launch-plant expectations, 90-day runs, perf unchanged; 390 / 1024 / 1440 px dark and light without page errors or overflow.
This commit is contained in:
1 parent
71e30b0633
commit
d7380919e4
4 files changed
+139
-125
No files matched your search
+10
-8
@@ -72,9 +72,9 @@ document.documentElement.setAttribute("data-theme",t);})();
|
||||
<li>
|
||||
<a href="demos/plant-operation/">
|
||||
<strong>Plant overview (simulated SCADA)</strong>
|
||||
<span>The mature plant animated at real cycle times: Newbilt Duplex
|
||||
and Classic presses, Pheenix Alpha electroforming and Sibert stamper
|
||||
prep, from PVC intake and the material lab through pressing,
|
||||
<span>The launch plant animated at real cycle times: one Newbilt
|
||||
Duplex system and one Classic press, Pheenix Alpha electroforming and
|
||||
Sibert stamper prep, from PVC intake and the material lab through pressing,
|
||||
inspection, packaging and fulfillment, with the artist gates,
|
||||
utilities and energy alongside. Real time up to a day in 24 s;
|
||||
every station is clickable; on a phone, turn it sideways and pinch
|
||||
@@ -97,11 +97,13 @@ document.documentElement.setAttribute("data-theme",t);})();
|
||||
<li>
|
||||
<a href="demos/steam-cooling/">
|
||||
<strong>Steam and cooling plant</strong>
|
||||
<span>The utilities for the five-press fleet as a clickable process
|
||||
diagram: boiler bank, steam header and condensate return, chiller
|
||||
bank, plate heat exchanger and a branch to every press. Switch
|
||||
between the launch press, the full fleet and one module down to see
|
||||
demand against installed capacity.</span>
|
||||
<span>The utilities for the launch plant (one Duplex system and one
|
||||
Classic on two boiler and two chiller modules, rooms built for four)
|
||||
as a clickable process diagram: boiler bank, steam header and
|
||||
condensate return, chiller bank, plate heat exchanger and a branch to
|
||||
every press position. Switch between the launch plant, the Duplex
|
||||
commissioned first, the second Duplex growth option and one module
|
||||
down to see demand against installed capacity.</span>
|
||||