Add loading dock, second gate, and phase 1 construction RFQ

Site model: two sealed dock positions on the north gable (depressed
12 m pit + 12 m ramp cut into ground and paving), water treatment
moved clear of the cooling tower, second car/staff gate on the NE
edge with access road to parking, guard house relocated between the
gates, perimeter wall rebuilt continuous on its 0.4 m inset line,
leftover door recesses filled on both envelopes, loading-apron
marking removed. Renders re-exported.

Docs: phase 1 contractor pricing request (PEB spec, PIR envelope,
dock, site works, exclusions, soil caveats).
This commit is contained in:
grabowski committed 2026-07-30 18:11:30 +07:00
1 parent ed987b4375
commit bbeaed7e87
8 files changed
+97

No files matched your search

Binary file not shown.

Before

Width:  |  Height:  |  Size: 168 KiB

After

Width:  |  Height:  |  Size: 151 KiB

Binary file not shown.

Before

Width:  |  Height:  |  Size: 199 KiB

After

Width:  |  Height:  |  Size: 191 KiB

Binary file not shown.

Before

Width:  |  Height:  |  Size: 163 KiB

After

Width:  |  Height:  |  Size: 152 KiB

Binary file not shown.

Before

Width:  |  Height:  |  Size: 161 KiB

After

Width:  |  Height:  |  Size: 148 KiB

Binary file not shown.

Before

Width:  |  Height:  |  Size: 210 KiB

After

Width:  |  Height:  |  Size: 187 KiB

Binary file not shown.

Before

Width:  |  Height:  |  Size: 404 KiB

After

Width:  |  Height:  |  Size: 375 KiB