Add loading dock, second gate, and phase 1 construction RFQ
Site model: two sealed dock positions on the north gable (depressed 12 m pit + 12 m ramp cut into ground and paving), water treatment moved clear of the cooling tower, second car/staff gate on the NE edge with access road to parking, guard house relocated between the gates, perimeter wall rebuilt continuous on its 0.4 m inset line, leftover door recesses filled on both envelopes, loading-apron marking removed. Renders re-exported. Docs: phase 1 contractor pricing request (PEB spec, PIR envelope, dock, site works, exclusions, soil caveats).