Add BOI investment promotion strategy
Group B base activity (plastics) with non-tax package and machinery duty exemption; CIT value engineered via solar/BESS, smart-and-sustainable automation, and R&D merit measures; NEC/Lamphun regional angle; BOI approval sequenced ahead of incorporation and machinery orders
This commit is contained in:
1 parent
11b7df3be4
commit
b2ab630231
2 files changed
+119
No files matched your search
+114
@@ -0,0 +1,114 @@
|
||||
# BOI Investment Promotion
|
||||
|
||||
The project will apply for promotion by the Thailand Board of Investment.
|
||||
Research snapshot from July 2026, based on the BOI Investment Promotion
|
||||
Guide 2025/2026 and advisory sources; BOI revises its measures roughly
|
||||
annually, so every scheme cited here must be reconfirmed at filing time.
|
||||
The exact activity sub-code needs confirmation by a BOI-registered
|
||||
consultant before the application.
|
||||
|
||||
## The strategic picture
|
||||
|
||||
Vinyl pressing is, in BOI terms, basic plastic consumer-goods manufacturing
|
||||
(Category 6, chemicals/paper/plastics), which lands in **incentive Group B**:
|
||||
no corporate income tax holiday on the core pressing activity, but the full
|
||||
non-tax package and machinery duty exemption. The tax value is engineered on
|
||||
top through the upgrade measures, where this project happens to be strong:
|
||||
|
||||
- **Solar and battery**: the alternative-energy measure (Announcement
|
||||
2/2568, April 2025, under the Smart and Sustainable Industry framework)
|
||||
grants CIT exemption based on the solar investment. Eligible spend
|
||||
explicitly includes PV modules, inverters, BESS and BESS inverters, and
|
||||
mounting structures, capped at THB 12M/30M/40M of investment value per MW
|
||||
depending on investment type. The planned Deye + Gobel installation
|
||||
converts directly into CIT-exemption headroom.
|
||||
- **Automation and metrology**: the Smart and Sustainable Industry upgrade
|
||||
measure (Announcement 15/2565, refreshed July 2025) rewards automation,
|
||||
smart machinery, and energy efficiency, typically 3 years of CIT
|
||||
exemption capped around 50% of the qualifying upgrade investment. The
|
||||
automated presses, inline optical inspection, and stamper metrology are
|
||||
the natural fit.
|
||||
- **R&D merit**: investing at least 1% of revenue in Thai R&D adds 1 to 3
|
||||
CIT-exemption years and can lift the exemption cap. In-house mastering,
|
||||
galvanics process development, and recycled-PVC work could be framed as
|
||||
qualifying development.
|
||||
|
||||
So the application is pitched on solar, automation, and technology content,
|
||||
not on "we press plastic discs."
|
||||
|
||||
## What Group B still delivers (the core value)
|
||||
|
||||
- **Machinery import duty exemption**: significant with the entire equipment
|
||||
list imported (Germany, Sweden, USA, Japan)
|
||||
- **100% foreign ownership** of the promoted manufacturing company,
|
||||
overriding Foreign Business Act restrictions for the promoted activity
|
||||
- **Land ownership** for the promoted operation despite foreign
|
||||
shareholding, plus a small allowance for office/residential use; note the
|
||||
privilege is tied to the promotion, which matters for the buy-vs-lease
|
||||
decision
|
||||
- **Visas and work permits** via the One Stop Service, without the usual
|
||||
four-Thai-employees-per-permit rule; relevant for foreign commissioning
|
||||
engineers and the technical consultant
|
||||
- **Raw material duty relief**: exemption for export production (1 to 5
|
||||
years, renewable) and up to 90% reduction for domestic-sale production
|
||||
|
||||
## Requirements
|
||||
|
||||
- Minimum investment THB 1,000,000 excluding land and working capital
|
||||
(comfortably cleared by the first pressing line alone)
|
||||
- Debt-to-equity ratio no higher than 3:1, maintained for the life of the
|
||||
privileges; plan the equity/loan mix for the machinery and solar capex
|
||||
accordingly
|
||||
- Modern machinery and process expected; ISO/environmental compliance for
|
||||
larger projects
|
||||
- BOI promotion does not replace the factory license (Ror.Ngor. 4),
|
||||
hazardous substance registration, or wastewater permitting; the galvanics
|
||||
effluent is the most likely regulatory friction point regardless of BOI
|
||||
status
|
||||
|
||||
## Regional angle: Northern Thailand
|
||||
|
||||
Chiang Mai, Lamphun, and Lampang sit in the **Northern Economic Corridor**,
|
||||
which BOI promotes as a creative-economy base; a vinyl/music manufacturing
|
||||
story fits that narrative. Locating in the **Northern Region Industrial
|
||||
Estate in Lamphun** simplifies factory licensing and land questions and
|
||||
provides shared central effluent treatment, which helps the galvanics
|
||||
permitting. Legacy "Zone 3" incentive tables still found online are
|
||||
outdated; the current area-based add-ons for Lamphun/Lampang must be
|
||||
confirmed with BOI directly.
|
||||
|
||||
## Process and timeline
|
||||
|
||||
1. File via the BOI e-Investment system, then present the project at an
|
||||
analyst meeting
|
||||
2. Decision: about 40 working days for projects under THB 200M (60 to 90
|
||||
working days for larger tiers); roughly 4 to 6 months end to end to the
|
||||
promotion certificate in practice
|
||||
3. Incorporate the company (if not yet done) and accept the certificate
|
||||
4. Import machinery within the duty-exemption window, commonly 30 months
|
||||
from certificate issuance (extendable); the Newbilt/Pheenix delivery
|
||||
schedule must fit inside it
|
||||
5. Reach full operation by the certificate deadline (typically about 36
|
||||
months), with progress reporting, annual reports, machinery lists, and
|
||||
the 3:1 debt-to-equity ratio maintained throughout
|
||||
|
||||
## Sequencing consequence
|
||||
|
||||
BOI approval comes **before** company incorporation is finalized and before
|
||||
any machinery purchase orders: duty exemption does not apply retroactively
|
||||
to equipment already imported, and the certificate defines the import
|
||||
window. The BOI application is therefore a dependency at the top of the
|
||||
project timeline, ahead of equipment contracts.
|
||||
|
||||
## Open items
|
||||
|
||||
- Confirm the exact activity sub-code and tier for vinyl/PVC consumer-goods
|
||||
pressing (Group B assumption is well supported but not code-verified)
|
||||
- Confirm the live versions and per-MW caps of the solar and
|
||||
smart-and-sustainable measures at filing time
|
||||
- Confirm current NEC/Lamphun area add-ons
|
||||
- Engage a BOI-registered consultant to structure the application so the
|
||||
solar, automation, and R&D measures stack on the base promotion
|
||||
- Keep any future label/content/retail arm in a separate entity: media and
|
||||
service activities carry different (and sometimes Thai-ownership)
|
||||
conditions, and mixing them muddies a clean manufacturing application
|
||||