Plant view: inline optical QC station at every press
Deploy test site / deploy (push) Successful in 58s
Deploy test site / deploy (push) Successful in 58s
User, 18 Oct 2026: add the new inline inspection machine to the factory. - Fleet calculator, isometric plant view: qcStation() draws the concept station (1.9 x 0.65 x 1.5 m: aluminium conveyor table with the two rim belts, light-tight tunnel, stack light, record on the infeed, reject bin) in front of the operator in every Duplex cell (after the trimmer) and at the unload side of every Classic, in the hall and in phase 2; own ids qc-duplex-n / qc-classic-n with tooltips from inline-optical-qc.md (Classic hand-off open with Newbilt). Cell floor extended to take the bin. - The finishing block's end-of-line optical station becomes the release inspection: the same station measuring cooled samples (records settle ~24 h); corridor, block and conveyor tooltips reworded. - Machine park schematic: a QC bar in every Duplex cell and Classic, an "inline QC" legend entry; the legend moved to the bottom of the hall box (it collided with the hall heading). - Docs: inline-optical-qc.md (release station location, plant view), site-candidates.md block ground floor, crane-workshop-tours.md tour stop 6. Checks: node --check on all scripts; pw_bp_calc.py 0 fails; pw_iso_view_check.py OK; every data-id has info at all presets, levels and rotations; legend clear of cells and heading up to 30M records; zoomed shots in both themes and two rotations. GF node count at the full preset 2,523 (was 2,388), 8M records ~2,980; rebuild under 60 ms.
This commit is contained in:
1 parent
705690eb99
commit
9ffcfe62f1
4 files changed
+63
-23
No files matched your search
@@ -305,7 +305,12 @@ By group, per station:
|
||||
([Stamper Discs](https://stamperdiscs.com/horns-and-quality-issues-in-vinyl-record-pressing)).
|
||||
The warp reading at the press is therefore an early warning. Release on
|
||||
warp uses sampled cooled records, measured on a second station of the
|
||||
same design in the QC lab.
|
||||
same design next to the QC lab in the finishing block (the room the
|
||||
layout had for end-of-line optical inspection).
|
||||
- **Plant view.** The [plant and business plan calculator](../fleet-calculator.html)
|
||||
draws a station in front of the operator in every Duplex cell, one at
|
||||
the unload side of every Classic, and the release station in the
|
||||
finishing block; the machine park schematic shows them too.
|
||||
|
||||
## Two software routes
|
||||
|
||||
|
||||
Reference in new issue
Block a user