Plant view: inline optical QC station at every press
Deploy test site / deploy (push) Successful in 58s

User, 18 Oct 2026: add the new inline inspection machine to the factory.

- Fleet calculator, isometric plant view: qcStation() draws the concept
  station (1.9 x 0.65 x 1.5 m: aluminium conveyor table with the two rim
  belts, light-tight tunnel, stack light, record on the infeed, reject
  bin) in front of the operator in every Duplex cell (after the trimmer)
  and at the unload side of every Classic, in the hall and in phase 2;
  own ids qc-duplex-n / qc-classic-n with tooltips from
  inline-optical-qc.md (Classic hand-off open with Newbilt). Cell floor
  extended to take the bin.
- The finishing block's end-of-line optical station becomes the release
  inspection: the same station measuring cooled samples (records settle
  ~24 h); corridor, block and conveyor tooltips reworded.
- Machine park schematic: a QC bar in every Duplex cell and Classic, an
  "inline QC" legend entry; the legend moved to the bottom of the hall
  box (it collided with the hall heading).
- Docs: inline-optical-qc.md (release station location, plant view),
  site-candidates.md block ground floor, crane-workshop-tours.md tour
  stop 6.

Checks: node --check on all scripts; pw_bp_calc.py 0 fails;
pw_iso_view_check.py OK; every data-id has info at all presets, levels
and rotations; legend clear of cells and heading up to 30M records;
zoomed shots in both themes and two rotations. GF node count at the full
preset 2,523 (was 2,388), 8M records ~2,980; rebuild under 60 ms.
This commit is contained in:
grabowski committed 2026-10-18 14:56:08 +07:00
1 parent 705690eb99
commit 9ffcfe62f1
4 files changed
+63 -23

No files matched your search

+3 -1
View File
@@ -290,7 +290,9 @@ to run along the corridor:
3. Stamper prep
4. Material lab and PVC handling
5. **Press hall**, the long glazed stretch and the centre of the tour
6. 100% optical inspection (the presses trim inline)
6. Release inspection of cooled samples (every record is already
checked by the optical QC station at its press, and the presses trim
inline)
7. QC and listening, with a headphone listening point
8. Finishing and packaging, where the records leave production