Solar (user, 17 Oct 2026: "use as much roof space as possible") - PV on every roof and canopy: ~640 kWp on the Payap scenario plot (factory roof ~523, canopies ~54, flat office roof ~65 kWp around the AC units); ~300 kWp on the Mueang Chi hall. Calculator: pvKWp 640, new pvSelf 85 % (zero export, hourly sketch), PV cost per kWp times the array, office-roof PV in the iso view, roofs drawn full. - 12.8M to 16.6M THB at 20 to 26 THB/W; CSV baseline 34.37M to 56.34M; launch plant ~168M / 231M / 294M THB with contingency; Plan B ~216M (label ~215M), ~39M above Plan A; Plan A unchanged (it leases the array), its solar lever ~17.5M. PV payback ~4.2 to 5.9 years. - Permits (rooftop solar no factory licence since 28 Dec 2024, ERC exemption under 1,000 kVA, PEA zero export) and PPA discounts sourced in sustainability.md. BOI correction - Announcement 3/2568 (in force 1 July 2025) ended BOI promotion for solar installations; only the battery may qualify (12M THB per MW cap). Removed the "BOI solar measure" from boi.md, total-investment, revenue-model, sustainability, site-candidates and both plan versions; Plan B's case for owning the array is the PPA bill it avoids (~0.07M USD a year). Open source (user, 17 Oct 2026) - digital-factory.md "Open source throughout, and working with other plants": everything we run and build is open source on NixOS, our code published (licence to decide), vendor firmware the stated exception; later the stack and factory-automation services for other pressing plants, not in the revenue. - Business plan section 5.6 plus an executive-summary bullet, reading guide and not-modelled mentions; draft 0.3 rebuilt (A 60, B 61 pages), renders re-made with the roofs full.
This commit is contained in:
1 parent
ab303618d8
commit
9ff5feef11
32 files changed
+693
-367
No files matched your search
+9
-3
@@ -298,13 +298,19 @@ small against the connection, but its own feeder and meter.
|
||||
roof plane, per the [construction RFQ](finance/phase1-construction-rfq.md)).
|
||||
This supersedes the older rule of thumb of 150 to 200 kWp on a
|
||||
~1,500 m² building, which the massing model has overtaken
|
||||
- **Decided 17 October 2026: every roof and canopy carries PV.** On this
|
||||
hall that is the 247 kWp roof plus the canopies' ~40 to 54 kWp, ~300
|
||||
kWp; on the Payap scenario plot ~640 kWp, the size the investment and
|
||||
the business plan carry
|
||||
([sustainability](sustainability.md#roof-design-for-pv-candidate-mueang-chi-site))
|
||||
- Northern Thailand yield ~1,400 to 1,500 kWh/kWp/yr, so 300 kWp produces
|
||||
roughly **420 to 450 MWh/yr**
|
||||
roughly **420 to 450 MWh/yr** and ~640 kWp ~900 to 960 MWh/yr
|
||||
- Plant consumption at mature two-shift operation: roughly **1,000 to
|
||||
1,500 MWh/yr** without electric steam, up to **~2,500 MWh/yr** with it
|
||||
(estimate), so 300 kWp covers roughly **28 to 45%** of consumption
|
||||
without electric steam, falling to **~17%** with it; a bigger array
|
||||
shifts that up
|
||||
without electric steam, falling to **~17%** with it; ~640 kWp, at
|
||||
~85 % used on site under zero export, covers ~38 % of the launch
|
||||
plant's ~2,000 MWh with electric steam (calculator, estimate)
|
||||
- Battery: **271 kWh** Gobel stack (ride-through, roughly
|
||||
an hour of the chiller bank's peak electrical draw; peak shaving earns
|
||||
little under PEA's time-of-use tariff, see
|
||||
|
||||