The parametric model (docs/cnx_vinyl_parametric.FCStd) is now tracked. It is the spreadsheet-driven Arch/BIM rebuild that supersedes the hard-coded massing in factory_building_rough.FCStd, which is kept because the current renders still come from it. Site works. The two gates are consolidated into a single 10.0 m bi-parting opening, with the wall plugged where the second one stood. The guard house sits beside it clear of the entry corridor, and was raised out of the ground - it had been modelled sunk half a storey. The fire water tank moved to the north-west corner of the plot, taking utility-yard clearance from 5.6 m to 18.6 m; the fire pump house follows it. The site is now paved continuously from the frontage through to phase 2: 4,387 m², split 1,608 heavy-duty and 2,779 general so the two can be priced apart. Phase 1 envelope. The walls stopped flat at 8.2 m while the roof rose to 12.6 m, leaving the entire high-side wall and both gable triangles open - about 366 m². Walls now follow the roof underside exactly. The rebuild also starts the sandwich panel on top of the masonry dado, clearing a 31.9 m³ overlap that had been double-counting 425 m² of envelope. A vehicle ramp (10.5 m at 1:10) and three stair flights are added, since with FFL at +1.2 m the building had no means of access at grade. Phase 2. Built from the design already documented in scale.md: 45 x 38 m, two-bay sawtooth at 10.35/7.0 m with a 3.35 m glazed riser, bays falling ESE. A three-storey office cube - canteen, office, office plus sleeping - stands at the yard end of the west tooth, 1.65 m proud of the ridge. Its walls and the hall walls are Arch Walls, and the yard glazing is Arch Windows, so both carry IFC types and cut their own openings. RFQ updated against the model throughout, with a new section on where mineral-wool core is required instead of PIR, for compartmentation and for acoustics.
This commit is contained in:
1 parent
bbeaed7e87
commit
9d5d695855
3 files changed
+113
-16
No files matched your search
@@ -1,8 +1,8 @@
|
||||
# Phase 1 Construction: Rough Pricing Request
|
||||
|
||||
Spec sheet for asking a contractor for a budget-level price on the phase 1
|
||||
buildings and site works. Quantities come from the massing model
|
||||
(`docs/factory_building_rough.FCStd`) sited on the candidate Mueang Chi
|
||||
buildings and site works. Quantities come from the parametric model
|
||||
(`docs/cnx_vinyl_parametric.FCStd`) sited on the candidate Mueang Chi
|
||||
parcel; everything here is planning-stage, not construction documents. In
|
||||
Thailand this scope is typically quoted as a PEB (pre-engineered steel
|
||||
building) per m² plus civil works, and the sheet is structured that way.
|
||||
@@ -16,12 +16,13 @@ zoning is unverified, so this is a budget number, not a bid.
|
||||
|---|---|
|
||||
| Type | Single-storey steel portal frame (PEB), no mezzanine, no crane |
|
||||
| Footprint | **60 × 25 m = 1,500 m²** |
|
||||
| Roof | Monopitch, **10° pitch**, roof plane ~1,520 m², low eave **7.0 m**, high side **~11.4 m** |
|
||||
| Roof | Monopitch, **10° pitch**, roof plane **1,523 m²**, low eave **7.0 m**, high side **~11.4 m** (both above finished floor) |
|
||||
| Roof load | Carries a rooftop PV array (~425 modules, ~247 kWp): add **~20 kg/m²** dead load plus wind uplift on racking; PV mounts on the purlins |
|
||||
| Envelope | **Insulated sandwich panels, walls and roof, PIR core — EPS core excluded** (fire and insurability), fire-rated class stated (FM-approved or B-s1). **Roof 100 mm PIR** with light-colored top skin, **walls 75 mm PIR**. Masonry/precast dado wall to ~2.5 m with panels above (impact, security, washdown), internally insulated so the envelope stays continuous. Taped/gasketed joints throughout — the building is air-conditioned (20–26 °C, 35–60 % RH) and must be airtight against smoke-season PM2.5. No skylights. Not bare metal sheet with blanket insulation |
|
||||
| Floor | Ground-bearing slab rated **30 kN/m² UDL**, provision for machine plinths, power-floated finish |
|
||||
| Envelope | **Insulated sandwich panels, walls and roof, PIR core — EPS core excluded** (fire and insurability), fire-rated class stated (FM-approved or B-s1,d0). **Roof 100 mm PIR** with light-colored top skin, **walls 75 mm PIR**. Taped/gasketed joints throughout — the building is air-conditioned (20–26 °C, 35–60 % RH) and must be airtight against smoke-season PM2.5. No skylights. Not bare metal sheet with blanket insulation. **See §1a for where mineral-wool core is required instead** |
|
||||
| Wall quantities | Masonry/precast dado **170 m perimeter × 2.5 m = 425 m²** (impact, security, washdown), internally insulated so the envelope stays continuous; **sandwich panel above dado ~1,140 m²** |
|
||||
| Floor | **200 mm** ground-bearing slab rated **30 kN/m² UDL**, provision for machine plinths, power-floated finish |
|
||||
| Finished floor level | **+1.2 m above surrounding ground** — see §1b |
|
||||
| Doors | 2 loading doors (insulated sectional) as **sealed dock positions**: dock shelters/seals plus dock levelers, so the docked trailer acts as the airlock and doors never open to outside air. Personnel entrances with vestibule; fire exits per code |
|
||||
| Loading dock | **Decide before pricing: dock-height (preferred) vs ground-level.** Dock-height means a recessed dock pit or ~1.2 m raised slab at the loading face — a civil-works item the contractor must include. The dispatch room behind the docks runs as a buffer climate zone, separated from the conditioned warehouse by interlocked high-speed roll doors |
|
||||
| Interior | **Shell only — no internal fit-out** in this price (clean room, offices etc. priced later) |
|
||||
|
||||
On the slab spec: 30 kN/m² (3 t/m²) is the standard industrial warehouse
|
||||
@@ -32,6 +33,73 @@ value-engineering option is to zone the slab — 30 kN/m² under press hall and
|
||||
warehouse only, lighter under offices — but for rough pricing the whole
|
||||
floor is specified at 30 so the number is conservative.
|
||||
|
||||
### 1a. Panel core: where PIR is not enough
|
||||
|
||||
PIR is specified for the general envelope because it gives the best thermal
|
||||
performance per millimetre (λ ≈ 0.022 W/mK, so roughly U 0.28 W/m²K walls
|
||||
and 0.21 W/m²K roof), which is what the conditioned interior needs. Two
|
||||
places it should **not** be used, and the contractor should price
|
||||
**mineral-wool core** panels instead:
|
||||
|
||||
- **Fire compartmentation.** A panel's reaction-to-fire class is not a fire
|
||||
resistance rating. Any wall required to compartment — production hall to
|
||||
warehouse, and anything separating the boiler hall — needs rated
|
||||
construction achieving **EI 60 or EI 120**, which in panel form means
|
||||
mineral wool, not PIR.
|
||||
- **Acoustics.** PIR performs poorly for sound, typically **Rw 25–30 dB**;
|
||||
it is a stiff closed-cell foam and behaves as a mass-spring-mass system
|
||||
with coincidence dips. Presses, compressors, chillers and the boiler are
|
||||
all significant sources and the site is agricultural land, so a neighbour
|
||||
complaint is a permitting risk. Mineral-wool core reaches roughly
|
||||
**Rw 32–40 dB**.
|
||||
|
||||
Ask the contractor to price the general envelope in PIR and to quote
|
||||
mineral-wool core as a **separate rate per m²** for nominated compartment
|
||||
and acoustic walls, stating the panel thickness needed to hold the same
|
||||
U-value (mineral wool at λ ≈ 0.038 needs roughly 130 mm walls / 180 mm roof
|
||||
to match, and is heavier — it may affect purlin and frame sizing).
|
||||
|
||||
**Open decision:** which elevations are acoustically governed. That depends
|
||||
on the neighbour to be identified at the land survey. Until then, price the
|
||||
mineral-wool rate but leave the area provisional.
|
||||
|
||||
### 1b. Raised floor and site fill
|
||||
|
||||
The dock-height question is now **decided**: the whole building floor is
|
||||
raised rather than forming a recessed dock pit. This is a civil works item
|
||||
and must be included.
|
||||
|
||||
| Item | Quantity |
|
||||
|---|---|
|
||||
| Compacted structural fill under the building platform | **1,711 m³** |
|
||||
| Fill build-up | 1.0 m compacted fill + 200 mm slab = **FFL +1.2 m** |
|
||||
| Reinforced concrete edge beam to retained faces | **56.1 m³**, ~85 m of retained edge |
|
||||
| Battered faces | Two faces battered at **1V:2H** rather than retained (no edge beam) |
|
||||
|
||||
The loading face and the car-park elevation are retained by the edge beam;
|
||||
the other two faces are battered. The dispatch room behind the docks runs as
|
||||
a buffer climate zone, separated from the conditioned warehouse by
|
||||
interlocked high-speed roll doors.
|
||||
|
||||
**Access at grade.** With FFL at +1.2 m the building needs its own access,
|
||||
now modelled and to be included:
|
||||
|
||||
| Item | Spec |
|
||||
|---|---|
|
||||
| Vehicle ramp | **10.5 m run × 4.5 m wide at 1:10**, rising 1,050 mm from yard level to FFL, sited at the far end of the building — opposite the docks, so it does not conflict with dock operations. **~22.9 m³** concrete |
|
||||
| Personnel steps | **3 flights**: main entrance on the car-park elevation, plus two fire exits — one at the opposite end of the same elevation, one at the dock end. Each **1.5 m wide, 6 risers at 175 mm, 5 treads at 280 mm, 1.2 m top landing**. **~2.3 m³** each |
|
||||
|
||||
Two things deliberately not in the model, to be priced anyway: **handrails**
|
||||
to both sides of every flight and to the ramp, and **door thresholds**.
|
||||
|
||||
The ramp is 1:10, which suits forklifts and vans but is **not** an
|
||||
accessible gradient. If a step-free staff entrance is required, that is a
|
||||
separate 1:12 ramp with intermediate landings — flag it now if wanted.
|
||||
|
||||
Exit positions are provisional: they are placed for reasonable escape
|
||||
distances on a 60 × 25 m footprint, but final numbers and locations follow
|
||||
the fire strategy and the racking layout, neither of which is fixed.
|
||||
|
||||
## 2. Detached utility yard
|
||||
|
||||
Simple industrial enclosures beside the main building.
|
||||
@@ -51,13 +119,33 @@ PIR.
|
||||
|
||||
| Item | Quantity |
|
||||
|---|---|
|
||||
| Perimeter wall | **~444 m** boundary, ~2 m high block/precast, on strip footing |
|
||||
| Main gate | Piers + sliding leaf, ~8 m clear opening |
|
||||
| Truck apron + internal circulation road | Heavy-duty concrete paving, roughly **1,500–2,000 m²** (rigid pavement for laden trucks) |
|
||||
| Car/scooter parking | Roofed canopies: **25 × 6 m** (10 cars) + **14 × 5 m** (~30 scooters), steel canopy carrying ~32 kWp PV |
|
||||
| Guard house | Small (~12 m²), insulated/AC'd, with toilet |
|
||||
| Tank foundations | Ring foundations for a **9 m dia × 4 m** fire water tank (~200 m³, ~250 t full) and a **5 m dia × 3 m** raw water tank, plus a small fire pump house. Tanks themselves are vendor-supplied bolted panels — foundations only |
|
||||
| Drainage & sanitation | Site stormwater drainage, domestic septic/treatment for ~25 staff |
|
||||
| Perimeter wall | **~444 m** boundary, **2.0 m** high block/precast on strip footing (~174 m³) |
|
||||
| Main gate | **One** gate only: piers plus **bi-parting sliding leaves, 10.0 m clear opening** (2 × 5 m). The previously mooted second gate is deleted |
|
||||
| Paving — heavy duty | **1,608 m²** rigid reinforced concrete for laden trucks: truck apron, dock face, internal circulation road, Phase 2 link |
|
||||
| Paving — general | **2,779 m²** lighter hardstanding: car park, yard and margins |
|
||||
| **Paving total** | **4,387 m²** — see note below |
|
||||
| Car/scooter parking | Roofed canopies: **27.7 × 7.0 m (195 m², 10 cars)** + **13.7 × 5.5 m (76 m², 30 scooters)**, steel canopy carrying **~40 kWp** PV |
|
||||
| Guard house | **12 m² (4 × 3 m)**, insulated/AC'd, with toilet; sited at the gate, north-west side |
|
||||
| Tank foundations | Ring foundation for a **9 m dia × 4 m** fire water tank (~200 m³, ~250 t full) sited in the **north-west corner of the plot**, with the **fire pump house adjacent to it**; plus a **5 m dia × 3 m** raw water tank. Tanks themselves are vendor-supplied bolted panels — foundations only |
|
||||
| Fire main | Ring main runs from the north-west corner to the buildings — quote the **length**, not just "a ring main" |
|
||||
| Drainage & sanitation | Site stormwater drainage, domestic septic/treatment for ~25 staff — **see note below** |
|
||||
|
||||
**On the paving quantity.** This is a deliberate increase: the site is now
|
||||
paved continuously from the road frontage through to the Phase 2 building.
|
||||
At 4,387 m² it is roughly 2.5× the 1,500–2,000 m² this sheet previously
|
||||
carried, and it becomes one of the larger civil numbers in the package. Two
|
||||
things follow:
|
||||
|
||||
- The two paving classes are quoted separately on purpose. Do **not** price
|
||||
the whole 4,387 m² at truck spec.
|
||||
- Roughly the last third of the general paving is the Phase 2 approach,
|
||||
which will be dug up again for Phase 2 piling and foundations. **Option to
|
||||
price:** compacted sub-base only now, surfaced after Phase 2 completes.
|
||||
|
||||
**On drainage.** 4,387 m² of pavement seals about **46 % of the 9,567 m²
|
||||
plot**. Runoff increases materially over the agricultural baseline, and
|
||||
stormwater attenuation — quite possibly a detention pond — may be required
|
||||
for the factory permit. Ask the contractor to state what they have assumed.
|
||||
|
||||
## 4. Exclusions
|
||||
|
||||
@@ -73,7 +161,14 @@ transformer (PEA), and land works beyond normal grading.
|
||||
soft-to-medium Lamphun valley soil and to **state the foundation
|
||||
assumption they price** (footings vs driven piles; a piled slab can add
|
||||
several hundred to 1,000+ THB/m²). The soil, not the slab spec, is the
|
||||
main price risk in the whole package.
|
||||
main price risk in the whole package — and it now applies to 4,387 m² of
|
||||
pavement and a 1,711 m³ fill platform as well as the building.
|
||||
- **Tank proximity to the building**: the fire water tank sits about 4.5 m
|
||||
from the main building. Full, it is ~250 t on a 9 m ring foundation. On
|
||||
soft ground, ask whether they price a deeper tank foundation, ground
|
||||
improvement, or want the tank moved further off.
|
||||
- **Panel core**: PIR general with mineral wool at compartment and acoustic
|
||||
walls (§1a) — separate rate per m², and any frame implications.
|
||||
- **Sprinklers**: OH2 sprinkler system, ring main, and hydrants are planned
|
||||
but not designed (see [facility security](../facility-security.md)). Ask
|
||||
whether they price it or use a specialist sub — quoted separately either
|
||||
@@ -88,8 +183,10 @@ transformer (PEA), and land works beyond normal grading.
|
||||
|
||||
- **THB/m² rough range for the PEB shell** at the insulated-panel spec
|
||||
above — not the bare-shed spec
|
||||
- A lump figure for the site works
|
||||
- The foundation/geotech assumption behind both
|
||||
- Separate rates for **heavy-duty** and **general** paving
|
||||
- A separate rate for **mineral-wool core** panel
|
||||
- A lump figure for the rest of the site works
|
||||
- The foundation/geotech assumption behind all of it
|
||||
|
||||
That is enough to sanity-check against the ~24–42M THB Thai-sourced
|
||||
utilities baseline in the [utilities CSV](utilities-investment.csv);
|
||||
|
||||
Reference in new issue