Biomass steam in both plans, PV on the factory roof only
Deploy test site / deploy (push) Successful in 49s
Deploy test site / deploy (push) Successful in 49s
User, 17 Oct 2026: "only put solar on the factory, prepare the other buildings for solar, option a and b should operate on biomass". - Steam: two 500 kg/h biomass modules (Getabec class, 6M to 10M THB) plus a fuel store and handling block (1M to 2M, estimate) in both plans; the electric bank becomes the alternative. ~0.67M THB of fuel a year against ~4.9M for electric steam; grid demand ~264 kW instead of ~980 kW. - Solar: ~520 kWp on the factory roof (the biomass-case optimum is ~500 to 550 kWp, hourly sketch in sustainability.md "PV size with biomass steam"); office roof and parking canopies built PV-ready (~120 kWp later). ~87 % used on site, ~61 % of the plant's electricity. - Calculator: biomass default, bFuel row, pvKWp 520, pvSelf 87, iso fills the factory roof first and shows the other roofs as PV-ready. - Numbers: launch plant ~168M / 232M / 296M with contingency; Plan A ~182M (~2M above 180M: the Chinese-route lever priced only electric boilers; a Chinese biomass quote is the way back), Plan B ~217M (label ~215M), ~35M more. Calculator EBITDA A 2.17M, B 2.23M USD. - CSV, total-investment, revenue-model, sustainability, scale, biomass, site-candidates, boi, steam-cooling, construction RFQ (canopies PV-ready), README, roadmap; business plan draft 0.3 rebuilt (A and B 63 pages) with new renders.
This commit is contained in:
1 parent
9ff5feef11
commit
984ced2485
35 files changed
+849
-665
No files matched your search
@@ -352,13 +352,14 @@ parameter does.
|
||||
- the BOI no longer promotes solar installations (since 1 July 2025;
|
||||
only the battery may qualify, [BOI](boi.md)).
|
||||
|
||||
Decided 17 October 2026: every roof and canopy carries PV. With the
|
||||
Decided 17 October 2026: PV on the factory roof only (~520 kWp), the
|
||||
flat office roof (~65 kWp around its AC units, estimate from the
|
||||
[calculator](fleet-calculator.html) drawing) that is **~640 kWp**, the
|
||||
size in the investment and the business plan. PEA's zero-export rule
|
||||
answers the first point (surplus curtailed, ~85 % used on site in an
|
||||
hourly sketch); the permits and the BOI position are in
|
||||
[sustainability](sustainability.md#roof-design-for-pv-candidate-mueang-chi-site).
|
||||
[calculator](fleet-calculator.html) drawing) and the canopies (~54 kWp)
|
||||
built PV-ready for later; steam is biomass, and with that load the best
|
||||
array is ~500 to 550 kWp. PEA's zero-export rule answers the first point
|
||||
(surplus curtailed, ~87 % used on site in an hourly sketch); the
|
||||
permits, the BOI position and the sizing are in
|
||||
[sustainability](sustainability.md#pv-size-with-biomass-steam).
|
||||
|
||||
FreeCAD 26.3.0 RC1 does not pass a cell edit on to the parts that read
|
||||
the cell (a normal recompute updates only the sheet). After editing
|
||||
|
||||
Reference in new issue