Biomass steam in both plans, PV on the factory roof only
Deploy test site / deploy (push) Successful in 49s

User, 17 Oct 2026: "only put solar on the factory, prepare the other
buildings for solar, option a and b should operate on biomass".

- Steam: two 500 kg/h biomass modules (Getabec class, 6M to 10M THB) plus
  a fuel store and handling block (1M to 2M, estimate) in both plans; the
  electric bank becomes the alternative. ~0.67M THB of fuel a year against
  ~4.9M for electric steam; grid demand ~264 kW instead of ~980 kW.
- Solar: ~520 kWp on the factory roof (the biomass-case optimum is ~500 to
  550 kWp, hourly sketch in sustainability.md "PV size with biomass
  steam"); office roof and parking canopies built PV-ready (~120 kWp
  later). ~87 % used on site, ~61 % of the plant's electricity.
- Calculator: biomass default, bFuel row, pvKWp 520, pvSelf 87, iso fills
  the factory roof first and shows the other roofs as PV-ready.
- Numbers: launch plant ~168M / 232M / 296M with contingency; Plan A
  ~182M (~2M above 180M: the Chinese-route lever priced only electric
  boilers; a Chinese biomass quote is the way back), Plan B ~217M (label
  ~215M), ~35M more. Calculator EBITDA A 2.17M, B 2.23M USD.
- CSV, total-investment, revenue-model, sustainability, scale, biomass,
  site-candidates, boi, steam-cooling, construction RFQ (canopies
  PV-ready), README, roadmap; business plan draft 0.3 rebuilt (A and B
  63 pages) with new renders.
This commit is contained in:
grabowski committed 2026-10-17 20:24:55 +07:00
1 parent 9ff5feef11
commit 984ced2485
35 files changed
+849 -665

No files matched your search

+1 -1
View File
@@ -161,7 +161,7 @@ PIR.
| Paving — heavy duty | **1,608 m²** rigid reinforced concrete for laden trucks: truck apron, dock face, internal circulation road, Phase 2 link |
| Paving — general | **2,779 m²** lighter hardstanding: car park, yard and margins |
| **Paving total** | **4,387 m²** — see note below |
| Car/scooter parking | Roofed canopies: **27.7 × 7.0 m (195 m², 10 cars)** + **13.7 × 5.5 m (76 m², 30 scooters)**, steel canopy carrying **~40 kWp** PV |
| Car/scooter parking | Roofed canopies: **27.7 × 7.0 m (195 m², 10 cars)** + **13.7 × 5.5 m (76 m², 30 scooters)**, steel canopy built **PV-ready** for ~40 kWp (structure for the panels' dead load and uplift, conduit to the main board); panels later, not in this contract |
| Guard house | **12 m² (4 × 3 m)**, insulated/AC'd, with toilet; sited at the gate, north-west side |
| Tank foundations | Ring foundation for a **9 m dia × 4 m** fire water tank (**~250 m³, ~250 t full** — the geometry gives 254 m³ gross; if 200 m³ usable with freeboard is intended, the foundation still carries the full 250 t) sited in the **north-west corner of the plot**, with the **fire pump house adjacent to it**; plus a **5 m dia × 3 m** raw water tank. Tanks themselves are vendor-supplied bolted panels — foundations only |
| Fire main | Ring main runs from the north-west corner to the buildings — quote the **length**, not just "a ring main" |