Biomass steam in both plans, PV on the factory roof only
Deploy test site / deploy (push) Successful in 49s
Deploy test site / deploy (push) Successful in 49s
User, 17 Oct 2026: "only put solar on the factory, prepare the other buildings for solar, option a and b should operate on biomass". - Steam: two 500 kg/h biomass modules (Getabec class, 6M to 10M THB) plus a fuel store and handling block (1M to 2M, estimate) in both plans; the electric bank becomes the alternative. ~0.67M THB of fuel a year against ~4.9M for electric steam; grid demand ~264 kW instead of ~980 kW. - Solar: ~520 kWp on the factory roof (the biomass-case optimum is ~500 to 550 kWp, hourly sketch in sustainability.md "PV size with biomass steam"); office roof and parking canopies built PV-ready (~120 kWp later). ~87 % used on site, ~61 % of the plant's electricity. - Calculator: biomass default, bFuel row, pvKWp 520, pvSelf 87, iso fills the factory roof first and shows the other roofs as PV-ready. - Numbers: launch plant ~168M / 232M / 296M with contingency; Plan A ~182M (~2M above 180M: the Chinese-route lever priced only electric boilers; a Chinese biomass quote is the way back), Plan B ~217M (label ~215M), ~35M more. Calculator EBITDA A 2.17M, B 2.23M USD. - CSV, total-investment, revenue-model, sustainability, scale, biomass, site-candidates, boi, steam-cooling, construction RFQ (canopies PV-ready), README, roadmap; business plan draft 0.3 rebuilt (A and B 63 pages) with new renders.
This commit is contained in:
1 parent
9ff5feef11
commit
984ced2485
35 files changed
+849
-665
No files matched your search
@@ -279,23 +279,20 @@ def blocks():
|
||||
"one observation: the steam's job is to heat the moulds and the cooling water's job is to remove "
|
||||
"that same heat again. Roughly 98% of the press cooling load is heat the steam put into the "
|
||||
"moulds, and the press cooling return leaves at about 60 °C. That warm return, the condensate and "
|
||||
"a fired boiler's flue gas are heat the plant reuses before it generates anything new."),
|
||||
"the biomass boilers' flue gas are heat the plant reuses before it generates anything new."),
|
||||
H3("Utilities: backbone once, modules with the presses"),
|
||||
P("Everything that is cheap to oversize now and costly to change in a running plant is built once, "
|
||||
"for the five-press fleet: the boiler hall and the chiller compound with room for four modules "
|
||||
"each, the steam main and condensate return, the cooling mains, the heat-exchanger frame and "
|
||||
"tanks, and hydraulic and compressed-air ring mains with a valved, capped tee at every press "
|
||||
"position. The machines that make steam and cold water come in identical modules: " + pick(
|
||||
"at launch two 500 kg/h boilers (B-1, B-2) for the 450 to 540 kg/h peak and two 250 kW "
|
||||
"air-cooled chillers rated at 40 °C ambient (CH-1, CH-2) for ~391.5 kW, sequenced lead and "
|
||||
"lag by one controller. Either boiler alone carries 93 to 111% of the steam demand; one "
|
||||
"chiller out leaves ~64% of the cooling peak. The boiler bodies come through the Chinese "
|
||||
"route and the compressor from a Chinese brand's Thai office (below). ",
|
||||
"at launch two 500 kg/h boilers (B-1, B-2) for the 450 to 540 kg/h peak and two 250 kW "
|
||||
"air-cooled chillers rated at 40 °C ambient (CH-1, CH-2) for ~391.5 kW, sequenced lead and "
|
||||
"lag by one controller. Either boiler alone carries 93 to 111% of the steam demand; one "
|
||||
"chiller out leaves ~64% of the cooling peak. The boilers and the compressor come from Thai "
|
||||
"suppliers, with local service (below). ") +
|
||||
"position. The machines that make steam and cold water come in identical modules: at launch "
|
||||
"two 500 kg/h biomass boilers (B-1, B-2) for the 450 to 540 kg/h peak (one ~1 t/h package is "
|
||||
"the alternative) and two 250 kW air-cooled chillers rated at 40 °C ambient (CH-1, CH-2) for "
|
||||
"~391.5 kW, sequenced lead and lag by one controller. Either boiler alone carries 93 to 111% of "
|
||||
"the steam demand; one chiller out leaves ~64% of the cooling peak. Both plans make their steam "
|
||||
"from biomass (below); " + pick(
|
||||
"the boilers come from a Thai maker and the compressor from a Chinese brand's Thai office. ",
|
||||
"the boilers and the compressor come from Thai suppliers, with local service. ") +
|
||||
"Identical modules mean one set of spares "
|
||||
"and one service routine, N+1 later is one more module rather than a redesign, and the plant "
|
||||
"never runs one oversized boiler at poor part load. Four boilers carry about eight presses with "
|
||||
@@ -305,7 +302,7 @@ def blocks():
|
||||
"station, ring main) is not costed yet; a Thai hydraulic power unit builder quotes it."),
|
||||
T(["Measure", "What it does", "Effect"], [
|
||||
["1. Flue-gas economizer (fired boilers)", "Recovers stack heat into the boiler feedwater; the "
|
||||
"first measure to investigate on a biomass or LPG bank (an electric boiler has no flue gas)",
|
||||
"first measure to investigate on the biomass bank (an electric boiler has no flue gas)",
|
||||
"Outlet and stack temperatures are vendor figures; rice-husk ash is abrasive, so the RFQ asks "
|
||||
"for cleaning, wear protection and a bypass"],
|
||||
["2. Condensate return", "As much clean, hot condensate back to the feed tank as possible",
|
||||
@@ -344,14 +341,15 @@ def blocks():
|
||||
"weekdays) and 2.6037 THB/kWh off-peak, plus the Ft fuel adjustment (+0.1623 THB/kWh for "
|
||||
"September to December 2026; it resets every four months) and reclaimable VAT. Two shifts put "
|
||||
"about two thirds of process energy into peak hours: a blended ~3.81 THB/kWh before the demand "
|
||||
"charge. For the five-press fleet the backbone is built for" +
|
||||
", without electric steam, that is "
|
||||
"roughly 4.5M to 6.8M THB a year before solar, 0.7M to 1.1M of it demand charge (estimates), on "
|
||||
"an 800 to 1,000 kVA connection. Three design consequences:"),
|
||||
"charge. For the five-press fleet the backbone is built for, on biomass steam with no electric "
|
||||
"boiler on the grid, that is roughly 4.5M to 6.8M THB a year before solar, 0.7M to 1.1M of it "
|
||||
"demand charge, on an 800 to 1,000 kVA connection; the launch plant's peak demand is ~264 kW, "
|
||||
"against ~980 kW had its steam been electric (estimates). Three design consequences:"),
|
||||
B([
|
||||
"**Biomass heat is far cheaper than electric steam** (below): the demand charge follows the "
|
||||
"boiler's full-power draw, and the peak window covers 13 of the 16 production hours.",
|
||||
"**Every roof gets PV, not solar thermal.** Self-consumed PV is worth ~3.7 THB/kWh" + pick(
|
||||
"**Steam comes from biomass in both plans,** because biomass heat is far cheaper than "
|
||||
"electric steam (below): an electric boiler's full-power draw would set the demand charge, and "
|
||||
"the peak window covers 13 of the 16 production hours.",
|
||||
"**The factory roof gets PV, not solar thermal.** Self-consumed PV is worth ~3.7 THB/kWh" + pick(
|
||||
" of grid power displaced, less the PPA price the plant pays for it (below)", "") +
|
||||
"; surplus earns nothing, because a factory on PEA's grid runs zero export (below); and PV "
|
||||
"cannot lower the demand charge, because the peak window runs to 22:00, long after sunset.",
|
||||
@@ -361,37 +359,47 @@ def blocks():
|
||||
]),
|
||||
H3("Renewable energy"),
|
||||
KV([
|
||||
["PV on every roof and canopy", "~640 kWp (decided October 2026: as much roof as possible). In "
|
||||
"the Payap scenario model the calculator draws the factory roof "
|
||||
"at ~523 kWp (901 modules of a generic 580 W placeholder; no "
|
||||
"module chosen yet), the car and scooter canopies at ~54 kWp and "
|
||||
"the office roof at ~65 kWp; the covered link and the utility "
|
||||
"yard are left out. ~900 MWh a year at 1,400 to 1,500 kWh/kWp, "
|
||||
"~85% of it used on site (~760 MWh: two shifts on 300 days, a "
|
||||
"~60 kW base load off-shift and the battery), about 38% of the "
|
||||
"launch plant's ~2,000 MWh a year with electric steam "
|
||||
"(estimates). " + pick(
|
||||
["PV on the factory roof", "~520 kWp (decided October 2026: PV on the factory only, the other "
|
||||
"roofs PV-ready). In the Payap scenario model the calculator draws "
|
||||
"the factory roof at ~523 kWp (901 modules of a generic 580 W "
|
||||
"placeholder; no module chosen yet). ~730 to 780 MWh a year at "
|
||||
"1,400 to 1,500 kWh/kWp, ~87% of it used on site (~633 MWh: two "
|
||||
"shifts on 300 days, a ~60 kW base load off-shift and the "
|
||||
"battery), about 61% of the launch plant's ~1,036 MWh a year of "
|
||||
"electricity with biomass steam (estimates). " + pick(
|
||||
"Taken through a solar PPA (below): the plant pays the PPA price for this power instead of "
|
||||
"buying the array, so its saving is the gap between that price and the ~3.7 THB/kWh of "
|
||||
"grid power it displaces",
|
||||
"Saves ~2.8M to 3.0M THB a year at ~3.7 THB/kWh self-consumed and pays back in ~4.2 to 5.9 "
|
||||
"years at 20 to 26 THB/W installed; the last ~340 kWp beyond the first ~300 pay back in "
|
||||
"~4.9 to 6.3 years, because more of their yield is curtailed on Sundays (estimates)")],
|
||||
["Zero export", "The ~15% the plant cannot use, mostly on Sundays and holidays, is curtailed, not "
|
||||
"Saves ~2.3M to 2.5M THB a year at ~3.7 THB/kWh self-consumed and pays back in ~4.1 to 5.8 "
|
||||
"years at 20 to 26 THB/W installed (estimates)")],
|
||||
["Why ~520 kWp", "With biomass steam the running load is ~230 kW, with no electric boilers. An "
|
||||
"hourly sketch (two shifts on 300 days, ~60 kW off-shift base load, the 271 kWh "
|
||||
"battery, PEA's time-of-use tariff with Ft, 23,000 THB/kWp, 25 years at 8%) "
|
||||
"puts the best array at ~500 to 550 kWp: the net present value peaks there, and "
|
||||
"the kWp above ~550 lose money because more of their yield is curtailed. The "
|
||||
"factory roof's ~520 kWp sits at that optimum (estimates)"],
|
||||
["PV-ready: office roof and canopies", "The office roof (~65 kWp) and the car and scooter canopies "
|
||||
"(~54 kWp: car ~42, scooter ~13) are built ready for panels: structure rated for them (~20 kg/m² "
|
||||
"plus wind uplift), conduit and a cable route to the main board, and a spare way for a later "
|
||||
"inverter. Panels go on when the load rises with the second Duplex system: ~120 kWp for ~2.4M "
|
||||
"to 3.1M THB at 20 to 26 THB/W (estimate). The preparation is small (estimate) and sits in the "
|
||||
"building and site works; the construction RFQ already specifies canopy steel carrying PV"],
|
||||
["Zero export", "The ~13% the plant cannot use, mostly on Sundays and holidays, is curtailed, not "
|
||||
"sold: a factory on PEA's grid runs zero export, with no payment for surplus and "
|
||||
"a zero-export controller (reverse-power relay) as part of the interconnection "
|
||||
"(CapSolar and Sahawatthanakit, 2026)"],
|
||||
["On the Mueang Chi hall", "The 60 × 25 m hall of section 6.2 takes only ~300 kWp: ~247 kWp on "
|
||||
"the 1,523 m² monopitch roof (425 modules) and ~40 to 54 kWp on the "
|
||||
"parking canopies. The rest would need ground mount on the ~70 m of "
|
||||
"plot behind the building (not covered by the rooftop exemption, so "
|
||||
"it may still need a factory permit) or the phase 2 roof (~251 "
|
||||
"kWp)"],
|
||||
["On the Mueang Chi hall", "The factory roof of the 60 × 25 m hall of section 6.2 takes only "
|
||||
"~247 kWp (425 modules on the 1,523 m² monopitch roof), about half "
|
||||
"the optimum; its parking canopies are PV-ready too (~40 to 54 kWp). "
|
||||
"More would need ground mount on the ~70 m of plot behind the "
|
||||
"building (not covered by the rooftop exemption, so it may still "
|
||||
"need a factory permit) or the phase 2 roof (~251 kWp)"],
|
||||
["Battery", "271 kWh Gobel Power LiFePO4 rack (15 stacked 18 kWh packs, 8,000+ cycles), USD "
|
||||
"39,900 to 58,000 listed (battery only; ~2.0M to 3.5M THB installed with enclosure, fire protection and "
|
||||
"controls, estimate), 50 to 60 day lead. Roughly an hour of the chiller bank's "
|
||||
"peak draw: ride-through, not off-grid autonomy"],
|
||||
["Inverters", "Deye three-phase hybrid units (30 to 80 kW class), ~500 kVA in all (estimate); "
|
||||
["Inverters", "Deye three-phase hybrid units (30 to 80 kW class), ~430 kVA in all (about nine 50 kW "
|
||||
"units, estimate); "
|
||||
"Thai distribution via Solar Nicolo; Deye is a supported protocol on the Gobel "
|
||||
"battery management"],
|
||||
["Roof design", "Monopitch at 10° falling toward ESE puts the whole roof on one plane at ~98% "
|
||||
@@ -400,7 +408,7 @@ def blocks():
|
||||
"burning-season dust"],
|
||||
["Permits", "Since Ministerial Regulation No. 3 B.E. 2567 (in force 28 December 2024) rooftop "
|
||||
"solar outside industrial estates is not a factory, so it needs no Ror.Ngor. 4 "
|
||||
"licence at any size. At ~500 kVA of inverters, under the 1,000 kVA line of the "
|
||||
"licence at any size. At ~430 kVA of inverters, under the 1,000 kVA line of the "
|
||||
"Energy Regulatory Commission (ERC), an ERC exemption notification replaces a "
|
||||
"generation licence. PEA approves the interconnection with zero-export control in 3 "
|
||||
"to 6 months, filed in parallel with procurement (CapSolar, 2026); the roof load is "
|
||||
@@ -410,12 +418,13 @@ def blocks():
|
||||
"against PVGIS before committing" + pick("; the PPA offer itself, price and "
|
||||
"terms", "")],
|
||||
pick(["Solar PPA (this plan)", "An installer owns and finances the PV and the battery, and the "
|
||||
"plant buys the power at a price still to quote. The PPA covers the full ~640 kWp; the "
|
||||
"calculator carries 3.0 THB/kWh (estimate) for the ~760 MWh used on site, ~2.3M THB or "
|
||||
"~0.07M USD a year on the energy line. That keeps the PV EPC (USD 388k to 504k, 12.8M to "
|
||||
"16.6M THB at 20 to 26 THB/W) and the battery (USD 61k to 106k) out of the capital round: "
|
||||
"~17.5M THB less at the midpoint, one of the six levers in section 8. The launch plant's "
|
||||
"power bill (~0.75M THB a month before solar, estimate) is well above the 100,000 THB a "
|
||||
"plant buys the power at a price still to quote. The PPA covers the ~520 kWp factory "
|
||||
"roof; the calculator carries 3.0 THB/kWh (estimate) for the ~633 MWh used on site, ~1.9M "
|
||||
"THB or ~0.06M USD a year on the energy line. That keeps the PV EPC (USD 315k to 410k, "
|
||||
"10.4M to 13.5M THB at 20 to 26 THB/W) and the battery (USD 61k to 106k) out of the capital "
|
||||
"round: ~14.7M THB less at the midpoint, one of the six levers in section 8. The launch "
|
||||
"plant's power bill (~0.36M THB a month before solar with biomass steam: ~1,036 MWh at the "
|
||||
"blended ~3.81 THB/kWh plus the demand charge, estimate) is well above the 100,000 THB a "
|
||||
"month CapSolar asks of a PPA site; PPA discounts run 10 to 15 % off the tariff at MEAei "
|
||||
"and 10 to 30 % at CapSolar, so the calculator's ~21 % is to be quoted. Leasing gives up no BOI benefit on the array: BOI stopped promoting solar "
|
||||
"installations on 1 July 2025 (Announcement 3/2568, section 7.1). A PPA developer selling "
|
||||
@@ -424,77 +433,94 @@ def blocks():
|
||||
"above and, if the PPA includes the battery, the battery's possible BOI eligibility as "
|
||||
"storage (to confirm with the BOI consultant). The PPA offer is asked against the "
|
||||
"specification above"],
|
||||
["Owned (this plan)", "The plant buys the array and the battery: PV EPC USD 388k to 504k "
|
||||
"(12.8M to 16.6M THB for ~640 kWp, 20 to 26 THB/W installed with inverters at Thai 2026 "
|
||||
"market prices; the canopy steel is in the building and site works) and the battery, "
|
||||
"installed, USD 61k to 106k (2.0M to 3.5M THB): ~17.5M THB together at the midpoint, "
|
||||
"estimates, section 8. Owning them saves the power bill a PPA would carry: at the "
|
||||
"calculator's 3.0 THB/kWh (estimate, to quote) for the ~760 MWh used on site, ~2.3M THB "
|
||||
"or ~0.07M USD a year. A solar PPA (an installer owns and finances them, the plant buys "
|
||||
"the power at a price still to quote) would take ~17.5M THB out of the capital round at "
|
||||
"the midpoint at the cost of that bill. The array itself carries no BOI benefit: BOI "
|
||||
["Owned (this plan)", "The plant buys the array and the battery: PV EPC USD 315k to 410k "
|
||||
"(10.4M to 13.5M THB for ~520 kWp on the factory roof, 20 to 26 THB/W installed with "
|
||||
"inverters at Thai 2026 market prices; the PV-ready canopy steel and conduit are in the "
|
||||
"building and site works) and the battery, installed, USD 61k to 106k (2.0M to 3.5M THB): "
|
||||
"~14.7M THB together at the midpoint, estimates, section 8. Owning them saves the power bill "
|
||||
"a PPA would carry: at the calculator's 3.0 THB/kWh (estimate, to quote) for the ~633 MWh "
|
||||
"used on site, ~1.9M THB or ~0.06M USD a year. A solar PPA (an installer owns and finances "
|
||||
"them, the plant buys the power at a price still to quote) would take ~14.7M THB out of the "
|
||||
"capital round at the midpoint at the cost of that bill. The array itself carries no BOI benefit: BOI "
|
||||
"stopped promoting solar installations on 1 July 2025 (Announcement 3/2568, section "
|
||||
"7.1); the owned battery may still qualify as storage (to confirm with the BOI "
|
||||
"consultant)"]),
|
||||
]),
|
||||
H3("Steam: the open engineering choice"),
|
||||
P("The boilers' fuel is still open; the modular bank works with either. There is no natural gas "
|
||||
"pipeline in Northern Thailand, so gas means a bulk LPG tank on site with hazardous-storage "
|
||||
"separation and licensing, and diesel means a fuel tank with price exposure. The two routes "
|
||||
"without a fossil tank, compared for the same heat (~1,120 to 1,280 MWh a year at about 1.0 "
|
||||
"million records, the top of the plant's range; estimates):"),
|
||||
T(["", "Electric boiler bank (~98%)", "Biomass boiler bank (~80%)"], [
|
||||
["Price of heat", "~3.9 THB/kWh, plus the demand charge", "~0.5 to 0.9 THB/kWh at 1.35 to 2 "
|
||||
"THB/kg delivered (reported market prices, October 2026; no supplier quote yet)"],
|
||||
["Running cost, mature two shifts", "~5.2M to 6.0M THB a year, including 0.8M to 1.0M of extra "
|
||||
"demand charge for the five-press bank", "~0.6M to 1.2M THB a year of fuel, plus handling "
|
||||
"and ash"],
|
||||
["Boiler package, 2 × 500 kg/h", pick("~2.8M to 5.5M THB through the Chinese route, the "
|
||||
"plan's price (4.5M to 7M from Thai suppliers)",
|
||||
"4.5M to 7M THB (Thai suppliers); the plan's price"),
|
||||
"~6M to 10M THB, plus the fuel store"],
|
||||
["Grid", "Peak ~950 to 1,330 kW: PEA Schedule 4, 1,250 to 1,600 kVA", "Unchanged, ~800 to "
|
||||
"1,000 kVA"],
|
||||
["Also", "Cleanest permitting, no fuel logistics, no stack", "Fuel contracts, a dry store sized "
|
||||
"for the monsoon, ash handling, a 14 m stack and its emissions"],
|
||||
], widths_mm=[36, 64, 70], font_pt=8.5),
|
||||
H3("Steam: biomass in both plans"),
|
||||
P("Both plans make their steam from biomass (decided October 2026): two 500 kg/h biomass modules "
|
||||
"(B-1, B-2) or one ~1 t/h package, Getabec class, 6M to 10M THB installed with the fuel feed, "
|
||||
"grate and dust control, plus a fuel store and handling block of 1.0M to 2.0M THB (a covered "
|
||||
"store, a chip bay, ash bins and a compact loader; utilities CSV, estimates). The electric boiler "
|
||||
"bank (4.5M to 7M THB from Thai suppliers, 2.8M to 5.5M through the Chinese route) is now the "
|
||||
"alternative, not the plan. There is no natural gas pipeline in Northern Thailand, so gas would "
|
||||
"mean a bulk LPG tank on site with hazardous-storage separation and licensing, and diesel a fuel "
|
||||
"tank with price exposure. The two routes without a fossil tank, compared for the launch plant "
|
||||
"at ~850k records a year (~1,403 t of steam, ~954 MWh of heat; estimates):"),
|
||||
T(["", "Biomass boiler bank (~80%): the plan", "Electric boiler bank (~98%): the alternative"], [
|
||||
["Price of heat", "~0.5 to 0.9 THB/kWh at 1.35 to 2 THB/kg delivered (reported market prices, "
|
||||
"October 2026; no supplier quote yet), ~0.7 planned", "~3.9 THB/kWh, plus the demand charge"],
|
||||
["Running cost, launch plant", "~0.67M THB a year of fuel at ~0.7 THB/kWh: about 300 t of "
|
||||
"air-dry wood or ~460 t of fresh chips, plus handling and ash", "~4.9M THB a year: ~973 MWh at "
|
||||
"the blended ~3.81 THB/kWh plus the demand charge on 2 × 360 kW of boilers"],
|
||||
["Boiler package, 2 × 500 kg/h", "~6M to 10M THB installed, plus 1.0M to 2.0M for the fuel "
|
||||
"store and handling", "4.5M to 7M THB from Thai suppliers, ~2.8M to 5.5M through the Chinese "
|
||||
"route"],
|
||||
["Grid", "Launch plant peak demand ~264 kW; 800 to 1,000 kVA for the five-press backbone",
|
||||
"~980 kW at launch; the five presses ~950 to 1,330 kW, PEA Schedule 4, 1,250 to 1,600 kVA"],
|
||||
["Also", "Fuel contracts and a monsoon stock, ash handling, a 14 m flue stack with a dust "
|
||||
"collector, more maintenance, a certified boiler attendant, emission limits in the permit",
|
||||
"Cleanest permitting, no fuel logistics, no stack"],
|
||||
], widths_mm=[32, 70, 68], font_pt=8.5),
|
||||
P("**Reading it.** The electric boiler is the more efficient machine; biomass is by far the cheaper "
|
||||
"heat. At maturity the fuel saving of ~4.0M to 5.4M THB a year repays the biomass premium in "
|
||||
"under a year (estimate), so the earlier staged path (start electric, add biomass later) is a "
|
||||
"permitting and fuel-logistics choice, not a cost one: every year on electric steam costs roughly "
|
||||
"1.4M to 5.4M THB more. The site can decide it too: next to the pharmaceutical facility on Payap "
|
||||
"land a biomass stack would be a hard sell, which favours electric or LPG there (section 6.1)."),
|
||||
P("**Fuel.** A biomass bank burns roughly 350 to 400 tonnes of air-dry wood a year at about 1.0 "
|
||||
"million records (~540 to 620 t as fresh chips, which is what the store and the monsoon stock are "
|
||||
"sized for). Lamphun alone produces more than 900,000 t of farm residues a year (Maejo "
|
||||
"University), so supply is not the constraint; price is. Reported prices follow diesel, so the "
|
||||
"fuel contract gets a diesel clause and sources within ~50 km. The local price-setter is Ratch "
|
||||
"Pathana's biomass buying centre at Pa Sak, Mueang Lamphun, which feeds a 9.6 MW cogeneration "
|
||||
"plant and competes for the same fuel. The team's own 60 rai of forestry-classified land could "
|
||||
"supply 80 to 135 t a year as short-rotation coppice once its title is checked; at market prices "
|
||||
"that is worth only ~0.1M to 0.25M THB a year, so its value is supply security and the story "
|
||||
"('records pressed with steam from our own trees'), not the fuel bill. Next step: written quotes "
|
||||
"from Pa Sak and two or three chip suppliers, priced by moisture, before the boiler decision."),
|
||||
P("**Where the boilers come from.** " + pick(
|
||||
"The plan buys the two modules through the Chinese route: boiler bodies from a Chinese maker "
|
||||
"with Thai references (ZOZEN, Sitong, Fangkuai, Taiguo), installed with the feed tank, pumps, "
|
||||
"header, controls and piping by a Thai boiler contractor, for roughly 2.8M to 5.5M THB "
|
||||
"installed against 4.5M to 7M from Thai suppliers, about 1.6M THB less at the midpoint. The "
|
||||
"compressor is a Chinese brand bought through its Thai office (Kaishan and Denair have one), "
|
||||
"so service stays local; with it the route saves ~1.9M THB at the midpoint (estimates from "
|
||||
"listings, not quotes). ",
|
||||
"The plan buys the two modules and the compressor from Thai suppliers (4.5M to 7M THB "
|
||||
"installed for the boilers). Chinese makers with Thai references (ZOZEN, Sitong, Fangkuai, "
|
||||
"Taiguo) could supply the boilers for roughly 2.8M to 5.5M THB installed, about 1.6M THB "
|
||||
"less at the midpoint, and with a Chinese compressor brand bought through its Thai office "
|
||||
"~1.9M less (estimates from listings, not quotes): a step if quotes land high. ") +
|
||||
"The specification is a 1.25 MPa design to ASME Section I with the S stamp; most Chinese packaged "
|
||||
"electric units are rated 0.4 to 0.8 MPa and cannot deliver 10 bar. An imported boiler must meet "
|
||||
"TIS, ASME, JIS, EN or an equivalent standard and be verified by a certification body registered "
|
||||
"with the Department of Industrial Works (DIW), engaged before the order (section 7). No mainland "
|
||||
"maker has a verified Thai service partner, so a Thai boiler contractor and the certification "
|
||||
"body are the service layer either way. Chillers and air conditioning, the larger blocks, have "
|
||||
"not been checked for a Chinese route yet."),
|
||||
"heat. At launch biomass saves **~4.2M THB (~0.13M USD) a year** against electric steam, so it "
|
||||
"repays its higher price and the fuel store (~3.8M to 5.4M THB more at the midpoints than a Thai "
|
||||
"or a Chinese electric bank) in about a year (estimates). Without electric boilers the plant's "
|
||||
"demand stays at ~264 kW instead of ~980 kW, which also means a smaller transformer and PEA "
|
||||
"deposit (not re-priced; an upside). The earlier staged path (start electric, add biomass later) "
|
||||
"is dropped: each year on electric steam would cost about that ~4.2M THB more. The site still "
|
||||
"matters: next to the pharmaceutical facility on Payap land a biomass stack is a hard sell, so "
|
||||
"the GMP-neighbour check (section 6.1) asks about it before any design work, and the electric "
|
||||
"bank is the fall-back there."),
|
||||
P("**What biomass brings with it.** Fuel contracts and a dry stock for the monsoon: the 42 m² store "
|
||||
"drawn in the utility yard holds ~6 to 7 weeks of fresh chips, and a 3-month monsoon stock needs "
|
||||
"~80 m² (estimates). Ash to handle and dispose of. The 14 m flue stack and the dust collector, "
|
||||
"already drawn in the utility yard. More maintenance than an electric bank, and a certified boiler "
|
||||
"attendant from the maintenance team as the licensed boiler controller (section 7.2). Boiler "
|
||||
"registration and the air-emission limits for a solid-fuel boiler in the permit work (to confirm, "
|
||||
"section 7.2). And a visible point source in Chiang Mai's burning season (February to April): dust "
|
||||
"control matters for the story as much as for the permit, and buying farm residues that would "
|
||||
"otherwise be burned in the fields is the other half of that story."),
|
||||
P("**Fuel.** The launch plant burns about 300 t of air-dry wood or ~460 t of fresh chips a year at "
|
||||
"~850k records; the five-press fleet at about 1.0 million records would burn 350 to 400 t air-dry "
|
||||
"(~540 to 620 t as fresh chips; estimates). Lamphun alone produces more than 900,000 t of farm "
|
||||
"residues a year (Maejo University), so supply is not the constraint; price is. Reported prices "
|
||||
"follow diesel, so the fuel contract gets a diesel clause and sources within ~50 km. The local "
|
||||
"price-setter is Ratch Pathana's biomass buying centre at Pa Sak, Mueang Lamphun, which feeds a "
|
||||
"9.6 MW cogeneration plant and competes for the same fuel. The team's own 60 rai of "
|
||||
"forestry-classified land could supply 80 to 135 t a year as short-rotation coppice, an upside "
|
||||
"once its title is checked; at market prices that is worth only ~0.1M to 0.25M THB a year, so its "
|
||||
"value is supply security and the story ('records pressed with steam from our own trees'), not "
|
||||
"the fuel bill. Next step: written quotes from Pa Sak and two or three chip suppliers, priced by "
|
||||
"moisture, before the boiler order."),
|
||||
P("**Where the boilers come from.** Both plans price the biomass modules from a Thai maker with "
|
||||
"Thai fabrication and service (Getabec class, 6M to 10M THB installed; utilities CSV, estimate). "
|
||||
"Chinese makers build biomass boilers too (ZOZEN DZL, Sitong DZL and SZL, Taiguo, Yongxing), but "
|
||||
"none is priced yet: the Chinese route checked so far priced only electric boilers. " + pick(
|
||||
"That makes a Chinese biomass quote a decision point for this plan: one ~2M THB or more below "
|
||||
"the Thai package would bring Plan A back under 180M THB at the midpoint. What this plan takes "
|
||||
"through the Chinese route is the compressor, a Chinese brand bought through its Thai office "
|
||||
"(Kaishan and Denair have one) so service stays local, ~0.25M THB less at the midpoint "
|
||||
"(estimate from listings, not a quote). ",
|
||||
"A Chinese biomass quote is a step if quotes land high, and so is a Chinese compressor brand "
|
||||
"bought through its Thai office (Kaishan and Denair have one), ~0.25M THB less at the midpoint "
|
||||
"(estimate from listings, not a quote); this plan buys the compressor from a Thai supplier. ") +
|
||||
"Any module, Thai or imported, is specified as a 1.25 MPa design to ASME Section I with the S "
|
||||
"stamp (most Chinese packaged electric units are rated 0.4 to 0.8 MPa and cannot deliver 10 bar). "
|
||||
"An imported boiler must meet TIS, ASME, JIS, EN or an equivalent standard and be verified by a "
|
||||
"certification body registered with the Department of Industrial Works (DIW), engaged before the "
|
||||
"order (section 7). No mainland maker has a verified Thai service partner, so for an imported "
|
||||
"boiler a Thai boiler contractor and the certification body would be the service layer. Chillers "
|
||||
"and air conditioning, the larger blocks, have not been checked for a Chinese route yet."),
|
||||
H3("Water"),
|
||||
P("Water arriving is still open: no source is confirmed for the candidate site (PWA mains, a "
|
||||
"licensed deep well, or both), and a water analysis comes before the boiler and chiller RFQs "
|
||||
@@ -522,12 +548,13 @@ def blocks():
|
||||
"acceptable the cost drops materially, and that question is on the RFQ list."),
|
||||
CALL("Efficiency in one paragraph, for the investor", "Steam and cooling are built once as a "
|
||||
"backbone and filled with identical modules as presses arrive; heat is recovered from the "
|
||||
"flue gas, the condensate and the press returns before more is generated; every roof and "
|
||||
"canopy carries PV" + pick(" through a solar PPA", "") + " (~640 kWp, over a third of the "
|
||||
"launch plant's electricity even with electric steam, estimate), with a battery for "
|
||||
"ride-through; no "
|
||||
"process water is discharged; a fifth of the plastic is reclaimed; and biomass steam, if "
|
||||
"chosen, costs a quarter to a tenth of electric steam. The same choices push the energy line "
|
||||
"flue gas, the condensate and the press returns before more is generated; steam comes from "
|
||||
"biomass in both plans, at about a seventh of what electric steam would cost (~0.67M against "
|
||||
"~4.9M THB a year at launch, estimate); the factory roof carries PV" +
|
||||
pick(" through a solar PPA", "") + " (~520 kWp, ~61% of the launch plant's electricity, "
|
||||
"estimate), with the office roof and the canopies ready for more panels and a battery for "
|
||||
"ride-through; no process water is discharged; and a fifth of the plastic is reclaimed. The "
|
||||
"same choices push the energy line "
|
||||
"toward its low end and hedge Thai tariff rises; the heat recovery and automation can count "
|
||||
"toward BOI's Smart and Sustainable Industry measure" + pick(
|
||||
"", " and the owned battery may qualify as storage") + " (section 7.1; BOI no longer "
|
||||
@@ -688,7 +715,8 @@ def blocks():
|
||||
"the same land"],
|
||||
], widths_mm=[28, 44, 44, 54], font_pt=8.5),
|
||||
P("**Galvanics now raises the bar for every site.** With the electroplating line in the plan, a "
|
||||
"plot has to permit record pressing with a steam boiler **and** electroplating from day "
|
||||
"plot has to permit record pressing with a biomass-fired steam boiler **and** electroplating "
|
||||
"from day "
|
||||
"one, not in a later phase. That favours the industrial estate (licensing through the estate, "
|
||||
"shared effluent treatment) and makes zoning the first check everywhere else."),
|
||||
P("**Payap University** approached the project and is interested in leasing land next to a "
|
||||
@@ -706,11 +734,12 @@ def blocks():
|
||||
"could back the PVC lab. Any Payap plot is checked in this order, before any design work:"),
|
||||
N([
|
||||
"**Zoning:** the plot's zone in the Chiang Mai city plan allows a record-pressing factory with a "
|
||||
"steam boiler and electroplating (the neighbour's pharmaceutical permit proves little).",
|
||||
"biomass-fired steam boiler and electroplating (the neighbour's pharmaceutical permit proves "
|
||||
"little).",
|
||||
"**Lease-ability:** Chanote title, university council approval, and whether campus land of a "
|
||||
"private university can be leased commercially; with Thai counsel, together with the lease "
|
||||
"terms below.",
|
||||
"**The GMP neighbour:** a pharmaceutical plant is sensitive to the boiler stack, galvanics "
|
||||
"**The GMP neighbour:** a pharmaceutical plant is sensitive to the biomass boiler's stack, galvanics "
|
||||
"extraction, extrusion fumes, noise and trucks; emission and buffer rules go into the lease, "
|
||||
"not after the first complaint.",
|
||||
"**Flooding:** Payap describes the land as low-lying when bought; check the plot against the "
|
||||
@@ -743,9 +772,9 @@ def blocks():
|
||||
"figure.",
|
||||
]),
|
||||
P("Land requirements: ~4 rai minimum, 6 to 8 rai comfortable with expansion; truck access and "
|
||||
"turning, parking, the detached utility yard, a separated battery enclosure, and a medium-voltage "
|
||||
"connection from PEA (800 to 1,000 kVA for the five-press backbone without electric steam, 1,250 "
|
||||
"to 1,600 kVA with it)."),
|
||||
"turning, parking, the detached utility yard with truck access for biomass deliveries, a "
|
||||
"separated battery enclosure, and a medium-voltage connection from PEA (800 to 1,000 kVA for the "
|
||||
"five-press backbone on biomass steam; electric steam would need 1,250 to 1,600 kVA)."),
|
||||
|
||||
H2("6.2 The building"),
|
||||
P("The main building is a single-storey steel portal frame (pre-engineered) of **60 × 25 m "
|
||||
@@ -791,12 +820,14 @@ def blocks():
|
||||
"figures and their source."),
|
||||
IMG(pick("renders/calculator/plan-a-iso-roof.png", "renders/calculator/plan-b-iso-roof.png"), 170,
|
||||
"Figure 8. The site from above, " + label() + " preset of the plant and business plan calculator: "
|
||||
"every roof and canopy carries PV, ~640 kWp on the factory, the office and the car and scooter "
|
||||
"parking" + pick(", supplied through the solar PPA (the battery is drawn too; whether a PPA offer "
|
||||
"includes it is open)", ", owned with the battery") +
|
||||
"; the utility yard (boiler hall and chiller compound built for four modules each, pump and "
|
||||
"heat-exchanger room, transformer, water treatment, PVC silos) and the phase 2 reserve. Schematic render of the Payap scenario model (docs/fleet-calculator.html); "
|
||||
"positions and envelopes are estimates."),
|
||||
"PV on the factory roof, ~520 kWp" + pick(", supplied through the solar PPA (the battery is drawn "
|
||||
"too; whether a PPA offer includes it is open)",
|
||||
", owned with the battery") +
|
||||
", with the office roof and the car and scooter canopies PV-ready and without panels; the "
|
||||
"utility yard (biomass boiler hall and chiller compound built for four modules each, the "
|
||||
"biomass fuel store, the flue stack and dust collector, pump and heat-exchanger room, "
|
||||
"transformer, water treatment, PVC silos) and the phase 2 reserve. Schematic render of the "
|
||||
"Payap scenario model (docs/fleet-calculator.html); positions and envelopes are estimates."),
|
||||
IMG(pick("renders/calculator/plan-a-iso-gf.png", "renders/calculator/plan-b-iso-gf.png"), 170,
|
||||
"Figure 9. Ground floor with the roofs cut away, " + label() + " preset: from the west end the "
|
||||
"staff entry, workshop, galvanics (PASU, PPPU, PDPU, PMPB), Sibert stamper prep, metrology" +
|
||||
@@ -810,12 +841,14 @@ def blocks():
|
||||
IMG(pick("renders/calculator/plan-a-iso-hall.png", "renders/calculator/plan-b-iso-hall.png"), 170,
|
||||
"Figure 10. The press hall close up, " + label() + " preset: " + pick(
|
||||
"Duplex system 1 (two HRP 12 presses with their extruders) and the Classic; the dashed "
|
||||
"outlines are the free Duplex bays and Classic positions for growth. In the yard, boiler "
|
||||
"modules B-1 and B-2 and chillers CH-1 and CH-2, with B-3, B-4, CH-3 and CH-4 free",
|
||||
"outlines are the free Duplex bays and Classic positions for growth. In the yard, biomass "
|
||||
"boiler modules B-1 and B-2 with the fuel store, flue stack and dust collector, and chillers "
|
||||
"CH-1 and CH-2, with B-3, B-4, CH-3 and CH-4 free",
|
||||
"Duplex system 1 (two HRP 12 presses with their extruders) and the Classic, in a hall laid "
|
||||
"out for five Duplex bays and four Classic positions; the dashed outlines are the free bays "
|
||||
"and positions for growth. In the yard, boiler modules B-1 and B-2 and chillers CH-1 and "
|
||||
"CH-2, with B-3, B-4, CH-3 and CH-4 free; the 5 t crane over the hall, the visitor corridor "
|
||||
"and positions for growth. In the yard, biomass boiler modules B-1 and B-2 with the fuel "
|
||||
"store, flue stack and dust collector, and chillers CH-1 and CH-2, with B-3, B-4, CH-3 and "
|
||||
"CH-4 free; the 5 t crane over the hall, the visitor corridor "
|
||||
"and the cassette and CD-R rooms are in place") +
|
||||
". Schematic, estimates."),
|
||||
H3("Crane, workshop and visitor corridor"),
|
||||
@@ -873,17 +906,18 @@ def blocks():
|
||||
])),
|
||||
H3("Utility yard and water-treatment building"),
|
||||
T(["Detached utility yard (decided October 2026)", "Size (estimate)"], [
|
||||
["Boiler hall, four 500 kg/h module positions (B-1 and B-2 at launch)", "~162 m² (18 × 9 m), "
|
||||
["Boiler hall, four 500 kg/h biomass module positions (B-1 and B-2 at launch)", "~162 m² (18 × 9 m), "
|
||||
"6.0 m high"],
|
||||
["Biomass fuel store", "42 m²"],
|
||||
["Biomass fuel store (~6 to 7 weeks of fresh chips; ~80 m² would hold a 3-month monsoon "
|
||||
"stock)", "42 m² drawn"],
|
||||
["Chiller compound, open and screened, four pads (CH-1 and CH-2"
|
||||
" at launch)", "~135 m² (12.5 × "
|
||||
"10.8 m)"],
|
||||
["Cooling pump and heat-exchanger room", "~40 m² (8 × 5 m)"],
|
||||
["Flue stack", "14 m"],
|
||||
["Flue stack, with the dust collector and fans along the boiler hall's back wall", "14 m"],
|
||||
["**Yard in all**", "**~379 m²**, against 178 m² before the four-module decision"],
|
||||
], widths_mm=[110, 60],
|
||||
caption="The fired case sets the boiler hall (an electric bank would need about half). No "
|
||||
caption="The biomass bank of both plans sets the boiler hall (an electric bank would need about half). No "
|
||||
"cooling tower: the chillers are air-cooled. The rooms are built once for four modules "
|
||||
"and the plant goes in one module at a time; the yard sits outside the main building "
|
||||
"because the boiler must have its own room and biomass deliveries need yard access."),
|
||||
@@ -904,8 +938,8 @@ def blocks():
|
||||
H3("Site works and the second building"),
|
||||
P("On the Mueang Chi parcel the site works are a ~444 m perimeter wall, one 10 m sliding gate with "
|
||||
"a guard house, 4,387 m² of paving in two classes (1,608 m² heavy-duty for trucks, 2,779 m² "
|
||||
"general), roofed parking for 10 cars and 30 scooters with its canopies fully covered in PV (~54 "
|
||||
"kWp; ~40 kWp in the construction RFQ), a ring foundation "
|
||||
"general), roofed parking for 10 cars and 30 scooters under PV-ready canopies (steel for ~40 "
|
||||
"kWp of panels in the construction RFQ; panels later), a ring foundation "
|
||||
"for a 9 m fire-water tank with its pump house and one for a 5 m raw-water tank, a fire ring main "
|
||||
"and hydrants, stormwater drainage and domestic sanitation. With the buildings, ~6,549 m² or 68% "
|
||||
"of the modelled plot is sealed, so stormwater attenuation, quite possibly a detention pond, may "
|
||||
@@ -930,7 +964,9 @@ def blocks():
|
||||
"utility yard with floors, pads and plinths for all four positions; a lump sum for the rest of "
|
||||
"the site works; and the foundation assumption behind all of it. It excludes process machinery, "
|
||||
"PV, air conditioning, boilers, chillers and tanks, sprinklers, fit-out and the PEA transformer, "
|
||||
"and asks whether permit drawings for the building permit and the factory licence are included."),
|
||||
"and asks whether permit drawings for the building permit and the factory licence are included. "
|
||||
"The PV-ready provisions (the canopy steel it already specifies, roof loads for panels, conduit to "
|
||||
"the main board and a spare way for a later inverter) belong to the same works."),
|
||||
H3("What the building costs, and what is not known"),
|
||||
T(["Block", "USD", "THB", "Basis"], [
|
||||
["Building ~1,500 m² plus civil and site works", "650k to 1,100k", "21.4M to 36.3M",
|
||||
@@ -948,7 +984,8 @@ def blocks():
|
||||
["Visitor corridor and accessible entrance", "67k to 148k", "2.2M to 4.9M", "estimate; "
|
||||
"building it later would take ~3.6M THB out at the midpoint"]),
|
||||
["Utility yard for four boiler and four chiller modules", "73k to 122k", "2.4M to 4.0M",
|
||||
"estimate at the building rate"],
|
||||
"estimate at the building rate; the biomass fuel store and handling (1.0M to 2.0M THB) sit in "
|
||||
"the utilities block"],
|
||||
["Water-treatment building next to galvanics", "52k to 87k", "1.7M to 2.9M", "estimate at the "
|
||||
"building rate"],
|
||||
pick(["**Together**", "**~0.84M to 1.48M**", "**~28M to 49M**", "sum of the blocks; the plan "
|
||||
@@ -979,8 +1016,8 @@ def blocks():
|
||||
"decontamination procedures, eyewash and emergency shower at the line, and a hard-wired "
|
||||
"interlock (no extraction, no plating). A machine is lifted only after lockout (power isolated, "
|
||||
"steam vented, hydraulics depressurised including the accumulator) and with a lift plan; hot work "
|
||||
"stays in the workshop under a permit; the boilers run under a licensed boiler controller "
|
||||
"(section 7)."),
|
||||
"stays in the workshop under a permit; the biomass boilers run under a licensed boiler "
|
||||
"controller, a certified attendant from the maintenance team (section 7.2)."),
|
||||
P("Decided in October 2026: every member of staff, office included, gets group health insurance "
|
||||
"(inpatient and outpatient) and a yearly check-up on top of social security, plus the "
|
||||
"occupational checks Thai law requires for risk-factor work (press-floor heat and noise, "
|
||||
@@ -1060,8 +1097,8 @@ def blocks():
|
||||
"machinery and raw materials lives, from the first capex invoice."),
|
||||
P("**Process:** file via the e-Investment system and present at an analyst meeting. BOI quotes "
|
||||
"about 40 working days to a decision for projects under THB 200M and 60 to 90 working days for "
|
||||
"larger tiers; at " + pick("~127M to 226M THB with the ramp-up reserve (~177M at the midpoint)",
|
||||
"~156M to 275M THB with the ramp-up reserve (~216M at the midpoint)") +
|
||||
"larger tiers; at " + pick("~132M to 233M THB with the ramp-up reserve (~182M at the midpoint)",
|
||||
"~156M to 277M THB with the ramp-up reserve (~217M at the midpoint)") +
|
||||
" the plan sits around that line, so the consultant "
|
||||
"confirms which applies. In practice it is roughly 4 to 6 months end to end to the certificate; "
|
||||
"the company is incorporated under it; machinery is imported within a window commonly 30 months "
|
||||
@@ -1071,7 +1108,8 @@ def blocks():
|
||||
"directly."),
|
||||
H2("7.2 Factory licence, galvanics and boilers"),
|
||||
P("BOI promotion does not replace the factory licence (Ror.Ngor. 4), hazardous-substance "
|
||||
"registration for the plating chemistry, wastewater permitting or the boiler rules. **Galvanics "
|
||||
"registration for the plating chemistry, wastewater permitting, the boiler rules or the air-emission "
|
||||
"limits for the biomass boiler's stack. **Galvanics "
|
||||
"is in the plant from launch, so the electroplating line, its chemistry and its zero-discharge "
|
||||
"effluent system are in the first factory licence application**, not a later amendment. The "
|
||||
"earlier plan to keep galvanics out of the first licence to protect the schedule no longer "
|
||||
@@ -1079,7 +1117,7 @@ def blocks():
|
||||
"sits on the path to the first paying release:"),
|
||||
B([
|
||||
"**The site must permit plating from day one** (section 6.1): zoning has to allow a "
|
||||
"record-pressing factory with a steam boiler and an electroplating line. The industrial "
|
||||
"record-pressing factory with a biomass-fired steam boiler and an electroplating line. The industrial "
|
||||
"estate's licensing and shared effluent treatment are the easiest path; on Mueang Chi the "
|
||||
"permit is ours; on Payap land the lessor's written consent comes on top.",
|
||||
"**Zero discharge is the design, and the application says so:** rinse water through the ZLD "
|
||||
@@ -1100,13 +1138,16 @@ def blocks():
|
||||
"reported to DIW within 30 days; **a licensed boiler controller on site**; and **inspection at "
|
||||
"least once a year**. The relief for small once-through units does not apply at ~10.5 bar (our "
|
||||
"reading), and the labour-side regulation of 2021 adds licensed-engineer installation and "
|
||||
"testing and a feedwater standard. " + pick(
|
||||
"**This plan's two boiler bodies come from a Chinese maker, so they take the imported-boiler "
|
||||
"route of the notification:** verification by a registered certification body with the full "
|
||||
"dossier, and an ASME Section I design at 1.25 MPa with the S stamp, because a boiler built "
|
||||
"to the Chinese GB code would rest on 'or equivalent' with no precedent found. ",
|
||||
"The plan's modules come from Thai suppliers to the same ASME specification; a Chinese "
|
||||
"boiler built to the Chinese GB code would rest on 'or equivalent' with no precedent found. ") +
|
||||
"testing and a feedwater standard. Both plans price the biomass modules from a Thai maker to the "
|
||||
"ASME specification of section 5.4. A Chinese biomass boiler" + pick(
|
||||
" (the open decision point of section 5.4)", "") + " would take the imported-boiler route of "
|
||||
"the notification: verification by a registered certification body with the full dossier, and an "
|
||||
"ASME Section I design at 1.25 MPa with the S stamp, because a boiler built to the Chinese GB code "
|
||||
"would rest on 'or equivalent' with no precedent found. **Biomass adds to the permit work** (to "
|
||||
"confirm with the permit engineer before the RFQ): the boiler registered with DIW; the air-emission "
|
||||
"limits for a solid-fuel boiler met at the 14 m stack, with the dust collector in the boiler "
|
||||
"package; the fuel store and ash handling in the factory licence drawings; and the licensed "
|
||||
"boiler controller, a certified attendant from the maintenance team. " +
|
||||
"DIW has announced a "
|
||||
"revision of the boiler, pressure-vessel and refrigeration rules, so they are rechecked before "
|
||||
"the RFQ, and a certification body is engaged before any boiler order."),
|
||||
|
||||
Reference in new issue