Biomass steam in both plans, PV on the factory roof only
Deploy test site / deploy (push) Successful in 49s
Deploy test site / deploy (push) Successful in 49s
User, 17 Oct 2026: "only put solar on the factory, prepare the other buildings for solar, option a and b should operate on biomass". - Steam: two 500 kg/h biomass modules (Getabec class, 6M to 10M THB) plus a fuel store and handling block (1M to 2M, estimate) in both plans; the electric bank becomes the alternative. ~0.67M THB of fuel a year against ~4.9M for electric steam; grid demand ~264 kW instead of ~980 kW. - Solar: ~520 kWp on the factory roof (the biomass-case optimum is ~500 to 550 kWp, hourly sketch in sustainability.md "PV size with biomass steam"); office roof and parking canopies built PV-ready (~120 kWp later). ~87 % used on site, ~61 % of the plant's electricity. - Calculator: biomass default, bFuel row, pvKWp 520, pvSelf 87, iso fills the factory roof first and shows the other roofs as PV-ready. - Numbers: launch plant ~168M / 232M / 296M with contingency; Plan A ~182M (~2M above 180M: the Chinese-route lever priced only electric boilers; a Chinese biomass quote is the way back), Plan B ~217M (label ~215M), ~35M more. Calculator EBITDA A 2.17M, B 2.23M USD. - CSV, total-investment, revenue-model, sustainability, scale, biomass, site-candidates, boi, steam-cooling, construction RFQ (canopies PV-ready), README, roadmap; business plan draft 0.3 rebuilt (A and B 63 pages) with new renders.
This commit is contained in:
1 parent
9ff5feef11
commit
984ced2485
35 files changed
+849
-665
No files matched your search
+14
-5
@@ -1,9 +1,18 @@
|
||||
# Biomass Fuel Strategy
|
||||
|
||||
If the steam boiler goes the biomass route (see the options in
|
||||
[sustainability](sustainability.md) and the Getabec candidate in the
|
||||
[utilities CSV](finance/utilities-investment.csv)), the fuel comes from two
|
||||
sources: the team's own 60 rai of currently unused land, and northern
|
||||
**Decided 17 October 2026 (user): both business plan versions run on
|
||||
biomass steam** ("option a and b should operate on biomass"): two 500 kg/h
|
||||
biomass modules (or one ~1 t/h package, Getabec class, 6M to 10M THB
|
||||
installed with fuel feed, grate and dust control) plus a fuel store and
|
||||
handling block (1M to 2M THB, estimate) in the
|
||||
[utilities CSV](finance/utilities-investment.csv). The launch plant at
|
||||
~850k records burns ~954 MWh of heat a year, about 300 t of air-dry wood
|
||||
or ~460 t of fresh chips, ~0.67M THB at 0.7 THB/kWh, against ~4.9M THB a
|
||||
year for electric steam with its demand charge (calculator, estimates).
|
||||
The electric-first staged path under Decision framing is dropped; the
|
||||
electric bank stays the alternative.
|
||||
|
||||
The fuel comes from two sources: the team's own 60 rai of currently unused land, and northern
|
||||
Thailand's agricultural waste market. Figures below are planning estimates,
|
||||
plus or minus a wide margin, to be refined against the actual boiler choice
|
||||
and duty cycle.
|
||||
@@ -165,7 +174,7 @@ storage are additional.
|
||||
[grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides)).
|
||||
The electric boiler is the more efficient machine; biomass is the far
|
||||
cheaper heat
|
||||
- A staged path is possible: start electric (fast, clean permitting), plant
|
||||
- (Superseded 17 October 2026: biomass from the launch.) A staged path is possible: start electric (fast, clean permitting), plant
|
||||
the coppice now (first harvest in 2 to 4 years), and add the biomass
|
||||
boiler at the automated-line expansion when demand and the fuel supply
|
||||
have both matured. At the tariff above that is a permitting and logistics
|
||||
|
||||
Reference in new issue