Payap still an option: rezoning route; order example opaque
Deploy test site / deploy (push) Successful in 2m40s
Deploy test site / deploy (push) Successful in 2m40s
User, 20 Oct 2026: Payap University claims they can rezone the land; update the deck to show it is still an option. And: do not use a transparent vinyl as the example in the order tool screenshot. - land-listings/payap/rezoning-2026-10-20.md (new): what a rezoning is under the Town Planning Act B.E. 2562 (section 35 amendment started by DPT or the local official, Town Planning Commission, 30-day posting with objections, Ministry of Interior notification via Cabinet and the Royal Gazette; a landowner can ask, not rezone), the DPT's own work plan (~70 weeks without objections, ~82 with: ~16 to 19 months), the schedule effect (roughly a year on first production unless the request starts now; estimate) and what to ask Payap. DPT procedure PDF filed. - site-candidates.md: Payap "still an option" in the table, rezoning paragraph with an Open action, check 1 and the re-siting rule; zoning record, payap-partnership.md and README point to it. - Business plan 6.1, risk table and critical path: Payap's rezoning claim and its ~16 to 19 months; A and B rebuilt (63 pages, checked). - Deck: site slide names Payap as an option once rezoned, notes and source line; risk row updated. - order.html: the "Splatter 12"" preset now has a white base instead of clear; deck platform screenshots re-shot in both themes (numbers unchanged: 100 fans, break-even 46, ~480 THB kept). Order checks 96/96, fan parity 206/206; deck verify clean in both themes, PDFs rebuilt.
This commit is contained in:
1 parent
744a56d22b
commit
967e6b1c76
20 files changed
+171
-17
No files matched your search
+36
-5
@@ -17,11 +17,11 @@ first) ([galvanics and stamper prep](equipment/galvanics.md)).
|
||||
|
||||
| | Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai |
|
||||
|---|---|---|---|
|
||||
| Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us. The point it gave fails zoning (checked 14 October 2026); other Payap land not yet checked |
|
||||
| Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | Still an option. New lead (October 2026): the university approached the project and is interested in leasing land to us. The point it gave fails zoning as the plan stands (checked 14 October 2026); Payap says the land can be rezoned (20 October 2026), which takes a city-plan amendment of ~16 to 19 months by the planning department's own schedule; other Payap land not yet checked |
|
||||
| Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) |
|
||||
| Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Point given: 18.7977 N, 99.0383 E; parcel boundary, size and title not yet known. The main (Mae Khao) campus is at 18.795 N, 99.033 E |
|
||||
| Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway |
|
||||
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | At the point given: zone ย.7-1, very high density residential, record pressing not permitted (Chiang Mai city plan, 25 May 2026) |
|
||||
| Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | At the point given: zone ย.7-1, very high density residential, record pressing not permitted (Chiang Mai city plan, 25 May 2026). Rezoning claimed by Payap, not yet requested in writing ([what it takes](land-listings/payap/rezoning-2026-10-20.md)) |
|
||||
| Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit |
|
||||
| Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land |
|
||||
|
||||
@@ -77,6 +77,34 @@ purchases across the ring road) is worth checking before the lead is
|
||||
dropped. Source record with the zone's full rules and annex:
|
||||
[land-listings/payap](land-listings/payap/dpt-zoning-2026-10-14.md).
|
||||
|
||||
**Rezoning: Payap says it can be done (20 October 2026).** Payap
|
||||
University told the project that the land can be rezoned, so the lead
|
||||
stays open. What that takes, from the Town Planning Act B.E. 2562 and the
|
||||
planning department's own procedure (details and sources in
|
||||
[rezoning](land-listings/payap/rezoning-2026-10-20.md)):
|
||||
|
||||
- The plan in force is a Ministry of Interior notification. After it is
|
||||
issued, an area is changed under **section 35**: the Department of Public
|
||||
Works and Town and Country Planning or the local official starts the
|
||||
amendment for changed circumstances or the public interest, the Town
|
||||
Planning Commission approves it, it is posted for 30 days for
|
||||
objections, and a new notification goes through the Cabinet into the
|
||||
Royal Gazette. The landowner can ask and argue the public interest
|
||||
(a university-industry training plant, jobs); it cannot rezone itself.
|
||||
- The department schedules **~70 weeks (~16 months) without objections,
|
||||
~82 weeks (~19 months) with** for such an amendment. In a residential
|
||||
zone, objections are likely.
|
||||
- Building permit and factory licence wait for the amendment to be in
|
||||
force. Begun in early 2027 it would land around mid-2028, so a rezoned
|
||||
Payap plot moves first production (~Q4 2028 on the August calendar) by
|
||||
roughly a year, unless the request starts now and design runs at risk in
|
||||
parallel (our reading, estimate).
|
||||
- **Open:** ask Payap which plot (title deed, map), what it has filed or
|
||||
will file with the Chiang Mai provincial public works and town planning
|
||||
office, which zone it would request, and the office's answer in
|
||||
writing. Until then the rezoning is Payap's statement, not a planning
|
||||
fact.
|
||||
|
||||
**Why it is worth pursuing.**
|
||||
|
||||
- **Location.** About 5 km from the old city and 25 to 30 km nearer the
|
||||
@@ -99,8 +127,9 @@ dropped. Source record with the zone's full rules and annex:
|
||||
|
||||
**What could rule it out** (check in this order, before any design work):
|
||||
|
||||
1. **Zoning.** Failed at the point Payap gave (zone ย.7-1, above). For any
|
||||
other plot: its zone in the Chiang Mai comprehensive city plan and whether it allows a record-pressing factory with a steam boiler and,
|
||||
1. **Zoning.** Failed at the point Payap gave as the plan stands (zone
|
||||
ย.7-1, above); passes there only if the rezoning Payap describes is
|
||||
gazetted (above). For any other plot: its zone in the Chiang Mai comprehensive city plan and whether it allows a record-pressing factory with a steam boiler and,
|
||||
later, electroplating. A pharmaceutical or cosmetics plant and an
|
||||
electroplating line are different factory classes, so the neighbour's
|
||||
permit proves little. Ask the provincial public works and town planning
|
||||
@@ -140,7 +169,9 @@ what collaboration the university wants in return.
|
||||
Nothing has been re-sited. The parametric model, PV roof study, RFQ and
|
||||
the fleet site code `lpn` in the [digital factory](digital-factory.md)
|
||||
stay on Mueang Chi until a Payap plot is known and has passed checks 1
|
||||
and 2. The point Payap gave on 14 October 2026 fails check 1.
|
||||
and 2. The point Payap gave on 14 October 2026 fails check 1 as the plan
|
||||
stands; Payap's rezoning (20 October 2026) would change that only once
|
||||
gazetted. Payap stays an option beside Mueang Chi.
|
||||
|
||||
### Payap scenario model (October 2026)
|
||||
|
||||
|
||||