Steam and cooling plant for the five-press fleet; utilities re-based
Deploy test site / deploy (push) Successful in 44s

New page docs/steam-cooling.html (site /demos/steam-cooling/): the
utility plant as a clickable process diagram. Steam side: raw water,
softener and dosing, feed tank with heat-pump feedwater recovery, feed
pumps, a bank of two 500 kg/h boilers (third for N+1 as an option),
separator and metering, optional accumulator, blowdown, the 10 bar
header with a valved, metered branch and trap per press, drip legs and
condensate return. Cooling side: Newbilt's press outlets are open (max.
2 bar), so returns drain to a warm tank, pass the heat pump, an optional
dry cooler and a plate heat exchanger to a cold buffer tank, and VFD
pumps feed the 20 to 25 C header at ~10 bar to every press, the
extruders and the central hydraulic oil cooler; the chiller loop
(three 250 kW air-cooled modules at 40 C ambient, fourth as option) stays
closed and clean. Galvanics cooling (12 to 20 C) is a separate circuit.
Operating cases (launch, Duplex system 1, five presses, one module down)
show demand against installed capacity; design basis with sources,
equipment schedule, RFQ questions. Static SVG, no per-frame work.

Design basis at Newbilt's per-machine figures: steam 750 to 900 kg/h,
cooling 652.5 kW (625 presses, 15 extruders, 12.5 hydraulics), 305 to
540 l/min circulating. Also found: Newbilt's 53 l/min at ~60 C out is
~140 kW, above its 125 kW peak; listed as a re-quote question.

Re-based in the same commit:
- scale.md: electrical table (chiller bank ~210 to 325 kW electrical,
  plant peak ~430 to 700 kW, ~950 to 1,330 kW with electric steam),
  grid 800 to 1,000 kVA (1,250 to 1,600 with electric steam, Schedule
  4 past 1,000 kW), tariff 4.5M to 6.8M THB/yr, battery ~1 h of chiller
  peak, boiler and chiller banks, biomass up to ~550 t/yr at 1.5 M
  records, utilities money line.
- sustainability.md, biomass.md: same figures; electric steam 5.2M to
  6.0M THB/yr mature, 1.6M to 1.8M early; fuel saving 4.0M to 5.4M.
- utilities CSV: boiler bank, chiller bank with HX and tanks, softener
  and loop treatment re-sized; baseline 23.98M-41.63M -> 30.07M-51.33M.
- total-investment.md: re-size as an added-scope row (+185k / +294k
  USD); headline 4.7M to 8.9M unchanged until the investment re-base.
- pressing-line, equipment-suppliers, facility-security, fleet
  calculator (boiler 1000 kg/h, chiller 750 kW), plant page detail
  texts; README, landing page, build.sh.
This commit is contained in:
grabowski committed 2026-10-14 09:58:27 +07:00
1 parent 9b03e4de07
commit 7af5d89dd0
14 files changed
+499 -100

No files matched your search

+1
View File
@@ -20,6 +20,7 @@ cp -R site/public/. "$out/"
DEMOS=(
"docs/plant-operation.html demos/plant-operation/index.html"
"docs/fleet-calculator.html demos/fleet-calculator/index.html"
"docs/steam-cooling.html demos/steam-cooling/index.html"
)
for entry in "${DEMOS[@]}"; do
read -r src dst <<<"$entry"
+10
View File
@@ -93,6 +93,16 @@ document.documentElement.setAttribute("data-theme",t);})();
link.</span>
</a>
</li>
<li>
<a href="demos/steam-cooling/">
<strong>Steam and cooling plant</strong>
<span>The utilities for the five-press fleet as a clickable process
diagram: boiler bank, steam header and condensate return, chiller
bank, plate heat exchanger and a branch to every press. Switch
between the launch press, the full fleet and one module down to see
demand against installed capacity.</span>
</a>
</li>
</ul>
<footer>Built from <code>site/</code> in the cnx_vinyl repository.</footer>