Steam and cooling plant for the five-press fleet; utilities re-based
Deploy test site / deploy (push) Successful in 44s
Deploy test site / deploy (push) Successful in 44s
New page docs/steam-cooling.html (site /demos/steam-cooling/): the utility plant as a clickable process diagram. Steam side: raw water, softener and dosing, feed tank with heat-pump feedwater recovery, feed pumps, a bank of two 500 kg/h boilers (third for N+1 as an option), separator and metering, optional accumulator, blowdown, the 10 bar header with a valved, metered branch and trap per press, drip legs and condensate return. Cooling side: Newbilt's press outlets are open (max. 2 bar), so returns drain to a warm tank, pass the heat pump, an optional dry cooler and a plate heat exchanger to a cold buffer tank, and VFD pumps feed the 20 to 25 C header at ~10 bar to every press, the extruders and the central hydraulic oil cooler; the chiller loop (three 250 kW air-cooled modules at 40 C ambient, fourth as option) stays closed and clean. Galvanics cooling (12 to 20 C) is a separate circuit. Operating cases (launch, Duplex system 1, five presses, one module down) show demand against installed capacity; design basis with sources, equipment schedule, RFQ questions. Static SVG, no per-frame work. Design basis at Newbilt's per-machine figures: steam 750 to 900 kg/h, cooling 652.5 kW (625 presses, 15 extruders, 12.5 hydraulics), 305 to 540 l/min circulating. Also found: Newbilt's 53 l/min at ~60 C out is ~140 kW, above its 125 kW peak; listed as a re-quote question. Re-based in the same commit: - scale.md: electrical table (chiller bank ~210 to 325 kW electrical, plant peak ~430 to 700 kW, ~950 to 1,330 kW with electric steam), grid 800 to 1,000 kVA (1,250 to 1,600 with electric steam, Schedule 4 past 1,000 kW), tariff 4.5M to 6.8M THB/yr, battery ~1 h of chiller peak, boiler and chiller banks, biomass up to ~550 t/yr at 1.5 M records, utilities money line. - sustainability.md, biomass.md: same figures; electric steam 5.2M to 6.0M THB/yr mature, 1.6M to 1.8M early; fuel saving 4.0M to 5.4M. - utilities CSV: boiler bank, chiller bank with HX and tanks, softener and loop treatment re-sized; baseline 23.98M-41.63M -> 30.07M-51.33M. - total-investment.md: re-size as an added-scope row (+185k / +294k USD); headline 4.7M to 8.9M unchanged until the investment re-base. - pressing-line, equipment-suppliers, facility-security, fleet calculator (boiler 1000 kg/h, chiller 750 kW), plant page detail texts; README, landing page, build.sh.
This commit is contained in:
1 parent
9b03e4de07
commit
7af5d89dd0
14 files changed
+499
-100
No files matched your search
@@ -78,14 +78,17 @@ automated candidate). What it means:
|
||||
two shifts, the range the [revenue model](../finance/revenue-model.md)
|
||||
uses: four semi-automatic presses at 60 to 80 records an hour (estimate)
|
||||
and the Classic at ~128 an hour (28 s cycle, vendor figure).
|
||||
- **Utilities do not scale from the old figures.** At Newbilt's per-press
|
||||
figures (steam 150 to 180 kg/h, cooling up to 125 kW per press), five
|
||||
presses draw ~750 to 900 kg/h of steam and up to ~625 kW of cooling,
|
||||
against the ~400 kg/h steam generator and ~250 kW cooling system that the
|
||||
2024 quote's exclusions describe for one Duplex. The boiler, chiller,
|
||||
electrical connection and [utilities CSV](../finance/utilities-investment.csv)
|
||||
are **not yet re-sized** for this fleet; that waits for the re-quote's
|
||||
figures ([scale](../scale.md)).
|
||||
- **Utilities, re-based for this fleet (October 2026).** At Newbilt's
|
||||
per-machine figures (steam 150 to 180 kg/h, cooling up to 125 kW per
|
||||
press) the five presses draw ~750 to 900 kg/h of steam and up to ~650 kW
|
||||
of cooling with extruders and hydraulics, against the ~400 kg/h steam
|
||||
generator and ~250 kW cooling system that the 2024 quote's exclusions
|
||||
describe for one Duplex. The proposal is a bank of two 500 kg/h boilers
|
||||
and three 250 kW chillers, one module per press stage; the layout, the
|
||||
operating cases and the open RFQ questions are in
|
||||
[steam and cooling](../steam-cooling.html), the electrical consequences in
|
||||
[scale](../scale.md) and the costs in the
|
||||
[utilities CSV](../finance/utilities-investment.csv).
|
||||
- **Investment**: the fleet change is carried in the added-scope table of
|
||||
[total investment](../finance/total-investment.md) until the next
|
||||
re-base.
|
||||
|
||||