Sibert follow-up: USD 250k budget, current VS specs, OMS as galvanics option
Deploy test site / deploy (push) Successful in 41s
Deploy test site / deploy (push) Successful in 41s
Ian Locke's email of 5 October 2026 after Making Vinyl Europe: - Budget of USD 250k for VSP, VSF and VSC confirmed; his time, spares, shipping and travel extra; itemised quotation on request. The total-investment block keeps its estimate until the re-base, the difference (+190k low case / +80k high case) goes into the not-yet-rolled-up table. - Current specifications filed (VSF and VSC 2022, VSP 2023) plus the VSF/VSP/VSC line-up drawing (4958 x 833 mm); the 2021 issues move to sibert/specs-2021/. VSC is now 1000 kg with split OD hydraulic / ID pneumatic forming; VSF 0-30 psi, 4-station head. Crane table, supplier map, vendor landscape and the plant page details updated. - Fully automatic VSPa exists; Sibert offers to move features to the VSP. - Electroforming: OMS (Optical Media Services, Lou Wullms) named next to Pheenix; added as a third galvanics candidate with open questions. - Sequencing advice (presses, boilers, operators and live feedback loops first) recorded in the exhibitor briefing, roadmap item 23, and as digital-factory design decision 9 (operators see the data first).
This commit is contained in:
1 parent
b672c58e34
commit
6888abe602
17 files changed
+208
-62
No files matched your search
@@ -20,7 +20,7 @@ July 2026; the underlying THB estimates are unchanged, because EUR/THB at
|
||||
| 2 automated presses (Pheenix AD12) | 580k – 920k | 19.1M – 30.5M | unverified ~USD 340k/press indicative + delivery and commissioning |
|
||||
| Galvanics line (Digital Matrix or Pheenix Alpha) | 320k – 650k | 10.7M – 21.4M | six-figure-USD turnkey inference from vendor research; the Pheenix range (2024 flyers, [galvanics and stamper prep](../equipment/galvanics.md)) is unpriced too |
|
||||
| Zero-discharge water treatment (ZLD) | 90k – 240k | 3.0M – 8.0M | utilities CSV option row |
|
||||
| Stamper prep (Sibert VSP, VSF, VSC) | 60k – 170k | 1.9M – 5.7M | estimate, pricing unpublished (2021 specifications on file) |
|
||||
| Stamper prep (Sibert VSP, VSF, VSC) | 60k – 170k | 1.9M – 5.7M | estimate kept until the re-base; Sibert has since confirmed USD 250k for the three (its time, spares, shipping and travel extra), the difference is in the table below |
|
||||
| Mastering and cutting room (Agnew or Sillitoe lathe system, cutter amps, console, room treatment) | 290k – 580k | 9.6M – 19.1M | estimate, bespoke market; the Sillitoe SDMS lists at USD 125k for lathe, head, amplifier and automation (ex tax, shipping), which makes the low end reachable; band kept until both quotes exist |
|
||||
| Metrology and QC stack (confocal, profiler, XRF, inline vision, audio station) | 350k – 810k | 11.5M – 26.7M | estimate, phaseable |
|
||||
| Utilities, solar, HVAC, racking baseline | 730k – 1,270k | 24.0M – 41.6M | reviewed [utilities CSV](utilities-investment.csv), THB-native |
|
||||
@@ -35,9 +35,9 @@ July 2026; the underlying THB estimates are unchanged, because EUR/THB at
|
||||
|
||||
### Added scope, not yet in the roll-up
|
||||
|
||||
Decided after the roll-up above was compiled; carried here as estimates
|
||||
until the next re-base folds them into the blocks (the building and
|
||||
software lines, and the contingency on top).
|
||||
Decided, or re-priced by a vendor, after the roll-up above was compiled;
|
||||
carried here until the next re-base folds them into the blocks (the
|
||||
building, software and stamper prep lines, and the contingency on top).
|
||||
|
||||
| Block | USD | THB | Basis |
|
||||
|---|---|---|---|
|
||||
@@ -46,7 +46,8 @@ software lines, and the contingency on top).
|
||||
| Visitor corridor and accessible entrance | 67k – 148k | 2.2M – 4.9M | estimate, same |
|
||||
| Artist platform, public side (calculator, campaigns, payments) | 40k – 90k | 1.3M – 3.0M | estimate, [artist platform](../artist-platform.md) |
|
||||
| PVC material lab, day-one tier (incl. plaque press and sample conditioning) | 55k – 150k | 1.8M – 5.0M | estimate, [quality automation](../quality-automation.md); not costed in the metrology block above. The mature tier (torque rheometer, DSC, FTIR, ~120k – 240k) is deferred, with partner labs in between |
|
||||
| **Added so far** | **~290k – 690k** | **~9.5M – 22.9M** | about 7 to 9% on the full-vision subtotal |
|
||||
| Stamper prep re-priced: USD 250k for VSP, VSF and VSC against the 60k – 170k block above | +190k (low case) / +80k (high case) | +6.3M / +2.6M | Sibert's budget confirmation, email of 5 October 2026 ([galvanics and stamper prep](../equipment/galvanics.md)); itemised quotation to follow. Its time, spare parts, shipping and travel are extra and fall into the freight/installation and spares blocks above |
|
||||
| **Added so far** | **~480k – 770k** | **~15.8M – 25.5M** | about 10 to 12% on the full-vision subtotal |
|
||||
|
||||
## Phased entry
|
||||
|
||||
|
||||