Supplier: LPI Rack Range (Thailand), racking and mobile shelving
Added at the user's request (October 2026): LPI Rack Range (Thailand) Corp., Ltd., Bangkok head office, plants in Bangplee Industrial Estate and Bangpla (Samut Prakan); office mobile shelving for documents, pallet racking (selective, drive-in, mobile, shuttle, pallet flow), picking shelves and mezzanines, mould-and-die racking, mini-load AS/RS; no specs or prices published (lpi.co.th, checked October 2026). equipment-suppliers.md section 8 entry; the Thai supplier the archive shelving is quoted against (facility-security.md open points, supplier map archive line); racking candidate in the utilities CSV.
This commit is contained in:
1 parent
4f02d9a7a9
commit
655d5705c4
3 files changed
+19
-5
No files matched your search
@@ -10,7 +10,7 @@ water,Boiler feedwater duplex softener,~1.0-1.2 m3/h feedwater duty (five-press
|
||||
water,RO skid (option),0.5-1 m3/h low-TDS feed,Veolia; Hydrotek; local integrators,200000,500000,market estimate,Only if low-TDS feed needed; NOT included in baseline total
|
||||
water,Closed-loop cooling water treatment,Side-stream filtration + dosing + conductivity blowdown control,Veolia; Hydrotek; local integrators,200000,500000,engineering estimate,"Sized for the five-press loop with its open return tank (Newbilt press outlets are open, max. 2 bar); chemicals are ongoing opex on top"
|
||||
water,Galvanics ZLD evaporator (future),"Small MVR or low-temp vacuum evaporator for plating rinse, installed","Core unit imported (WTEYA, Greenlan, Fred); Thai integration via Veolia or Hydrotek",3000000,8000000,market estimate,"For the future galvanics line, zero-discharge requirement; NOT included in baseline total"
|
||||
storage,Pallet racking and shelving,"100-200 pallet positions selective/heavy-duty (beams sized 1000-1500 kg/pallet, records are dense) + archive and finished-goods shelving, installed","Jenbunjerd; local fabricators (Sahawatthanakit, UPR, SD Shelf); SSI Schaefer (premium)",800000,1500000,published list prices + engineering estimate,SSI Schaefer premium tier ~1.5-3M for same scope; ~1000-2000 THB per pallet position at local tier
|
||||
storage,Pallet racking and shelving,"100-200 pallet positions selective/heavy-duty (beams sized 1000-1500 kg/pallet, records are dense) + archive and finished-goods shelving, installed","Jenbunjerd; LPI Rack Range (Thailand), Bangkok/Samut Prakan, racking and office mobile shelving; local fabricators (Sahawatthanakit, UPR, SD Shelf); SSI Schaefer (premium)",800000,1500000,published list prices + engineering estimate,SSI Schaefer premium tier ~1.5-3M for same scope; ~1000-2000 THB per pallet position at local tier
|
||||
hvac,Whole-factory HVAC,"~1500 m2 at 20-26 C, 35-60% RH, ePM1/F7-F9 filtration sized for burning-season PM2.5, ducting and controls","Daikin Thailand; Trane; Mitsubishi Electric; Carrier; filtration: Camfil Thailand, AAF",7500000,15000000,engineering estimate at 5000-10000 THB/m2,"RH low end of 35% is aggressive for tropics and drives desiccant cost; if 45-60% RH acceptable, cost drops materially"
|
||||
hvac,Clean-room-grade zone adder,"Cutting room + galvanics clean room, ~2 x 60 m2, ISO 7/8 with HEPA terminals, positive pressure, airlocks",Same HVAC vendors + clean-room contractors; Camfil HEPA,1200000,3400000,engineering estimate at 10000-28000 THB/m2 adder,Applied only to the two tight zones
|
||||
solar,PV rooftop EPC (illustrative 300 kWp),"Turnkey C&I rooftop EPC incl. Deye hybrid inverters, at 25000-35000 THB/kWp",Solar Nicolo (Deye tier-1 distributor); Banpu NEXT; SCG Cleanergy; Sermsang; local Chiang Mai installers,7500000,10500000,market rate per kWp; size illustrative,"Final kWp open until site selection; PEA TOU 3.2.2 plus Ft (Sep-Dec 2026): self-consumed PV worth ~3.7 THB/kWh, ~4.5-7 yr payback (sustainability.md, grid tariff)"
|
||||
|
||||
|