Inline QC station: concept setup on an aluminium profile frame
User, 18 Oct 2026: create a setup for the inline optical QC, an aluminium extrusion frame with all sensors and a conveyor mounted to it. - docs/equipment/inline-qc-station/: FreeCAD script (build_station.py) and model (.FCStd) of one station, 1.9 x 0.65 x 1.5 m on 27 m of 40x40 and 3.8 m of 40x80 profile: rim-belt conveyor (two 6 mm PU round belts under the unrecorded rim, open centre), label gate with top and bottom colour cameras on the fly, inspection position with a lift and rotate chuck (75 mm lift, expanding mandrel, belt-driven servo), top and bottom 4k line-scans on opposite radii with coaxial, dark-field and backlights, two warp lasers, optional thermal camera, light-tight black tunnel with door switch, rodless-cylinder reject pusher with chute and bin, outfeed stop, cabinet, PLC, NixOS edge PC, HMI, stack light. - render_station.py renders six views (open and closed iso, front, plan, inspection detail and elevation via clipped temporary documents). - inline-qc-station-bom.csv: 32 lines with sources; USD 16k to 33k per station without the thermal camera. - inline-optical-qc.md: new section "The station setup" (flow table, inspection zone, cycle ~5 to 6 s, control, BOM by group, open points); cost table updated (two launch stations ~USD 50k to 105k, still inside the metrology launch tier); Duplex/Classic flow now via the conveyor. - README bullet and tree.
This commit is contained in:
1 parent
5207808b57
commit
609424b598
12 files changed
+676
-15
No files matched your search
@@ -19,8 +19,11 @@ parts:
|
||||
- a servo turntable with a centring chuck;
|
||||
- an edge PC running open-source vision software on NixOS.
|
||||
|
||||
The hardware costs about USD 12k to 30k per station (estimate). The launch
|
||||
plant needs two stations, one for the Duplex cell and one for the Classic.
|
||||
The hardware costs about USD 16k to 33k per station (bill of materials,
|
||||
partly estimates). The launch plant needs two stations, one for the Duplex
|
||||
cell and one for the Classic. A concept model of the station, an aluminium
|
||||
profile frame with a rim-belt conveyor and all sensors mounted to it, is
|
||||
in [the station setup](#the-station-setup-frame-conveyor-and-sensors).
|
||||
|
||||
## What the station has to catch
|
||||
|
||||
@@ -133,22 +136,160 @@ each cell needs no conveyor and catches a non-fill streak within a cycle
|
||||
or two. The calculator's iso view draws a conveyor to one optical
|
||||
station; that drawing is schematic.
|
||||
|
||||
## The station setup: frame, conveyor and sensors
|
||||
|
||||
A concept model of one station, drawn in FreeCAD from the script
|
||||
[`build_station.py`](inline-qc-station/build_station.py) (views from
|
||||
[`render_station.py`](inline-qc-station/render_station.py); model file
|
||||
[`inline-qc-station.FCStd`](inline-qc-station/inline-qc-station.FCStd)).
|
||||
It is a layout to take to a machine builder, not a fabrication drawing:
|
||||
the profiles are drawn as plain 40 mm bars and the bought parts as their
|
||||
outline boxes.
|
||||
|
||||

|
||||
|
||||
*Records run from the infeed (back left, a translucent red special on
|
||||
the belts) through the light-tight tunnel to the reject pusher and the
|
||||
outfeed stop (front right). The cabinet sits under the outfeed, the
|
||||
reject bin behind it.*
|
||||
|
||||
**Frame.** The frame is built from 40 × 40 mm 8-slot aluminium profile
|
||||
(27 m in 37 pieces) on two 40 × 80 mm base beams, with eight levelling
|
||||
feet. It is 1.9 m long, 0.65 m wide and 1.5 m high, plus the stack
|
||||
light. The reject bin adds 0.4 m behind it. Records travel at 900 mm,
|
||||
a normal working height.
|
||||
|
||||
The middle 0.8 m is a tunnel closed with black panels on all sides
|
||||
(4.3 m²), because the line-scans need their own light only. The front
|
||||
panel is a door with a safety switch. The records enter and leave
|
||||
through low slots in the end walls. The reject zone has a clear polycarbonate guard.
|
||||
All camera and light brackets clamp into the slots, so heights and angles
|
||||
can be moved during the lighting trials.
|
||||
|
||||
**Conveyor.** Two 6 mm PU round belts run under the record's rim, 148.5 mm
|
||||
from the centre line. That is outside the recorded area: a 12" record is
|
||||
301.6 mm across and its grooves end at 292.6 mm at most (IEC 98, as
|
||||
[tabulated here](http://www7a.biglobe.ne.jp/~yosh/standards_table.htm)).
|
||||
The belt therefore touches only the raised edge that records are made to
|
||||
stand on, never a groove. The centre stays open, so cameras and the chuck
|
||||
can reach the record from below.
|
||||
|
||||
The belts run on UHMW slide strips and are driven by one shaft at the
|
||||
outfeed end. Side guides with a flared mouth centre the record at the
|
||||
infeed. Supported on two rim lines, a warm 180 g record sags about 1 mm
|
||||
in the middle (beam estimate); the trials should confirm that this does
|
||||
no harm. For 10" and 7" records the belt spacing moves in on a slide;
|
||||
the model shows the 12" setting.
|
||||
|
||||
| Station | Position from the infeed end | What happens |
|
||||
|---|---|---|
|
||||
| Infeed | 200 mm | the operator (Duplex) or the unloader (Classic) puts the record down; a presence sensor starts the cycle |
|
||||
| Label gate | 520 mm | both colour cameras flash the labels on the fly through the open centre (exposure about 20 µs, under 10 µm blur at 0.5 m/s); the top camera also reads the dead-wax code that ties the record to its stamper, and so to its press and cycle (readability to test, as in [digital factory](../digital-factory.md)) |
|
||||
| Inspection | 880 mm | a through-beam on the leading edge stops the belts; the chuck lifts the record 75 mm off them (the pad waits below the belt plane), expands the mandrel in the 7.24 mm hole and turns it once in about 1 s |
|
||||
| Reject | 1,320 mm | a pneumatic rodless cylinder on a bridge pushes a reject sideways by its edge onto a felt-lined chute at the back and into the bin |
|
||||
| Outfeed | 1,715 mm | good records wait at a soft end stop; the station holds the next one while the outfeed is full |
|
||||
|
||||

|
||||
|
||||

|
||||
|
||||
**Inspection zone.** The record is shown lifted on the chuck. The two
|
||||
line-scans look at opposite radii along the conveyor axis, because no
|
||||
belt crosses that line:
|
||||
|
||||
- **Top camera:** reads the downstream radius, from 50 to 155 mm, from
|
||||
330 mm above. A coaxial line light sits under it, two dark-field line
|
||||
lights sit at 20° either side, and a diffuse backlight below the
|
||||
record gives transmitted light for clear colours.
|
||||
- **Bottom camera:** reads the upstream radius from below with the same
|
||||
set of lights.
|
||||
- **Bottom dark-field lights:** these sit outside the record's footprint,
|
||||
above the rails, so the conveyed record passes them. They light the
|
||||
underside at about 8°, true dark-field.
|
||||
- **Warp lasers:** two lasers under the record trace circles at 90 and
|
||||
130 mm radius during the turn.
|
||||
- **Spindle drive:** the spindle servo's encoder clocks both line-scans
|
||||
and the lasers.
|
||||
- **Lift drive:** the lift is a guided pneumatic cylinder, and the
|
||||
spindle is belt-driven from a servo set to the side. That keeps the
|
||||
bottom camera's view cone clear, which the elevation shows.
|
||||
- **Thermal camera (option):** hangs at the tunnel entry.
|
||||
|
||||
**Cycle per record (estimate).**
|
||||
|
||||
| Step | Time |
|
||||
|---|---|
|
||||
| Convey to the inspection position | 1.5 to 2.5 s |
|
||||
| Lift and clamp | 0.5 s |
|
||||
| One turn, with run-up and stop | 1.3 s |
|
||||
| Lower | 0.3 s |
|
||||
| Convey out, with a push if rejected | 1 to 2 s |
|
||||
| **Total** | **about 5 to 6 s** |
|
||||
|
||||
A Duplex cell delivers a record every 15 to 20 s and the Classic one
|
||||
every 28 s. The PC finishes the verdict while the record is lowered and
|
||||
carried to the pusher.
|
||||
|
||||
**Control.** A small PLC (Mitsubishi FX5U or Delta class, both common in
|
||||
Thailand) runs the conveyor, lift, mandrel, spindle and pusher, plus the
|
||||
safety circuit (e-stop, door switch, safety relay). The NixOS edge PC
|
||||
under the outfeed takes the four GigE cameras on PoE, the lasers and the
|
||||
light controllers. It sends pass or fail with a reason to the PLC, and
|
||||
the result string and images to the factory system (see
|
||||
[digital factory](../digital-factory.md)). Utilities are 230 V single
|
||||
phase at about 1 kW and 6 bar compressed air (estimates).
|
||||
|
||||

|
||||
|
||||

|
||||
|
||||

|
||||
|
||||
**Bill of materials.** The line-by-line list with sources is in
|
||||
[`inline-qc-station-bom.csv`](inline-qc-station/inline-qc-station-bom.csv).
|
||||
By group, per station:
|
||||
|
||||
| Group | USD | Main parts |
|
||||
|---|---|---|
|
||||
| Frame | 0.7k to 1.5k | 27 m of 40 × 40, 3.8 m of 40 × 80, brackets, feet |
|
||||
| Enclosure and guards | 0.3k to 0.7k | black panels, polycarbonate, door switch |
|
||||
| Conveyor | 0.5k to 1.4k | round belts, pulleys, slide strips, drive |
|
||||
| Handling | 2.0k to 4.9k | guided lift cylinder, 200 W spindle servo, spindle head with mandrel, rodless cylinder, pneumatics |
|
||||
| Vision | 7.7k to 12.5k | 2 line-scans, 2 colour cameras, lenses, 2 coaxial, 4 dark-field and 2 backlights, 2 ring lights, controllers |
|
||||
| Sensors | 1.3k to 4.0k | 2 laser distance sensors, presence and stop sensors |
|
||||
| Control | 3.5k to 7.8k | PLC, edge PC with GPU, HMI, safety, cabinet and wiring |
|
||||
| **Total** | **16k to 33k (0.53M to 1.08M THB)** | thermal camera (USD 2.1k to 3.0k) not included |
|
||||
|
||||
**Open points for the machine builder.**
|
||||
|
||||
1. **Sag:** confirm that the rim-only support does not mark or bend warm
|
||||
records.
|
||||
2. **Static:** fresh PVC attracts dust, so an ionising bar at the infeed
|
||||
may be needed. Otherwise the station counts dust it attracted itself.
|
||||
3. **Classic hand-off:** where and how the Classic's unloader sets the
|
||||
record down.
|
||||
4. **Belt width:** a quick-change spacing for 10" and 7" records.
|
||||
5. **Space in the cell:** check that the 1.9 m length fits the 5 × 3 m
|
||||
Duplex cell next to the trimmer.
|
||||
|
||||
## Where it sits
|
||||
|
||||
- **Duplex cell.** The station sits after the edge trimmer, in front of
|
||||
the operator, before the spindle. The flow per record:
|
||||
1. The operator puts the record on the chuck.
|
||||
2. A presence sensor starts the scan.
|
||||
3. A stack light shows green or red.
|
||||
4. A reject goes into a bin, and a small screen shows the reason.
|
||||
1. The operator puts the trimmed record on the infeed conveyor.
|
||||
2. A presence sensor starts the cycle.
|
||||
3. A stack light and the HMI show green or red.
|
||||
4. A reject is pushed into a bin, and the HMI shows the reason; a good
|
||||
record waits at the outfeed for the spindle.
|
||||
|
||||
The operator still sees every record, so the visual check stays as it
|
||||
is today.
|
||||
- **Classic.** The Classic unloads by itself onto the spindle stack. Ask
|
||||
Newbilt whether the unload handling can set the record on an inspection
|
||||
chuck first, or hand it over to a small pick-and-place unit by I/O. If
|
||||
neither works, use a fixed area camera over the unload position. That
|
||||
covers surface and label, and leaves warp and eccentricity to samples.
|
||||
Newbilt whether the unload handling can set the record down on the
|
||||
station's infeed instead; a conveyor takes a record dropped within a few
|
||||
millimetres, which is easier than hitting a chuck. If that does not
|
||||
work, use a fixed area camera over the unload position. That covers
|
||||
surface and label, and leaves warp and eccentricity to samples.
|
||||
- **Warm records.** Records leave the press warm and settle in the stack;
|
||||
24 hours of cooling is the usual practice
|
||||
([Stamper Discs](https://stamperdiscs.com/horns-and-quality-issues-in-vinyl-record-pressing)).
|
||||
@@ -197,11 +338,11 @@ simulated.
|
||||
|
||||
| Item | Estimate |
|
||||
|---|---|
|
||||
| Hardware per station, from the table above | USD 12k to 30k |
|
||||
| First station: mechanics, lighting trials, software, training data | 2 to 4 person-months, USD 15k to 40k (our own team with a local machine builder) |
|
||||
| Launch plant: two stations, Duplex cell and Classic | about USD 40k to 100k (1.3M to 3.3M THB) |
|
||||
| Hardware per station, from the [bill of materials](inline-qc-station/inline-qc-station-bom.csv) | USD 16k to 33k (0.53M to 1.08M THB) |
|
||||
| First station: frame build and machined parts, lighting trials, software, training data | 2 to 4 person-months, USD 15k to 40k (our own team with a local machine builder) |
|
||||
| Launch plant: two stations, Duplex cell and Classic | about USD 50k to 105k (1.6M to 3.5M THB) |
|
||||
|
||||
All three figures are estimates. They fit inside the existing metrology
|
||||
All three figures are estimates; the bill of materials names a source for each priced line. They fit inside the existing metrology
|
||||
launch-tier line, USD 170k to 460k for XRF, inline vision and the audio
|
||||
station ([total investment](../finance/total-investment.md)). The plan
|
||||
prices therefore do not change. That line has no published split, so the
|
||||
|
||||