ERPNext is the only system of record; we build tools on it
Deploy test site / deploy (push) Successful in 46s
Deploy test site / deploy (push) Successful in 46s
User (October 2026): we only build tools and interfaces that interact with ERPNext; invoices, stock and the rest are kept there, except telemetry and other machine data. digital-factory.md: standing decision, decisions 2, 3, 6, 7 and 10 rewritten (ERPNext holds every record of the business and of production, including artist gates, metal-part genealogy as serial numbers with parents, and quality inspections; the machine-data store keeps only cycle and record rows, the hash chain and time series, keyed to ERPNext names; ERPNext first, then custom fields or document types in cnx_erp, then a tool, never a second business database). Systems table, architecture labels, factory application section (modules as a table: records in ERPNext, what we build, machine data outside; our only tables are the machine-data ones), ownership table, integration rules 4 and 8, phasing and estimates (cnx_erp app 2 to 3 person-months; total 3.5 to 6). artist-platform.md: campaigns are an ERPNext document from launch, pledges post as advance payment entries; traceability, README, facility security (archive location on the serial number), production timeline (sets per mother on the mother's serial number), crane-workshop spares store, total-investment. Factory console: KPI row no longer touches the postings card (user screenshot); ERPNext page, order card, sidenote and ledger say every record lives in ERPNext and only machine data stays outside; new postings for artist gates, stamper metrology inspections, stamper set serial numbers (grown, retired with play count). Checked headless: Edge dark and light, 1440/1024/390, no overflow or page errors, rows aligned, pw_fc, pw_wo, pw_feed and pw_erp pass.
This commit is contained in:
1 parent
a101c9f7db
commit
5c303dfc61
9 files changed
+188
-158
No files matched your search
+14
-10
@@ -348,8 +348,8 @@ approves the test pressing; a photo or short video of it to the fans is
|
||||
cheap marketing), the run, packaging, and **dropshipping one parcel per
|
||||
fan** with tracking, which is fulfillment step 9 as already planned.
|
||||
|
||||
Fans follow it on the campaign page, fed from the factory application's
|
||||
event log: the progress is the plant's own record, not a status someone
|
||||
Fans follow it on the campaign page, fed from the order's records in
|
||||
ERPNext and the plant's event log: the progress is the plant's own record, not a status someone
|
||||
remembers to update. If a stage slips, the estimated ship month moves
|
||||
and every fan is told.
|
||||
|
||||
@@ -421,20 +421,24 @@ No SaaS beyond the payment provider (Opn/Omise, 2C2P or a bank gateway,
|
||||
to be chosen), in line with the plan's standing rule that every plant
|
||||
service runs on the NixOS fleet.
|
||||
|
||||
**ERPNext** (decided October 2026: the plant runs ERPNext, and every tool
|
||||
we build interacts with it; [digital factory](digital-factory.md#erpnext-the-plants-erp)).
|
||||
For the platform that means:
|
||||
**ERPNext** (decided October 2026: the plant runs ERPNext as its only
|
||||
system of record, and what we build are tools and interfaces on it;
|
||||
[digital factory](digital-factory.md#erpnext-the-plants-erp)). The
|
||||
platform keeps no business records of its own. For the platform that
|
||||
means:
|
||||
|
||||
- the **price list** behind the calculator is an ERPNext price list
|
||||
(the demos' `R` list is its prototype), synced out to the public
|
||||
process, so the calculator and the invoice never disagree;
|
||||
- an artist or label account is linked to one ERPNext **customer**; a
|
||||
direct order becomes a **sales order** when it is confirmed;
|
||||
- a **campaign** stays in the public process while it runs; when it
|
||||
succeeds it becomes a sales order, the pledges become **payment
|
||||
entries** against it in the ring-fenced account, and fan shipments
|
||||
become delivery notes; the refunds of a missed campaign are posted the
|
||||
same way;
|
||||
- a **campaign** is a custom Campaign document in ERPNext from launch;
|
||||
each pledge is posted as an advance **payment entry** into the
|
||||
ring-fenced account as it arrives, with the fan as a customer; when the
|
||||
campaign succeeds it becomes a sales order the advances are allocated
|
||||
to, and fan shipments become delivery notes; the refunds of a missed
|
||||
campaign are posted as payment entries too. The public process holds
|
||||
sessions and a cache of what it shows, nothing else;
|
||||
- every posting goes through the plant's integration layer and its
|
||||
outbox over the mesh; the public side never talks to ERPNext directly.
|
||||
|
||||
|
||||
Reference in new issue
Block a user