Add energy efficiency architecture: heat recovery before generation
Press cooling return (60 C) feeds heat pump into boiler feedwater; waste heat runs label oven and HVAC dehumid reheat; solar thermal preheat; steam accumulator; boiler does only the final lift. Heat pumps for the final 180 C steam and ground-source in tropical Thailand both ruled out with reasoning; northern Thailand LPG tank context documented
This commit is contained in:
1 parent
6648eb00b2
commit
5184014a2d
1 file changed
+47
@@ -42,6 +42,53 @@ at 10 bar / 180 °C) and the 250 kW cooling system.
|
|||||||
- System sizing (kWp, storage, grid-connection model) is open until the site
|
- System sizing (kWp, storage, grid-connection model) is open until the site
|
||||||
is chosen.
|
is chosen.
|
||||||
|
|
||||||
|
### Energy efficiency architecture: recover before generating
|
||||||
|
|
||||||
|
The deepest efficiency in this plant comes from its own thermodynamics: the
|
||||||
|
steam's job is to heat the molds, and the cooling water's job is to remove
|
||||||
|
that same heat again, so roughly 98% of the 250 kW cooling load is heat
|
||||||
|
leaving the press molds, put there almost entirely by the steam, and the
|
||||||
|
press cooling return exits at ~60 °C. That
|
||||||
|
warm return is a premium heat source, and the architecture is built around
|
||||||
|
reusing it before generating anything new:
|
||||||
|
|
||||||
|
- **Feedwater heat recovery**: a water-to-water heat pump lifts the 60 °C
|
||||||
|
press cooling return into boiler feedwater at 90 to 95 °C. Each kWh it
|
||||||
|
consumes does double duty: it cuts the boiler's work and removes load from
|
||||||
|
the chiller at the same time. Together with condensate return, this saves
|
||||||
|
roughly 10 to 15% of steam energy while shrinking the cooling system.
|
||||||
|
- **Waste heat for low-grade consumers**: the label dry oven and HVAC
|
||||||
|
dehumidification reheat (the 35 to 60% RH spec means air is cooled below
|
||||||
|
dew point and reheated continuously) run on recovered press heat instead
|
||||||
|
of fresh electricity.
|
||||||
|
- **Solar thermal feedwater preheat**: flat-plate or evacuated-tube
|
||||||
|
collectors reach 60 to 90 °C trivially in the Thai sun; cheap, proven, and
|
||||||
|
stackable with the heat pump recovery.
|
||||||
|
- **Steam accumulator**: the presses draw steam in bursts, so an accumulator
|
||||||
|
(already a Newbilt option) lets a smaller boiler ride the peaks.
|
||||||
|
- **The boiler only does the final lift**: whichever technology is chosen
|
||||||
|
(electric, LPG, or biomass), it supplies just the last step to 180 °C /
|
||||||
|
10 bar from already-hot feedwater.
|
||||||
|
|
||||||
|
Two honest exclusions, checked and ruled out:
|
||||||
|
|
||||||
|
- **Heat pumps cannot make the final steam**: commercial steam-generating
|
||||||
|
heat pumps top out around 120 to 165 °C at lower pressures than the fixed
|
||||||
|
Newbilt spec of 10 bar / 180 °C; hybrid heat-pump-plus-compression systems
|
||||||
|
exist as industrial pilots, but core utility reliability is the wrong
|
||||||
|
place to pioneer.
|
||||||
|
- **Ground-source (earth temperature) does not work in tropical Thailand**:
|
||||||
|
the ground sits at 28 to 30 °C year-round, far too cold to be process heat
|
||||||
|
and warmer than the 20 to 25 °C cooling loop wants, so boreholes help
|
||||||
|
neither side. That budget is better spent on PV panels.
|
||||||
|
|
||||||
|
Fuel-side context for the boiler choice: there is no natural gas pipeline in
|
||||||
|
northern Thailand, so gas firing means an on-site bulk LPG tank (roughly 2.5
|
||||||
|
to 5 tonnes, with hazardous-storage separation distances and licensing), and
|
||||||
|
diesel means a fuel tank with price exposure. The electric and biomass paths
|
||||||
|
avoid a fossil tank on the property entirely, which matters for both the
|
||||||
|
sustainability commitments and the BOI story.
|
||||||
|
|
||||||
## Zero contaminated water
|
## Zero contaminated water
|
||||||
|
|
||||||
The reference process schematic shows a conventional open "dirty water"
|
The reference process schematic shows a conventional open "dirty water"
|
||||||
|
|||||||