Archive room: mobile shelving for the father and mother archive
Deploy test site / deploy (push) Successful in 43s

Planned (October 2026, user): the archive in the office gets mobile
archive shelving, A-Z Solutions (Vienna) as the reference
(a-z-solutions.eu, checked October 2026: hand wheel or electric drive,
lockable, rails need early floor planning; no published prices).

facility-security.md, new section under Protecting the irreplaceable:
what it holds (fathers and mothers, ~1,200 to 2,400 parts a year; a
reference pressing per title only as a proposal), sizing estimates (about
0.2 kg per part, ~3 mm and ~75 kg per shelf metre; in the Payap office's
~4 x 5.75 m room two fixed runs, four double carriages and one aisle hold
~150 shelf metres, ~50,000 parts, 20+ years), what it asks of the
building (ground slab at full rating, ~11 kN/m2 under the block; rails in
the screed fixed before the floor finish; geared hand wheel; gas,
climate, leak sensor, access control; barcoded box addresses), open
points (quotes from A-Z and a Thai supplier, storage format from the
galvanics vendors, fathers in a second compartment or off site).

Mirrors: site-candidates.md (office ground floor), phase 1 RFQ (archive
keeps the full slab rating if the slab is zoned), digital-factory.md
(archive location as box and shelf position, sets per mother),
equipment-suppliers.md (section 8 entry), total-investment.md added scope
(to quote, not in the sum).
This commit is contained in:
grabowski committed 2026-10-16 11:18:09 +07:00
1 parent 475623e9f2
commit 4f02d9a7a9
6 files changed
+93 -3

No files matched your search

+3 -1
View File
@@ -224,7 +224,9 @@ and every equipment envelope is an estimate.
- Ground floor, for staff and the studio: reception and lobby, a canteen
for about 40 with its kitchen, changing rooms for women and men with
four showers each, toilets, mastering and cutting with an inner
acoustic lining, the listening room and the archive. Staff change here
acoustic lining, the listening room and the archive (mobile shelving
on the ground slab, [facility security](facility-security.md#archive-room-mobile-shelving)).
Staff change here
before crossing to the factory, whose staff entry keeps only PPE and a
WC.
- First floor: the offices (~150 m²), a meeting and training room (the