Planned (October 2026, user): the archive in the office gets mobile archive shelving, A-Z Solutions (Vienna) as the reference (a-z-solutions.eu, checked October 2026: hand wheel or electric drive, lockable, rails need early floor planning; no published prices). facility-security.md, new section under Protecting the irreplaceable: what it holds (fathers and mothers, ~1,200 to 2,400 parts a year; a reference pressing per title only as a proposal), sizing estimates (about 0.2 kg per part, ~3 mm and ~75 kg per shelf metre; in the Payap office's ~4 x 5.75 m room two fixed runs, four double carriages and one aisle hold ~150 shelf metres, ~50,000 parts, 20+ years), what it asks of the building (ground slab at full rating, ~11 kN/m2 under the block; rails in the screed fixed before the floor finish; geared hand wheel; gas, climate, leak sensor, access control; barcoded box addresses), open points (quotes from A-Z and a Thai supplier, storage format from the galvanics vendors, fathers in a second compartment or off site). Mirrors: site-candidates.md (office ground floor), phase 1 RFQ (archive keeps the full slab rating if the slab is zoned), digital-factory.md (archive location as box and shelf position, sets per mother), equipment-suppliers.md (section 8 entry), total-investment.md added scope (to quote, not in the sum).
This commit is contained in:
1 parent
475623e9f2
commit
4f02d9a7a9
6 files changed
+93
-3
No files matched your search
@@ -31,7 +31,11 @@ stepping up from a light-duty slab adds only on the order of 100–200 THB/m².
|
||||
The real cost variable is the ground underneath (see soil, below). A later
|
||||
value-engineering option is to zone the slab — 30 kN/m² under press hall and
|
||||
warehouse only, lighter under offices, but for rough pricing the whole
|
||||
floor is specified at 30 so the number is conservative.
|
||||
floor is specified at 30 so the number is conservative. If it is zoned,
|
||||
the archive room keeps the full rating: it gets mobile shelving loaded
|
||||
with nickel parts, about 11 kN/m² under the shelving when full (estimate), and
|
||||
its rails go into the floor screed at fit-out
|
||||
([facility security](../facility-security.md#archive-room-mobile-shelving)).
|
||||
|
||||
### 1a. Panel core: where PIR is not enough
|
||||
|
||||
|
||||