Plan the artist platform: price calculator and fan-funded pressing
New docs/artist-platform.md: upload master and artwork with automatic audio, artwork and rights checks; an itemised price calculator for every customer (per-title vs per-copy lines, price-per-copy curve, lead time from the production-timeline quote table, versioned price list); and fan-funded campaigns that press and dropship per fan once the goal is reached, refund otherwise. Covers goal maths, payments (charge into a ring-fenced account, CNX as seller of record, legal opinion first; the Qrates failure as the design rule), repress pre-orders, architecture on the cnx-factory stack with the public side on a fleet machine, PDPA, phasing (calculator public early as a run-size probe, campaigns only after first releases ship), cost and open decisions. Backlinks from README, process flow, production timeline, revenue model, digital factory and roadmap items 1 and 20; total investment added-scope table gains the platform line.
This commit is contained in:
1 parent
917a3eb933
commit
4607a4da58
8 files changed
+411
-4
No files matched your search
@@ -381,6 +381,10 @@ effectively unavailable in Thailand. That floor exists because per-title
|
||||
cost — an imported stamper set plus outsourced mastering — is irreducible
|
||||
for them. In-house cutting and plating collapses it, which makes short
|
||||
runs viable for CNX in a way they structurally are not for ResurRec.
|
||||
The channel planned for that segment is the
|
||||
[artist platform](../artist-platform.md): a transparent price calculator
|
||||
and fan-funded campaigns that press only when enough fans have
|
||||
pre-ordered.
|
||||
|
||||
**What it does to the volume-versus-boutique question.** The model assumes
|
||||
1.0–1.5M records/yr across 300–600 titles, an average of 1,700–5,000 units
|
||||
|
||||
@@ -44,7 +44,8 @@ software lines, and the contingency on top).
|
||||
| Overhead crane, runway, frame premium, machine door | 97k – 227k | 3.2M – 7.5M | estimate, [crane, workshop and tours](../crane-workshop-tours.md) |
|
||||
| Maintenance workshop and machine bay fit-out | 30k – 76k | 1.0M – 2.5M | estimate, same |
|
||||
| Visitor corridor and accessible entrance | 67k – 148k | 2.2M – 4.9M | estimate, same |
|
||||
| **Added so far** | **~195k – 450k** | **~6.4M – 14.9M** | about 5 to 6% on the full-vision subtotal |
|
||||
| Artist platform, public side (calculator, campaigns, payments) | 40k – 90k | 1.3M – 3.0M | estimate, [artist platform](../artist-platform.md) |
|
||||
| **Added so far** | **~235k – 540k** | **~7.7M – 17.9M** | about 6 to 7% on the full-vision subtotal |
|
||||
|
||||
## Phased entry
|
||||
|
||||
|
||||