Payap model v2: bigger factory, shared plant room, separate water treatment
User, October 2026: the factory is too small and needs room to grow (possibly ten more Classics), one shared hydraulic and air supply, water treatment perhaps in a separate building connected to the galvanics lab, and a fully equipped workshop (maintenance tools, 3D printers, maybe a lathe and a small CNC mill). Model (rebuilt live in FreeCAD 26.3, BIM objects, Params-driven, parametric check plot 135->145 m and factory 112->120 m passed): - plot 135 m (11.4 rai) with a reserve; factory 112 x 25 m, 16 bays, 82 m visitor corridor, fire wall at 90 m; - press hall ~870 m2: two Duplex systems (EX 50 + EX 35), the Classic, ten future Classic positions in two rows on a service trench; - central hydraulics and compressed-air plant room (~62 m2); - water treatment building 12 x 10 m behind galvanics: buried duct (gravity from the +1.2 m floor), covered crossing 6 m clear; - workshop ~200 m2 with benches, tool cabinets, 3D printers, lathe, small CNC mill, drill, saw, welding bay, press, washer, measuring table. Docs: galvanics (water treatment building, proposed), crane doc (workshop fit-out; lathe and CNC mill not yet priced; corridor now 82 m), site-candidates Payap section rewritten, README bullet.
This commit is contained in:
1 parent
9e0c5d4045
commit
4263fbbd9b
7 files changed
+89
-40
No files matched your search
+54
-32
@@ -87,8 +87,8 @@ pharmaceutical facility on the offered land is to be confirmed.
|
||||
assessment.
|
||||
5. **Plot fit.** Shape and size against the 60 × 25 m building, the
|
||||
detached utility yard and the phase 2 footprint (6 to 8 rai). The
|
||||
Payap scenario model below fits the whole plant on a 110 m square
|
||||
(7.6 rai) as drawn.
|
||||
Payap scenario model below needs a 135 m square (11.4 rai) as drawn,
|
||||
with room for ten more Classics and a reserve.
|
||||
6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's
|
||||
written consent; the zero-discharge design
|
||||
([sustainability](sustainability.md)) becomes a lease condition, not
|
||||
@@ -114,26 +114,41 @@ parametric BIM model sites it on a simple square plot:
|
||||
[isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3
|
||||
from BIM walls, slabs, columns, spaces and equipment. Every size and
|
||||
position hangs off its `Params` spreadsheet (plot side, setbacks, floor
|
||||
level, building sizes, fire wall line, office gap), so the square can be
|
||||
swapped for the real plot once Payap names one. It is a layout sketch:
|
||||
every position and every equipment envelope is an estimate.
|
||||
level, building sizes, fire wall line, office and water treatment gaps),
|
||||
so the square can be swapped for the real plot once Payap names one. It
|
||||
is a layout sketch: every position and every equipment envelope is an
|
||||
estimate.
|
||||
|
||||
- **Plot**: 110 × 110 m (12,100 m², 7.6 rai, inside the 6 to 8 rai of
|
||||
[scale](scale.md)), road assumed on the south side, 6 m setbacks
|
||||
(placeholder).
|
||||
- **Factory, production floor only**: 84 × 25 m at floor level +1.2 m,
|
||||
in process order along a 54 m glazed visitor corridor. From west to
|
||||
east: staff entry and lockers; workshop and spares, with the machine
|
||||
door and a 12 m vehicle ramp at the north-west corner; galvanics clean
|
||||
room and water treatment; stamper prep, PVC lab and material area;
|
||||
compressed air and electrical; the press hall; trim and optical
|
||||
inspection, QC lab, and finishing and packaging. Behind the fire wall
|
||||
at 62 m are the warehouse and dispatch with two dock doors.
|
||||
- The press hall (465 m²) holds two Duplex systems, each two HRP 12
|
||||
presses with an EX 50 and an EX 35, and the Classic
|
||||
- **Plot**: 135 × 135 m (18,225 m², 11.4 rai), road assumed on the south
|
||||
side, 6 m setbacks (placeholder). That is more than the 6 to 8 rai of
|
||||
[scale](scale.md): the factory keeps room for ten more Classics, and the
|
||||
plot keeps a reserve in front for a second hall or a PV field.
|
||||
- **Factory, production floor only**: 112 × 25 m at floor level +1.2 m,
|
||||
16 frame bays, in process order along an 82 m glazed visitor corridor.
|
||||
From west to east: staff entry and lockers; workshop and spares, with
|
||||
the machine door and a 12 m vehicle ramp at the north-west corner;
|
||||
galvanics clean room with a chemical day store; stamper prep, PVC lab,
|
||||
material area and the electrical room; the press hall; trim and optical
|
||||
inspection, QC lab, and finishing and packaging. Behind the fire wall at
|
||||
90 m are the warehouse and dispatch with two dock doors.
|
||||
- The press hall (~870 m²) holds two Duplex systems, each two HRP 12
|
||||
presses with an EX 50 and an EX 35, the Classic, and **ten more
|
||||
Classic positions** in two rows
|
||||
([pressing line](equipment/pressing-line.md)).
|
||||
- The 5 t crane runs from the west wall to the fire wall
|
||||
- **One shared hydraulic and compressed-air supply**: a central plant
|
||||
room (~62 m²) at the west end of the press hall, and a service trench
|
||||
along the press rows for the hydraulic ring main, compressed air,
|
||||
steam and cooling water.
|
||||
- The workshop (~200 m²) is fully equipped, with 3D printers, a lathe
|
||||
and a small CNC mill among the tools
|
||||
([crane, workshop and tours](crane-workshop-tours.md)).
|
||||
- The 5 t crane runs from the west wall to the fire wall.
|
||||
- **Water treatment building**, separate, 12 × 10 m at ground level
|
||||
directly behind galvanics: zero-discharge effluent treatment, the DI
|
||||
water plant and the chemical store. A buried duct carries the effluent
|
||||
by gravity from the galvanics floor, and a covered crossing (6 m clear
|
||||
for trucks) joins the galvanics door
|
||||
([galvanics](equipment/galvanics.md)).
|
||||
- **Office building, isolated from the factory floor**: 24 × 15 m, single
|
||||
storey, 12 m south of the factory on its own slab and structure, joined
|
||||
by a covered link that lands at the start of the visitor corridor.
|
||||
@@ -142,26 +157,33 @@ every position and every equipment envelope is an estimate.
|
||||
an inner acoustic lining, the listening room, the IT and server room,
|
||||
the archive, and WC and kitchen.
|
||||
- The lathe sits away from press vibration and outside the crane zone.
|
||||
- **Utility yard** behind the press hall, across a 6 m service lane:
|
||||
- **Utility yard** behind the press hall, across a 6 m lane:
|
||||
- boiler house with chimney and a covered fuel store;
|
||||
- chiller and cooling tower;
|
||||
- process and fire water tanks;
|
||||
- PEA transformer;
|
||||
- a pipe bridge to the press hall.
|
||||
- a pipe bridge that drops into the service trench.
|
||||
|
||||
Boiler and chiller are drawn at the one-Duplex sizes and need
|
||||
re-sizing for five presses ([scale](scale.md)).
|
||||
- **Access**: one gate on the south side opens onto a truck apron in front
|
||||
of the dock doors, with the car park in front of the office and a
|
||||
service road round the east end to the yard and the ramp.
|
||||
- **Area**: about 2,100 m² of factory plus 360 m² of office, so ~2,460 m²
|
||||
under roof. That is above the 1,400 to 2,000 m² of the [scale](scale.md)
|
||||
zone table, which held one Duplex and an automated zone with the offices
|
||||
inside.
|
||||
- The press hall matches the new fleet.
|
||||
Boiler, chiller and transformer are drawn at the one-Duplex sizes. They
|
||||
need re-sizing for five presses, and again if the Classics are added
|
||||
([scale](scale.md)).
|
||||
- **Access**:
|
||||
- one gate on the south side opens onto a truck apron in front of the
|
||||
dock doors;
|
||||
- an access road runs along the south boundary to the car park, with
|
||||
a footpath to the office;
|
||||
- a lane behind the factory serves the yard, the water treatment
|
||||
building and the ramp. The low-loader's swept path at the ramp still
|
||||
needs checking.
|
||||
- **Area**: about 2,800 m² of factory, 360 m² of office and 120 m² of
|
||||
water treatment, so ~3,280 m² under roof plus the boiler house. That is
|
||||
well above the 1,400 to 2,000 m² of the [scale](scale.md) zone table,
|
||||
which held one Duplex and an automated zone with the offices inside.
|
||||
- Two thirds of the difference is the press hall with its expansion
|
||||
floor.
|
||||
- Warehouse and dispatch (~530 m²) are drawn above that table's 300 to
|
||||
500 m² for packaging and finished goods.
|
||||
|
||||
Both are estimates to settle against the real plot.
|
||||
All of it is an estimate to settle against the real plot.
|
||||
|
||||
The Mueang Chi model and everything sited on it stay as they are.
|
||||