Payap model v2: bigger factory, shared plant room, separate water treatment
User, October 2026: the factory is too small and needs room to grow (possibly ten more Classics), one shared hydraulic and air supply, water treatment perhaps in a separate building connected to the galvanics lab, and a fully equipped workshop (maintenance tools, 3D printers, maybe a lathe and a small CNC mill). Model (rebuilt live in FreeCAD 26.3, BIM objects, Params-driven, parametric check plot 135->145 m and factory 112->120 m passed): - plot 135 m (11.4 rai) with a reserve; factory 112 x 25 m, 16 bays, 82 m visitor corridor, fire wall at 90 m; - press hall ~870 m2: two Duplex systems (EX 50 + EX 35), the Classic, ten future Classic positions in two rows on a service trench; - central hydraulics and compressed-air plant room (~62 m2); - water treatment building 12 x 10 m behind galvanics: buried duct (gravity from the +1.2 m floor), covered crossing 6 m clear; - workshop ~200 m2 with benches, tool cabinets, 3D printers, lathe, small CNC mill, drill, saw, welding bay, press, washer, measuring table. Docs: galvanics (water treatment building, proposed), crane doc (workshop fit-out; lathe and CNC mill not yet priced; corridor now 82 m), site-candidates Payap section rewritten, README bullet.
This commit is contained in:
1 parent
9e0c5d4045
commit
4263fbbd9b
7 files changed
+89
-40
No files matched your search
@@ -130,10 +130,12 @@ The detail lives in dedicated documents:
|
||||
- [Payap scenario model](docs/cnx_vinyl_parametric_payap.png): a parametric
|
||||
BIM model in FreeCAD 26.3 (`docs/cnx_vinyl_parametric_payap.FCStd`,
|
||||
[isometric](docs/cnx_vinyl_parametric_payap-iso.png)) of the whole plant
|
||||
on a square placeholder plot of Payap land: an 84 x 25 m production-only
|
||||
factory with the five-press fleet, a separate office building for
|
||||
offices, mastering and IT, the utility yard and site access, all driven
|
||||
by one parameter sheet
|
||||
on a square placeholder plot of Payap land: a 112 x 25 m production-only
|
||||
factory with the five-press fleet, room for ten more Classics and one
|
||||
shared hydraulic and air plant, a separate office building for offices,
|
||||
mastering and IT, a separate water treatment building next to
|
||||
galvanics, the utility yard and site access, all driven by one
|
||||
parameter sheet
|
||||
- [Process logging and traceability](docs/traceability.md): end-to-end
|
||||
per-order traceability for customers, batch genealogy from audio file to
|
||||
shipment, and the requirements this sets for the factory software
|
||||
|
||||