Plan B re-defined: the launch plant with everything in (~210M THB); front view on the cover
Deploy test site / deploy (push) Successful in 52s
Deploy test site / deploy (push) Successful in 52s
- Plan B now starts like Plan A with one Duplex system and one Classic, but takes none of the six levers: owned solar and battery (with the BOI solar measure), the full metrology stack, the visitor corridor, cassette and CD-R, the bought crane and Thai-supplied utilities (user, 17 October 2026). ~193.8M THB before the reserve, ~209M with it (~150M to 268M), ~32M (~18 %) more than Plan A; the second Duplex is a growth step from revenue in both (~15.4M THB, estimate). - total-investment.md "Two plans" re-based (heading and anchor now "B at ~210M THB", README and roadmap links updated); revenue-model.md operating pictures: same volume and EBITDA as Plan A, depreciation on Plan B's capital (operating profit 1.26M USD central, payback ~3.7 yr); the extra earns nothing in the modelled table, which the docs say. - Calculator: Plan B preset = the launch plant with contingency kept out (EBITDA 2.07M USD, cash payback year ~4.3, IRR ~21 %); budget card marks 180M and 180M plus 25 %; preset label "Plan B (~210M, all in)". - Business plan draft 0.3, both versions rebuilt: every Plan B branch of the three content files rewritten; renders regenerated with the isometric view turned to the front of the site (road, car park, office, corridor facade) for the cover and Figures 8 to 10.
This commit is contained in:
1 parent
ffc6cedbca
commit
3f33babdaa
28 files changed
+528
-604
No files matched your search
@@ -1,6 +1,6 @@
|
||||
"""Part A: cover, reading guide, executive summary, opportunity, anatomy of the plant.
|
||||
|
||||
Builds Plan A (~180M THB) or Plan B (~225M THB): plan-specific text is switched with
|
||||
Builds Plan A (~180M THB) or Plan B (~210M THB): plan-specific text is switched with
|
||||
plan_variant.pick() inside blocks(), never at import time.
|
||||
"""
|
||||
from plan_lib import H1, H2, H3, P, B, N, T, KV, IMG, CALL, PB, TOC, COVER
|
||||
@@ -23,17 +23,18 @@ def blocks():
|
||||
"**Prepared by:** Simona Meesaiyati (Project Lead) and Alexander Grabowski (Technical Consultant), "
|
||||
"supported by buildfor.life, with Ploy Printing (Chiang Mai) as packaging partner and "
|
||||
"strategic co-investor",
|
||||
f"**Version:** Draft 0.3, October 2026: **{name()}, {pick('~180M THB', '~225M THB')}**",
|
||||
f"**Version:** Draft 0.3, October 2026: **{name()}, {pick('~180M THB', '~210M THB')}**",
|
||||
],
|
||||
note="Confidential. All figures in USD and THB at 1 USD = 33 THB (August 2026). Vendor quotes are "
|
||||
"snapshots at their file dates, not commitments. Every number in this plan is labelled as quoted, "
|
||||
"researched, or estimated; see section 2. " + pick(
|
||||
"This version is Plan A: the launch plant with the whole chain, cutting and galvanics "
|
||||
"included, three presses, brought to ~180M THB (~177M) with six cost levers. A second "
|
||||
"version, Plan B (~225M THB), launches with five presses and takes none of the levers. ",
|
||||
"This version is Plan B: the whole chain, cutting and galvanics included, with five presses "
|
||||
"at launch and everything in, at ~225M THB (~224M). A second version, Plan A (~180M THB), "
|
||||
"launches with three presses and six cost levers. ")
|
||||
"version, Plan B (~210M THB), builds the same plant and takes none of the levers. ",
|
||||
"This version is Plan B: the launch plant with the whole chain, cutting and galvanics "
|
||||
"included, three presses, with everything in and none of the cost levers taken, at ~210M "
|
||||
"THB (~209M). A second version, Plan A (~180M THB), builds the same plant with six cost "
|
||||
"levers. ")
|
||||
+ "The plan price includes the ramp-up reserve and carries no contingency. Cover picture: the "
|
||||
"plant as the plant and business plan calculator draws this plan (schematic, Payap scenario "
|
||||
"layout, section 6.2). Draft 0.3 replaces "
|
||||
@@ -62,7 +63,7 @@ def blocks():
|
||||
"sequence. There are no bridge stampers and no outsourced cutting in the plan any more. Draft 0.3 "
|
||||
"prices that plant in **two versions**, both including the ramp-up reserve and neither carrying a "
|
||||
"contingency: **Plan A (~180M THB)**, the launch plant's three presses with six cost levers, and "
|
||||
"**Plan B (~225M THB)**, five presses with everything in. " + pick(
|
||||
"**Plan B (~210M THB)**, the same three presses with everything in. " + pick(
|
||||
"**This document is Plan A**, and every section below is written for it; a short table after "
|
||||
"the numbers compares the two versions.",
|
||||
"**This document is Plan B**, and every section below is written for it; a short table after "
|
||||
@@ -72,21 +73,13 @@ def blocks():
|
||||
"**The complete vinyl chain under one roof:** mastering, lacquer cutting, galvanics (growing the "
|
||||
"nickel stampers), stamper preparation, pressing, finishing, packaging with our Chiang Mai print "
|
||||
"partner Ploy Printing, and fulfilment including direct-to-fan dropshipping.",
|
||||
pick(
|
||||
"**Three presses at launch:** one Newbilt Duplex system (two semi-automatic presses with a main "
|
||||
"and a colour extruder, for colour, splatter and short runs) and one Newbilt Classic fully "
|
||||
"automatic press for long standard runs. Special prints are the focus (60 % and more of the "
|
||||
"records), and specials run only on the Duplex, so together they make about 0.58 to 0.90 "
|
||||
"million records a year on two shifts (0.71 to 0.97 million at a standard-heavy mix; "
|
||||
"estimates). A second Duplex system is a growth step from revenue, with its floor, utility "
|
||||
"positions and pipe connections reserved, not part of the investment.",
|
||||
"**Five presses at launch:** two Newbilt Duplex systems (each two semi-automatic presses with a "
|
||||
"main and a colour extruder, for colour, splatter and short runs) and one Newbilt Classic fully "
|
||||
"automatic press for long standard runs. Special prints are the focus (60 % and more of the "
|
||||
"records) and run only on the Duplex systems; with four semi-automatic presses they no longer "
|
||||
"set the pace, so the five presses make about 1.0 to 1.5 million records a year on two shifts "
|
||||
"(1.25 million in the central case; estimates). The press hall keeps room for more Duplex "
|
||||
"systems and Classics as an option, not part of the investment."),
|
||||
"**Three presses at launch:** one Newbilt Duplex system (two semi-automatic presses with a main "
|
||||
"and a colour extruder, for colour, splatter and short runs) and one Newbilt Classic fully "
|
||||
"automatic press for long standard runs. Special prints are the focus (60 % and more of the "
|
||||
"records), and specials run only on the Duplex, so together they make about 0.58 to 0.90 "
|
||||
"million records a year on two shifts (0.71 to 0.97 million at a standard-heavy mix; "
|
||||
"estimates). A second Duplex system is a growth step from revenue, with its floor, utility "
|
||||
"positions and pipe connections reserved, not part of the investment.",
|
||||
"**The metal path in-house:** a Sillitoe SDMS cutting room, a Pheenix Alpha galvanics line with "
|
||||
"zero-discharge water treatment, and the Sibert stamper-prep line. The father and the mother of "
|
||||
"every side are archived, so represses start from our own metal.",
|
||||
@@ -94,7 +87,8 @@ def blocks():
|
||||
"each, with " + pick(
|
||||
"two 500 kg/h boiler modules (B-1, B-2, bought through the Chinese route) and two 250 kW "
|
||||
"chiller modules (CH-1, CH-2)",
|
||||
"two 500 kg/h boiler modules (B-1, B-2) and three 250 kW chiller modules (CH-1 to CH-3)")
|
||||
"two 500 kg/h boiler modules (B-1, B-2, from Thai suppliers) and two 250 kW chiller modules "
|
||||
"(CH-1, CH-2)")
|
||||
+ " installed at launch; further presses add modules, not rooms. The steam fuel (electric or "
|
||||
"biomass) is still open.",
|
||||
pick("**Cassette duplication and CD-R duplication as a growth step** after launch, not in the "
|
||||
@@ -109,7 +103,8 @@ def blocks():
|
||||
+ " and room for a second building.",
|
||||
"**Commissioned in sequence:** the cutting room and galvanics first (the presses need their "
|
||||
"stampers), then " + pick("the Duplex system, then the Classic",
|
||||
"Duplex system 1, then the Classic, then Duplex system 2")
|
||||
"the Duplex system, then the Classic, with cassette and CD-R "
|
||||
"duplication alongside")
|
||||
+ ". That puts galvanics, the hardest skill to "
|
||||
"hire, on the path to the first paying release. Sibert, the stamper-prep supplier in the plan, "
|
||||
"advised after the Haarlem trade show to get presses, boilers, operators and feedback loops "
|
||||
@@ -125,10 +120,14 @@ def blocks():
|
||||
"with frame, runway and machine door kept crane-ready; boilers and compressor through the "
|
||||
"Chinese route. Every press, the cutting room, the galvanics line and the stamper-prep line "
|
||||
"stay in.",
|
||||
"**Everything in, no cost levers:** owned rooftop solar and battery (and with them the BOI "
|
||||
"solar measure), the full metrology stack from launch, the visitor corridor and public tours "
|
||||
"from the start, a bought overhead crane, cassette and CD-R duplication, and Thai-supplied "
|
||||
"boilers and compressor."),
|
||||
"**Everything in, none of the cost levers: ~210M THB**, ~194M THB at the midpoint before the "
|
||||
"ramp-up reserve and ~32M THB more than Plan A (estimates, section 8): owned rooftop solar and "
|
||||
"battery (and with them the BOI solar measure); the full metrology stack from launch (XRF, "
|
||||
"laser confocal, wide-area profiler, inline vision, audio station); the visitor corridor and "
|
||||
"accessible entrance, so public tours and the Payap student programmes are possible from the "
|
||||
"start; cassette and CD-R duplication; a bought 5 t overhead crane; boilers and compressor "
|
||||
"from Thai suppliers, with local service. Every press, the cutting room, the galvanics line "
|
||||
"and the stamper-prep line are the same as in Plan A."),
|
||||
]),
|
||||
H2("What makes it top-notch"),
|
||||
P("Four things separate this plant from a pressing shop, and they are the reason it can charge "
|
||||
@@ -178,10 +177,10 @@ def blocks():
|
||||
"~0.58M to 0.90M records/yr at 60 % specials (2 semi-automatic presses + 1 Classic, 2 shifts; "
|
||||
"the Duplex sets the pace; estimate; the press fleet calculator gives ~0.94M at our planning "
|
||||
"rates). Second Duplex as a growth step from revenue: ~1.0M to 1.5M",
|
||||
"~1.0M to 1.5M records/yr at 60 % specials, central case 1.25M (4 semi-automatic presses + 1 "
|
||||
"Classic, 2 shifts; the four semi-automatic presses carry the specials, so the Duplex does not "
|
||||
"set the pace; estimate; the press fleet calculator gives ~1.5M at our planning rates). Full "
|
||||
"hall as a later option: ~2.9M to 4.4M")],
|
||||
"~0.58M to 0.90M records/yr at 60 % specials, central 0.74M (2 semi-automatic presses + 1 "
|
||||
"Classic, 2 shifts; the Duplex sets the pace; estimate; the press fleet calculator gives ~0.94M "
|
||||
"at our planning rates). Second Duplex as a growth step from revenue (section 4.4); full hall "
|
||||
"as a later option: ~2.9M to 4.4M")],
|
||||
["Site", "~1,500 m² main building plus a ~379 m² utility yard built for four boiler and four "
|
||||
"chiller modules, on leased land (~4 rai minimum, 6 to 8 rai with expansion); second "
|
||||
"building as expansion"],
|
||||
@@ -191,13 +190,14 @@ def blocks():
|
||||
"(staff and overheads before volume covers them). From the low to the high end of every "
|
||||
"block: ~THB 127M to 226M. Estimates: no quote yet for the Classic, the galvanics line "
|
||||
"(priced at OMS's reference plus 20 %) or the building",
|
||||
"**~THB 224M (~USD 6.79M), rounded to ~225M THB**: the plan investment, ~THB 209.2M (~USD "
|
||||
"6.34M) at the midpoint with everything in, plus a ramp-up reserve of ~THB 10M to 20M (staff "
|
||||
"and overheads before volume covers them). From the low to the high end of every block: ~THB "
|
||||
"162M to 286M. Estimates: no quote yet for the Classic, the galvanics line (priced at OMS's "
|
||||
"reference plus 20 %), the EX 35 or the building")],
|
||||
"**~THB 209M (~USD 6.33M), rounded to ~210M THB**: the plan investment, ~THB 193.8M (~USD "
|
||||
"5.87M) at the midpoint with everything in, plus a ramp-up reserve of ~THB 10M to 20M (staff "
|
||||
"and overheads before volume covers them); at the midpoint within the investor's 180M THB "
|
||||
"plus 20 %. From the low to the high end of every block: ~THB 150M to 268M. Estimates: no "
|
||||
"quote yet for the Classic, the galvanics line (priced at OMS's reference plus 20 %) or the "
|
||||
"building")],
|
||||
["Not in the plan price", "**No contingency** (at the 15 % used in the cost documents, ~THB "
|
||||
+ pick("24M", "31M") + " at the midpoint): quotes that land high are "
|
||||
+ pick("24M", "29M") + " at the midpoint): quotes that land high are "
|
||||
"funded outside the plan or by scope steps (section 8). Also not in "
|
||||
"it: the central hydraulic plant (not yet costed), the archive's mobile "
|
||||
"shelving (to quote), CD replication, financing costs, currency moves, "
|
||||
@@ -212,76 +212,75 @@ def blocks():
|
||||
"presses make 0.58M at that rate. The solar PPA's power price (~USD 0.03M a year in the "
|
||||
"calculator) is not in these figures. Utilisation and price decide the outcome, not upside "
|
||||
"(section 9)",
|
||||
"Central case at 60 % specials: revenue ~USD 6.05M (~THB 200M), EBITDA ~USD 3.14M (~THB "
|
||||
"104M), operating profit ~USD 2.63M (~THB 87M); break-even on operating profit at ~0.22M "
|
||||
"records a year. **The adverse case only just covers depreciation:** EBITDA ~USD 0.83M, "
|
||||
"operating profit ~USD 0.02M. **All of it needs the records to sell:** ~1.25M a year in the "
|
||||
"central case, ~0.75M of them specials, and no market evidence shows that demand yet. "
|
||||
"Central case at 60 % specials: revenue ~USD 3.65M (~THB 120M), EBITDA ~USD 1.73M (~THB "
|
||||
"57M), operating profit ~USD 1.26M (~THB 42M); break-even on operating profit at ~0.23M "
|
||||
"records a year. **The adverse case loses money:** EBITDA ~USD 0.23M, operating loss ~USD "
|
||||
"0.52M (~THB 17M); it would need ~1.1M records a year to cover depreciation and the three "
|
||||
"presses make 0.58M at that rate. Cassette, CD-R and tour revenue are not in these figures. "
|
||||
"Utilisation and price decide the outcome, not upside (section 9)")],
|
||||
["Payback", pick(
|
||||
"~3.1 years on the plan price in the central case (2.2 to 4.0 from the low to the high end of "
|
||||
"the price); ~1.0 year in the favourable case, ~30 years in the adverse case (EBITDA, mature "
|
||||
"year, ramp-up reserve included; estimates)",
|
||||
"~2.2 years on the plan price in the central case (1.6 to 2.8 from the low to the high end of "
|
||||
"the price); ~0.8 year in the favourable case, ~10.5 years in the adverse case (EBITDA, mature "
|
||||
"~3.7 years on the plan price in the central case (2.6 to 4.7 from the low to the high end of "
|
||||
"the price); ~1.2 years in the favourable case, ~35 years in the adverse case (EBITDA, mature "
|
||||
"year, ramp-up reserve included; estimates)")],
|
||||
["First paying release", "**Open.** The August 2026 calendar gives Q4 2028 to mid-2029 (27 to 33 "
|
||||
"months from the start of phase 0), but it was drawn for a one-press "
|
||||
"launch. Commissioning the cutting room and galvanics before the presses "
|
||||
"is not yet in it, and the lathe, galvanics line and stamper-prep build "
|
||||
"times are not on file, so the date stays open until those vendors "
|
||||
"quote." + pick("", " Plan B commissions its second Duplex system last, "
|
||||
"after the Classic.")
|
||||
+ " Ordering machinery before the BOI certificate, if allowed, could "
|
||||
"quote. Ordering machinery before the BOI certificate, if allowed, could "
|
||||
"still pull it forward by 6 to 9 months (section 10)"],
|
||||
["People", pick(
|
||||
"~15 to 25 across shifts at volume (estimate); the launch plant needs most of that "
|
||||
"crew, because two shifts still need press, finishing, galvanics, QC and maintenance "
|
||||
"staff (13 to 19 direct production staff in the revenue model)",
|
||||
"~15 to 25 across shifts at volume (estimate); two shifts need press, finishing, galvanics, QC "
|
||||
"and maintenance staff whether the plant runs three presses or five, so Plan B's five presses "
|
||||
"run on the same direct crews (13 to 19 direct production staff in the revenue model) and "
|
||||
"spread them over more records")],
|
||||
["People", "~15 to 25 across shifts at volume (estimate); the launch plant needs most of that "
|
||||
"crew, because two shifts still need press, finishing, galvanics, QC and maintenance "
|
||||
"staff (13 to 19 direct production staff in the revenue model)"],
|
||||
["The ask", pick(
|
||||
"~THB 177M (~USD 5.35M), the ~180M THB plan, released in tranches against milestones "
|
||||
"(section 8), starting with phase 0 (~THB 1.3M to 2.6M). BOI caps debt-to-equity at 3:1, so "
|
||||
"at least a quarter is equity: ~THB 44M (arithmetic, before financing costs)",
|
||||
"~THB 224M (~USD 6.79M), the ~225M THB plan, released in tranches against milestones "
|
||||
"~THB 209M (~USD 6.33M), the ~210M THB plan, released in tranches against milestones "
|
||||
"(section 8), starting with phase 0 (~THB 1.3M to 2.6M). BOI caps debt-to-equity at 3:1, so "
|
||||
"at least a quarter is equity: ~THB 56M (arithmetic, before financing costs)")],
|
||||
"at least a quarter is equity: ~THB 52M (arithmetic, before financing costs)")],
|
||||
]),
|
||||
H2("Two versions of this plan"),
|
||||
P("This plan comes in two versions, built from the same documents and the same machine choices. " + pick(
|
||||
"This document is **Plan A**. The other version, **Plan B (~225M THB)**, puts the second Duplex "
|
||||
"system in at launch, for five presses, and takes none of the six levers. ",
|
||||
"This document is **Plan B**. The other version, **Plan A (~180M THB)**, launches with three "
|
||||
"presses (one Duplex system and the Classic), takes six cost levers and keeps the second Duplex "
|
||||
"as a growth step from revenue. ")
|
||||
+ "Both carry the ramp-up reserve and neither carries a contingency. What decides between them is "
|
||||
"demand: Plan B's central case needs about 70 % more records sold than Plan A's (1.25 against 0.74 "
|
||||
"million a year), and the market validation gate (section 3.2) is the evidence for that. Section 8 "
|
||||
"sets the two side by side."),
|
||||
"This document is **Plan A**. The other version, **Plan B (~210M THB)**, builds the same three "
|
||||
"presses and takes none of the six levers. ",
|
||||
"This document is **Plan B**. The other version, **Plan A (~180M THB)**, builds the same three "
|
||||
"presses (one Duplex system and the Classic) and takes six cost levers. ")
|
||||
+ "Both carry the ramp-up reserve and neither carries a contingency, and in both the second Duplex "
|
||||
"system is a growth step from revenue. What decides between them is no longer demand, because both "
|
||||
"make the same records: it is whether the investor funds ~THB 32M (~18 %) more at launch for what "
|
||||
"Plan A leases or buys from revenue. Plan B keeps the BOI solar measure (only an owned array "
|
||||
"qualifies), measures every stamper fully from the first release, makes tours and the Payap "
|
||||
"programmes possible from the start, sells cassette and CD-R from launch, owns its crane and buys "
|
||||
"its utilities with local service. On the modelled numbers that extra earns nothing (the same "
|
||||
"EBITDA, more depreciation, a longer payback, a deeper adverse case), so Plan A has the better "
|
||||
"modelled return and Plan B the more complete plant. Most of Plan B's items can be added to Plan A "
|
||||
"later from revenue; the BOI solar measure and the corridor are cheaper to have from the start. "
|
||||
"Section 8 sets the two side by side."),
|
||||
T(["", "Plan A", "Plan B"], [
|
||||
["Plan price (ramp-up reserve in, no contingency)", "~THB 177M (~USD 5.35M); ~127M to 226M from "
|
||||
"the low to the high end", "~THB 224M (~USD 6.79M); ~162M to 286M from the low to the high end"],
|
||||
["Presses", "3: one Duplex system (2 semi-automatic) and one Classic",
|
||||
"5: two Duplex systems (4 semi-automatic) and one Classic"],
|
||||
["Records a year at 60 % specials", "~0.58M to 0.90M (central 0.74M)",
|
||||
"~1.0M to 1.5M (central 1.25M)"],
|
||||
["EBITDA, central case", "~USD 1.73M (~THB 57M)", "~USD 3.14M (~THB 104M)"],
|
||||
["Operating profit, central case", "~USD 1.34M (~THB 44M)", "~USD 2.63M (~THB 87M)"],
|
||||
["Payback on the plan price, central case", "~3.1 years (2.2 to 4.0)", "~2.2 years (1.6 to 2.8)"],
|
||||
"the low to the high end", "~THB 209M (~USD 6.33M); ~150M to 268M from the low to the high end"],
|
||||
["Presses", "3: one Duplex system (2 semi-automatic) and one Classic", "The same 3"],
|
||||
["Records a year at 60 % specials", "~0.58M to 0.90M (central 0.74M)", "The same"],
|
||||
["EBITDA, central case", "~USD 1.73M (~THB 57M)", "~USD 1.73M (~THB 57M); cassette and CD-R "
|
||||
"not modelled"],
|
||||
["Operating profit, central case", "~USD 1.34M (~THB 44M)", "~USD 1.26M (~THB 42M)"],
|
||||
["Payback on the plan price, central case", "~3.1 years (2.2 to 4.0)", "~3.7 years (2.6 to 4.7)"],
|
||||
["Adverse case", "Loses money: EBITDA ~USD 0.23M, operating loss ~USD 0.39M",
|
||||
"Just covers depreciation: EBITDA ~USD 0.83M, operating profit ~USD 0.02M"],
|
||||
["What Plan A gives up, what Plan B needs", "At launch: solar through a PPA (very likely without "
|
||||
"Loses money: EBITDA ~USD 0.23M, operating loss ~USD 0.52M"],
|
||||
["What Plan A gives up, what Plan B buys", "At launch: solar through a PPA (very likely without "
|
||||
"the BOI solar measure), no confocal or profiler, no visitor corridor or tours, no cassette or "
|
||||
"CD-R, a rented crane; Chinese-made boilers and compressor",
|
||||
"~1.25M records sold a year, ~0.75M of them specials, against 0.74M for Plan A; no market "
|
||||
"evidence of that demand yet"],
|
||||
"~THB 32M more at launch: owned solar and battery with the BOI solar measure, the full "
|
||||
"metrology stack, the visitor corridor and tours, cassette and CD-R, a bought crane; "
|
||||
"Thai-supplied boilers and compressor"],
|
||||
], widths_mm=[42, 64, 64], font_pt=8.5,
|
||||
caption="Estimates: mature year at 60 % specials, from the revenue model; payback counted on the "
|
||||
"whole plan price including the reserve. Central EBITDA margins of ~47 % (A) and ~52 % (B) "
|
||||
"are far above the 15 to 25 % pressing plants earn; read the adverse case as the honest one."),
|
||||
"whole plan price including the reserve. A central EBITDA margin of ~47 % (both plans) is "
|
||||
"far above the 15 to 25 % pressing plants earn; read the adverse case as the honest one."),
|
||||
H2("Where we are, and what we ask"),
|
||||
P("The project is at the planning stage. Industry outreach has run for several years. Alexander and "
|
||||
"Simona attended **Making Vinyl Europe in Haarlem** (30 September to 2 October 2026): most people "
|
||||
@@ -308,7 +307,7 @@ def blocks():
|
||||
"the Newbilt re-quote for the Duplex system (with an EX 35 price) and the Classic, a Pheenix "
|
||||
"quote for the galvanics line, the building price request with the soil test, metrology "
|
||||
"distributor quotes and a solar PPA offer.",
|
||||
"the Newbilt re-quote for both Duplex systems (with an EX 35 price) and the Classic, a Pheenix "
|
||||
"the Newbilt re-quote for the Duplex system (with an EX 35 price) and the Classic, a Pheenix "
|
||||
"quote for the galvanics line, the building price request with the soil test, and metrology "
|
||||
"distributor quotes."),
|
||||
pick(
|
||||
@@ -318,17 +317,18 @@ def blocks():
|
||||
"boiler and chiller modules), building contract, fit-out, commissioning in sequence "
|
||||
"(section 8). From the low to the high end of every block the plan runs from ~THB 127M to "
|
||||
"226M; quotes that land high are funded outside the plan or by scope steps.",
|
||||
"**Then the Plan B round, ~THB 224M (~USD 6.79M), rounded to ~225M THB**, including the "
|
||||
"ramp-up reserve and without contingency, released in tranches against milestones: BOI "
|
||||
"certificate and lease signed, long-lead orders (lathe, galvanics, stamper prep, both Duplex "
|
||||
"systems and the Classic, boiler and chiller modules), building contract, fit-out, "
|
||||
"commissioning in sequence (section 8). From the low to the high end of every block the plan "
|
||||
"runs from ~THB 162M to 286M; quotes that land high are funded outside the plan or by scope "
|
||||
"steps."),
|
||||
"**Decisions needed from the investor:** which version to fund, Plan A or Plan B (demand decides "
|
||||
"first, from market validation; then the Classic, Pheenix and EX 35 quotes, the solar PPA offer "
|
||||
"and the building quote); the equity/debt mix (BOI requires debt-to-equity of at most 3:1, so at "
|
||||
"least ~THB " + pick("44M of Plan A's ~177M", "56M of Plan B's ~224M") + " is equity); CD "
|
||||
"**Then the Plan B round, ~THB 209M (~USD 6.33M), rounded to ~210M THB**, including the "
|
||||
"ramp-up reserve and without contingency, within the investor's 180M THB plus 20 % at the "
|
||||
"midpoint, released in tranches against milestones: BOI certificate and lease signed, "
|
||||
"long-lead orders (lathe, galvanics, stamper prep, presses, boiler and chiller modules), "
|
||||
"building contract, fit-out, commissioning in sequence (section 8). From the low to the high "
|
||||
"end of every block the plan runs from ~THB 150M to 268M; quotes that land high are funded "
|
||||
"outside the plan or by scope steps."),
|
||||
"**Decisions needed from the investor:** which version to fund, Plan A or Plan B (both make the "
|
||||
"same records, so the choice is ~THB 32M more at launch for what Plan A leases or defers; the "
|
||||
"Classic, Pheenix and EX 35 quotes, the solar PPA offer and the building quote settle the "
|
||||
"numbers); the equity/debt mix (BOI requires debt-to-equity of at most 3:1, so at "
|
||||
"least ~THB " + pick("44M of Plan A's ~177M", "52M of Plan B's ~209M") + " is equity); CD "
|
||||
"replication, yes or no (it must be in the BOI application from the start); and the steam fuel, "
|
||||
"electric or biomass.",
|
||||
"**Co-investment:** Ploy Printing, the Chiang Mai print and packaging house that will produce "
|
||||
@@ -340,10 +340,10 @@ def blocks():
|
||||
H1("2. How to read the numbers"),
|
||||
P("**Two versions.** This business plan comes in two versions, built from the same documents: "
|
||||
"**Plan A (~180M THB)**, the launch plant's three presses with six cost levers, and **Plan B "
|
||||
"(~225M THB)**, five presses with everything in. Both plan prices include the ramp-up reserve and "
|
||||
"neither carries a contingency. This document is **" + label() + "**. Chapters that do not depend "
|
||||
"on the choice read the same in both; where the plans differ, this version gives its own figures, "
|
||||
"and sections 1 and 8 compare the two."),
|
||||
"(~210M THB)**, the same three presses with everything in. Both plan prices include the ramp-up "
|
||||
"reserve and neither carries a contingency. This document is **" + label() + "**. Chapters that "
|
||||
"do not depend on the choice read the same in both; where the plans differ, this version gives "
|
||||
"its own figures, and sections 1 and 8 compare the two."),
|
||||
P("Every figure in this plan carries one of three confidence levels. Where a table does not say, "
|
||||
"the basis column or caption does."),
|
||||
T(["Label", "Meaning", "Examples"], [
|
||||
@@ -394,9 +394,7 @@ def blocks():
|
||||
"is the gap. It is also the plan's biggest assumption: that enough regional customers will pay for "
|
||||
"a closer, faster, more accountable plant at a price that works. That pricing power is unproven. "
|
||||
"The Haarlem trade show produced strong supplier interest but no buyer prices, and the market "
|
||||
"validation gate exists to test it before capital is committed." + pick(
|
||||
"", " Plan B makes the assumption heavier: its central case sells ~1.25 million records a year, "
|
||||
"~0.75 million of them special editions, against 0.74 million for the three-press Plan A.")),
|
||||
"validation gate exists to test it before capital is committed."),
|
||||
H2("3.3 What the market shows: two price points"),
|
||||
P("Two sets of real prices now exist: invoices from the one Thai pressing shop we have seen, and the "
|
||||
"published calculator of a European plant. Neither is used to re-base the financial model, which "
|
||||
@@ -420,12 +418,9 @@ def blocks():
|
||||
P("What the tour showed: the shop operates from a small non-industrial premises; it does not plate "
|
||||
"(stampers are bought in from abroad and resold); there is no temperature, humidity or particulate "
|
||||
"control on the pressing floor; and it runs two Newbilt presses, a Classic fully automatic and one "
|
||||
"semi-automatic, about 190 to 210 records an hour at nameplate. That is a real capital fleet. " + pick(
|
||||
"Our launch plant's three presses (248 to 288 records an hour at nameplate, planned for two "
|
||||
"shifts) ",
|
||||
"Plan B's five presses (four semi-automatic at 60 to 80 records an hour each plus the Classic at "
|
||||
"~128, 368 to 448 records an hour at nameplate, planned for two shifts) ")
|
||||
+ "out-press it on paper, which the one-press launch of draft 0.1 did not. Neither figure is "
|
||||
"semi-automatic, about 190 to 210 records an hour at nameplate. That is a real capital fleet. "
|
||||
"Our launch plant's three presses (248 to 288 records an hour at nameplate, planned for two "
|
||||
"shifts) out-press it on paper, which the one-press launch of draft 0.1 did not. Neither figure is "
|
||||
"measured output: their shifts and order book were not observed."),
|
||||
H3("A European plant: Record Industry's calculator"),
|
||||
P("Record Industry (Haarlem, Netherlands) publishes an online calculator. For a 12-inch 140 g black "
|
||||
@@ -514,15 +509,12 @@ def blocks():
|
||||
["Stamper preparation machines", "Turns a raw nickel shell into a press-ready part",
|
||||
"Sibert back-finisher, punch, coiner (USD 250k budget confirmed)", LP + ", with galvanics"],
|
||||
["A mixed press fleet", "Semi-automatic for colour and short runs, automatic for long runs",
|
||||
pick("Newbilt Duplex system (2 presses, main + colour extruder) and one Newbilt Classic",
|
||||
"Two Newbilt Duplex systems (4 presses, each system with main + colour extruder) and one "
|
||||
"Newbilt Classic"),
|
||||
pick("Launch plant; second Duplex as growth option",
|
||||
"At launch, second Duplex system commissioned last; full hall as an option")],
|
||||
"Newbilt Duplex system (2 presses, main + colour extruder) and one Newbilt Classic",
|
||||
pick("Launch plant; second Duplex as growth option", "At launch; second Duplex as growth option")],
|
||||
["Steam, cooling and compressed air engineered locally", "The largest energy loads; efficiency "
|
||||
"lives here", "Boiler hall and chiller compound for four modules each; " + pick(
|
||||
"2 x 500 kg/h boilers (Chinese route) and 2 x 250 kW chillers",
|
||||
"2 x 500 kg/h boilers and 3 x 250 kW chillers") + "; heat recovery designed in",
|
||||
"2 x 500 kg/h boilers (Thai suppliers) and 2 x 250 kW chillers") + "; heat recovery designed in",
|
||||
LP + "; modules added with presses"],
|
||||
["Whole-plant climate and particulate control", "Moisture and dust are the two classic record "
|
||||
"defects", "20 to 26 °C, 35 to 60% RH, filtration for the burning season, tighter in clean "
|
||||
@@ -638,7 +630,7 @@ def blocks():
|
||||
"and ~45 minutes for a stamper (silvering and bench times are estimates). With loading and rinsing, "
|
||||
"a cell turns a part in about 1 to 1.5 hours, so one PDPU makes 20 to 32 parts in a two-shift day "
|
||||
"against 8 to 20 parts a working day "
|
||||
+ pick("even for the larger five-press fleet", "for Plan B's five presses")
|
||||
+ pick("even for the larger five-press fleet", "even with the second Duplex system added from revenue")
|
||||
+ ". **One PDPU covers the "
|
||||
"demand; a second would buy redundancy, not capacity.** By OMS's rule of thumb (one person runs "
|
||||
"about 20 stampers a day) that is one galvanics operator per shift."),
|
||||
@@ -684,27 +676,21 @@ def blocks():
|
||||
"Duplex share mould inserts, so the plant runs one mould family, one set of spares and one service "
|
||||
"relationship; the cost is a single-vendor dependency."),
|
||||
T(["Machine", "Role", "Basis", "Cost"], [
|
||||
[pick("Newbilt Duplex system (Alsdorf, Germany)", "Newbilt Duplex system 1 (Alsdorf, Germany)"),
|
||||
["Newbilt Duplex system (Alsdorf, Germany)",
|
||||
"Two HRP 12 hydraulic presses (~150 t), EX 50 main "
|
||||
"extruder and EX 35 colour extruder, 12-inch book moulds for 140/180 g, trimmer, label dry oven, "
|
||||
"shrink wrapper, PVC grinder, label punch, spindles and plates; one operator's cell",
|
||||
"Quoted: EUR 200,500 (~USD 232k) for the Single 2.1 system incl. sea freight, June 2024, plus "
|
||||
"the quoted second press and extruder (~USD 115k); expired, re-quote required with build time",
|
||||
"USD 350k to 370k (THB 11.6M to 12.2M)"],
|
||||
*pick([], [[
|
||||
"Newbilt Duplex system 2", "Two more HRP 12 presses with an EX 50 main and an EX 35 colour "
|
||||
"extruder, on the same central hydraulics; commissioned after the Classic",
|
||||
"Estimate on the 2024 quote: two presses at the quoted ~USD 115k per press and extruder set, "
|
||||
"plus a hydraulic unit and the EX 35; no EX 35 price on file",
|
||||
"USD 230k to 300k (THB 7.6M to 9.9M)"]]),
|
||||
["Newbilt Classic", "Fully automatic press with built-in extruder, automatic patty, label and "
|
||||
"record handling; 28 s cycle, ~128 records/h at 180 g; Siemens safety PLC with OPC UA; "
|
||||
"vendor-claimed 95% yield and uptime", "Estimate: placeholder band; **no Newbilt price on "
|
||||
"file**", "USD 290k to 460k (THB 9.6M to 15.2M)"],
|
||||
*pick([["Second Duplex system (growth option)", "Two more semi-automatic presses on the same central "
|
||||
"hydraulics; floor, utility positions and ring-main tees reserved", "Estimate; not in the "
|
||||
"investment",
|
||||
"~USD 230k to 300k"]], []),
|
||||
["Second Duplex system (growth option)", "Two more semi-automatic presses on the same central "
|
||||
"hydraulics; floor, utility positions and ring-main tees reserved", "Estimate; not in the "
|
||||
"investment",
|
||||
"~USD 230k to 300k"],
|
||||
], widths_mm=[34, 66, 42, 28], font_pt=8.5),
|
||||
P("The Pheenix Alpha AD12 automatic press left the plan in October 2026 and stays the comparison if "
|
||||
"the Classic re-quote disappoints."),
|
||||
@@ -719,12 +705,13 @@ def blocks():
|
||||
"modules through the Chinese route: ASME-stamped 1.25 MPa units from makers with Thai "
|
||||
"references, installed by a Thai contractor and verified under the Thai rules for imported "
|
||||
"boilers (section 5.4). ",
|
||||
"At Newbilt's per-machine figures the five presses draw about 750 to 900 kg/h of steam "
|
||||
"at 10 bar / 180 °C and up to ~650 kW of cooling with extruders and hydraulics on a hot "
|
||||
"afternoon (estimates; the Classic is counted as one press and extruder until Newbilt states "
|
||||
"its own figures). They are met by **two 500 kg/h boiler modules (B-1, B-2) and three 250 kW "
|
||||
"chiller modules (CH-1 to CH-3)**, in a boiler hall and an open chiller compound built for four "
|
||||
"modules each; the fourth positions are reserve and growth. ")
|
||||
"At Newbilt's per-machine figures the three presses draw about 450 to 540 kg/h of steam "
|
||||
"at 10 bar / 180 °C and up to ~390 kW of cooling on a hot afternoon (estimates; the Classic is "
|
||||
"counted as one press and extruder until Newbilt states its own figures). They are met by **two "
|
||||
"500 kg/h boiler modules (B-1, B-2) and two 250 kW chiller modules (CH-1, CH-2)**, in a boiler "
|
||||
"hall and an open chiller compound built for four modules each; a second Duplex adds a third "
|
||||
"chiller module, and the fourth positions are reserve and growth. Plan B buys the boiler "
|
||||
"modules and the compressor from Thai suppliers, with local service. ")
|
||||
+ "The presses share one central hydraulic plant and one "
|
||||
"compressed-air plant through ring mains with a valved tee at every press position, so a new press "
|
||||
"is connected without stopping the others; the standby pump set, accumulators and ring main are "
|
||||
@@ -735,34 +722,22 @@ def blocks():
|
||||
"materials and finished goods. A press weighs 1,350 kg on under one square metre, so the floor slab "
|
||||
"must carry several tonnes per square metre and is a building-selection criterion; the floor must "
|
||||
"be flat, non-slip and solvent-resistant."),
|
||||
T(["Stage", "Fleet", "Rough output per year"], pick([
|
||||
T(["Stage", "Fleet", "Rough output per year"], [
|
||||
["Launch plant", "1 Duplex system (2 semi-automatic) + 1 Classic, 2 shifts",
|
||||
"~0.58 to 0.90 million records at 60 % specials (0.71 to 0.97 at ~20 %)"],
|
||||
["Growth option: second Duplex", "4 semi-automatic + 1 Classic, 2 shifts; room reserved, not in "
|
||||
"the investment", "~1.0 to 1.5 million records"],
|
||||
"the investment",
|
||||
"~1.0 to 1.5 million records"],
|
||||
["Full hall (option)", "5 Duplex systems + 4 Classics, the press hall laid out for Duplex "
|
||||
"(special pressings first, ~73/27 by floor); a utility phase of its own",
|
||||
"~2.9 to 4.4 million records at 60 % specials (estimate)"],
|
||||
], [
|
||||
["Plan B at launch", "2 Duplex systems (4 semi-automatic) + 1 Classic, 2 shifts",
|
||||
"~1.0 to 1.5 million records at 60 % specials (central case 1.25 million)"],
|
||||
["Full hall (option)", "5 Duplex systems + 4 Classics, the press hall laid out for Duplex "
|
||||
"(special pressings first, ~73/27 by floor); a utility phase of its own",
|
||||
"~2.9 to 4.4 million records at 60 % specials (estimate)"],
|
||||
]), widths_mm=[40, 80, 50],
|
||||
caption=pick(
|
||||
"Basis: semi-automatic 60 to 80 records/h assumed; Classic ~128/h (vendor flyer); 16 h/day, "
|
||||
"300 days/yr, 60 to 70% overall equipment effectiveness; specials (60 % and more) only on the "
|
||||
"Duplex. The launch plant is 248 to 288 records/h at nameplate, but at 60 % specials the "
|
||||
"Duplex caps it at 200 to 267/h, ~120 to 187/h after effectiveness; the press fleet calculator "
|
||||
"at the team's planning rates gives ~0.94 million. Neither option is in the revenue model "
|
||||
"or the investment.",
|
||||
"Basis: semi-automatic 60 to 80 records/h assumed; Classic ~128/h (vendor flyer); 16 h/day, "
|
||||
"300 days/yr, 60 to 70% overall equipment effectiveness; specials (60 % and more) only on the "
|
||||
"Duplex systems. The five presses are 368 to 448 records/h at nameplate; the four "
|
||||
"semi-automatic presses (240 to 320/h) carry the specials, so at 60 % the Duplex does not "
|
||||
"limit the output; the press fleet calculator at the team's planning rates gives ~1.5 million. "
|
||||
"The full hall is in neither the revenue model nor the investment.")),
|
||||
], widths_mm=[40, 80, 50],
|
||||
caption="Basis: semi-automatic 60 to 80 records/h assumed; Classic ~128/h (vendor flyer); 16 h/day, "
|
||||
"300 days/yr, 60 to 70% overall equipment effectiveness; specials (60 % and more) only on the "
|
||||
"Duplex. The launch plant is 248 to 288 records/h at nameplate, but at 60 % specials the "
|
||||
"Duplex caps it at 200 to 267/h, ~120 to 187/h after effectiveness; the press fleet "
|
||||
"calculator at the team's planning rates gives ~0.94 million. Neither option is in the "
|
||||
"revenue model or the investment."),
|
||||
P("**On the 60 to 70% effectiveness figure.** Newbilt publishes 95% yield and 95% uptime for the "
|
||||
"Classic. We have not adjusted the plan on that basis, deliberately: a vendor's machine uptime "
|
||||
"excludes stamper and mould changes, colour changeovers, compound lot changes, first-article QC "
|
||||
|
||||
Reference in new issue
Block a user