Labour from base salaries; health care with check-ups for all staff
Deploy test site / deploy (push) Successful in 34s
Deploy test site / deploy (push) Successful in 34s
User, October 2026: option to enter base salaries; the company should provide proper extra health care with check-ups for all staff. - worker-safety.md: new "Health care for all staff" policy (decided October 2026): group health insurance (inpatient and outpatient) and a yearly check-up for everyone, office included, on top of social security; the occupational checks Thai law requires for risk-factor work (Ministerial Regulation B.E. 2547: within 30 days, then yearly, by an occupational physician, records kept 2 years after the job ends) for the press floor, galvanics and maintenance; planning costs with sources checked October 2026 (group insurance ~8,000 to 18,006 THB a head a year, plan ~15,000; Rajavej Chiang Mai check-ups 1,290 to 5,990 THB, plan ~2,500 plus ~1,500 risk-factor tests, estimates); social security 5 % up to the 17,500 THB ceiling since 1 January 2026. - revenue-model.md: cutting engineer 50,000 THB is base salary; health care on top of the x1.3 (~0.35M THB a year at the start fleet); what the x1.3 is made of. - Fleet calculator: base salaries per role (the revenue model loaded rates / 1.3; cutting engineer 50,000), employer social security 5 % capped at 17,500, 25 % overtime, bonus and PPE, health insurance and check-ups for all staff incl. 4 office staff (scale.md 3 to 5), risk- factor tests for the press floor, galvanics and maintenance; all as editable assumptions; people table gains office and all-staff rows. Defaults: labour 5.25M THB (was 4.67M loaded), direct cost 1.90 USD a record, EBITDA 2.19M USD.
This commit is contained in:
1 parent
eac45eb234
commit
1a368287f8
4 files changed
+89
-19
No files matched your search
@@ -509,8 +509,18 @@ security, overtime, bonus and PPE:
|
||||
That is 3.7M–5.4M THB/yr (113k–163k USD), or **0.08–0.16 USD per record**
|
||||
over 1.0–1.5M records. Mastering and cutting engineers are excluded —
|
||||
they are title-services labour, not per-record, and admin, sales and
|
||||
logistics sit in overheads below. A cutting engineer costs about
|
||||
**50,000 THB a month** (team figure, October 2026).
|
||||
logistics sit in overheads below. A cutting engineer earns about
|
||||
**50,000 THB a month** base salary (team figure, October 2026).
|
||||
|
||||
**On top of the ×1.3 (October 2026):** the company gives every member of
|
||||
staff, office included, group health insurance and a yearly check-up,
|
||||
plus the occupational checks the law requires for risk-factor work (see
|
||||
[worker safety](../worker-safety.md)): about 17,500 THB a head a year at
|
||||
planning prices, ~20 people at the start fleet, so ~0.35M THB a year. The
|
||||
×1.3 itself is roughly the employer's social security (5 % up to a 17,500
|
||||
THB ceiling since January 2026) plus ~25 % for overtime, bonus and PPE.
|
||||
The [press fleet calculator](../fleet-calculator.html) costs labour from
|
||||
base salaries in that way.
|
||||
|
||||
## Margin per record
|
||||
|
||||
|
||||
Reference in new issue
Block a user