Add end-to-end process flow document and diagram; floor loading criterion

- docs/process-flow.md: mermaid chart plus stage table of every check and
  the three artist approval gates, from audio intake to fulfillment
- docs/process-flow.drawio with PNG and PDF exports
- pressing-line.md: floor must carry multiple tons per m2 in machine areas
- README: process-flow entry in document index and layout tree
This commit is contained in:
grabowski committed 2026-07-17 15:48:48 +07:00
1 parent c07c554169
commit 11b7df3be4
6 files changed
+322

No files matched your search

+9
View File
@@ -40,5 +40,14 @@ electrical load, saturated steam at 10 bar, and compressed air and cooling
water circuits, plus side rooms for materials, compressor, chiller, and
finished goods.
**Floor loading is a building-selection criterion**: the slab must carry
multiple tons per m² in the machine areas. A Newbilt press weighs 1,350 kg
on a footprint under 1 m², and the boiler, chiller, hydraulic aggregate,
battery stack, and stacked material storage all concentrate weight the same
way. The floor must also be flat but not slippery (machine levelling pads
need grip) and resistant to the solvents used in production. Dynamic loads
from press cycles come on top of the static figures, so the structural
engineer gets the vendor data sheets, not just the totals.
Source documents live in [`newbilt/`](newbilt/): the budgetary offer, the
Duplex site requirements, the process schematic, and the service rate card.