Split README into topic documents

- README reduced to overview with linked document index
- docs/equipment/pressing-line.md: fleet strategy, Newbilt plan, site reqs
- docs/suppliers/vendor-landscape.md: researched vendor narratives
- docs/sustainability.md: solar, zero-discharge water, materials
- docs/worker-safety.md: training, clean rooms, PPE
- docs/facility-security.md: access control, CCTV, archive/audio protection,
  fire and life safety, plant monitoring, Thai compliance anchors
This commit is contained in:
grabowski committed 2026-07-17 12:51:04 +07:00
1 parent 6281c5b223
commit 0a4f47a5cc
6 files changed
+320 -212

No files matched your search

+22
View File
@@ -0,0 +1,22 @@
# Worker Safety
Worker safety is a founding priority, on equal footing with the environmental
commitments:
- **Safety training**: proper, structured training for all operators and
maintenance staff, starting with the vendor-led commissioning training and
extending into an ongoing in-house program. The pressing line combines
hydraulics (~180 bar), saturated steam (10 bar / 180 °C), and hot PVC, and
every one of these demands trained, deliberate handling.
- **Clean rooms for galvanics**: silvering and stamper electroforming will
run in dedicated clean rooms with controlled access, proper ventilation and
exhaust, and decontamination procedures for people and equipment leaving
the area. Plating chemistry stays inside its containment.
- **Personal protective equipment**: appropriate PPE (overalls, gloves,
goggles, and process-specific protection) is mandatory per work area, in
line with the equipment vendor's site requirements (exhaust work benches,
fire protection) and local regulations.
Safety infrastructure (training program, clean-room specification,
decontamination workflow) will be planned alongside the equipment, not after
it.