CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Production (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Performance Test (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Code Quality (push) Successful in 13s
Documentation / Validate Documentation (push) Failing after 7s
Documentation / Generate API Documentation (push) Successful in 8s
Documentation / Build Sphinx Documentation (push) Successful in 17s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Cleanup (push) Successful in 0s
Documentation / Documentation Summary (push) Successful in 2s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Test Suite (3.11) (push) Failing after 24s
CI/CD Pipeline - Northern Thailand Ping River Monitor / Build Docker Image (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Integration Test with Services (push) Skipped
CI/CD Pipeline - Northern Thailand Ping River Monitor / Deploy to Staging (push) Skipped
The rolling-origin harness (models/eval_rain.json) showed catchment rain halving flood-year Brier scores, cutting flood-regime MAE 20-40%, and extending the hard 2024 leads (+6h -> +11h at P.1, +10h -> +19h at P.103). Ported: train_all loads the catchment-mean series (use_rain / --no-rain to opt out; without it bundles train as v2), predict fetches live rain hourly and passes an empty series on failure so rain-trained bundles serve with NaN features instead of tripping the feature guard, and the leader worker persists hourly per-point + catchment-mean rows to a new openmeteo_rain table. Regenerated backtest: the 2024 record flood now gets a 13-HOUR WARNING (alert 04:00 vs 17:00 crossing, river at 2.9m at alert time) — the >=12h acceptance gate PASSES for the first time. Journey on that crossing: v1 -18h, v2 +6h, v3 +13h. The marginal 2025 double-crest trades its artifact +46h latch for a calibrated +2h with zero false alarms. P.1 MAE 4.9/7.2/8.7 cm at 6/12/24h. Docs updated throughout.