# Site Candidates The site strategy is a long lease of raw land on which the purpose-built plant is constructed (business plan section 6.1, built from `business-plan/build/`). What any site has to offer is unchanged: ~4 rai minimum and 6 to 8 rai with expansion, truck access and turning, room for the cooling tower and a separated battery enclosure, a 500 to 1,000 kVA medium-voltage connection, a slab rated 3 t/m² and a frame able to carry the overhead crane ([scale](scale.md), [crane, workshop and tours](crane-workshop-tours.md)), factory permission for pressing with a steam boiler, and, for Phase 5, permission for an electroplating line ([galvanics and stamper prep](equipment/galvanics.md)). ## The three candidates | | Mueang Chi, Lamphun | Northern Region Industrial Estate, Lamphun | Payap University land, Chiang Mai | |---|---|---|---| | Status | Working candidate: the massing model, PV roof design and [construction RFQ](finance/phase1-construction-rfq.md) are sited here | Fallback | New lead (October 2026): the university approached the project and is interested in leasing land to us | | Lessor | Private owner | IEAT | Payap University (private, non-profit, founded by the Foundation of the Church of Christ in Thailand) | | Plot | 5-0-66.5 rai, 18.4708 N, 98.9642 E, narrow and skewed | Leased estate plots | Not yet identified. The main (Mae Khao) campus is at 18.795 N, 99.033 E | | Distance to Chiang Mai old city | ~35 km | Lamphun valley | ~5 km east, on the Chiang Mai–Lampang superhighway | | Zoning for factory use | Unverified (agricultural land) | Industrial estate; licensing through the estate | Unverified | | Galvanics effluent | Ours to permit; zero discharge | Shared central effluent treatment | Needs the lessor's consent on top of the permit | | Neighbours | Agricultural | Industrial | A pharmaceutical facility under construction on the same land | ## Payap University (new lead, October 2026) **What we know from the conversation:** Payap University is interested in leasing land to the project, and a pharmaceutical facility is under construction on the same land. The plot, its size, the title, the term and the rent are not known yet. **Public facts.** Payap's main campus, Mae Khao, is at 272 Moo 2, San Phranet, San Sai district, on the Chiang Mai–Lampang superhighway. The university bought it in 1974 as about 120 acres of low-lying land and has since grown it to about 275 acres (~700 rai) with purchases across the ring road (Payap's own history page). Its Faculty of Pharmacy put the construction of a cosmetics production facility and co-working space out to tender in July 2024, and the university has announced a centre for producing active compounds from cannabis and medicinal plants by bioreactor (RPAH) with an industry sponsor. Whether either of these is the pharmaceutical facility on the offered land is to be confirmed. **Why it is worth pursuing.** - **Location.** About 5 km from the old city and 25 to 30 km nearer the team, customers and the airport than Mueang Chi. The [visitor corridor](crane-workshop-tours.md), the [artist platform](artist-platform.md) and hiring all work better in town. - **A partner, not only a landlord.** Payap also wants to build new student programmes with us in audio engineering (mastering, lathe cutting), IT and business administration; that strand has its own page, [Payap partnership](payap-partnership.md). Its Faculty of Pharmacy has analytical labs that could back the PVC material lab ([quality automation](quality-automation.md)), and a formal university collaboration is the kind of R&D and skills cooperation the [BOI](boi.md) merit measures reward; confirm which measure applies. - **Production is already being built there.** If the pharmaceutical facility has factory permission, the land may already have a path through licensing and a medium-voltage supply nearby. Shared infrastructure (MV connection, RO water, effluent treatment) is worth asking about. **What could rule it out** (check in this order, before any design work): 1. **Zoning.** The plot's colour in the Chiang Mai comprehensive city plan and whether it allows a record-pressing factory with a steam boiler and, later, electroplating. A pharmaceutical or cosmetics plant and an electroplating line are different factory classes, so the neighbour's permit proves little. Ask the provincial public works and town planning office, as for Mueang Chi. 2. **Can the university lease to a company?** Title type (Chanote needed), university council approval, and whether campus land of a private higher-education institution carries restrictions on commercial leases. This is a question for Thai counsel, together with the lease terms the business plan already requires (registered 30-year lease with renewal, building ownership, mortgageable). 3. **The pharmaceutical neighbour.** A GMP facility is sensitive to dust, smoke and fumes. Ours: the boiler stack (biomass smoke next to a pharmaceutical plant in town would be a hard sell, which favours electric or LPG steam; see [biomass](biomass.md)), galvanics extraction, PVC extrusion fumes, press noise and truck traffic. Agree emission and buffer rules in the lease rather than after the first complaint. 4. **Flooding.** Payap describes the Mae Khao land as low-lying when bought. Check the plot against the 2024 flood extents; the design's floor, 1.2 m above ground for the loading docks, helps but is not a flood assessment. 5. **Plot fit.** Shape and size against the 60 × 25 m building, the detached utility yard and the phase 2 footprint (6 to 8 rai). The Payap scenario model below fits the whole plant on a 110 m square (7.6 rai) as drawn. 6. **Galvanics on a campus.** Phase 5 electroplating needs the lessor's written consent; the zero-discharge design ([sustainability](sustainability.md)) becomes a lease condition, not only a commitment. **Questions for the next meeting with Payap:** which plot (map, size, title deed number), its zoning and current use; what the pharmaceutical facility is, who operates it and when it opens; what utilities it brings (MV, water, wastewater); lease term, rent, renewal and building ownership; what collaboration the university wants in return. Nothing has been re-sited. The parametric model, PV roof study, RFQ and the fleet site code `lpn` in the [digital factory](digital-factory.md) stay on Mueang Chi until a Payap plot is known and has passed checks 1 and 2. ### Payap scenario model (October 2026) To see the plant on Payap land before a plot is known, a separate parametric BIM model sites it on a simple square plot: [cnx_vinyl_parametric_payap.FCStd](cnx_vinyl_parametric_payap.FCStd) (top view [PNG](cnx_vinyl_parametric_payap.png), [isometric](cnx_vinyl_parametric_payap-iso.png)), built in FreeCAD 26.3 from BIM walls, slabs, columns, spaces and equipment. Every size and position hangs off its `Params` spreadsheet (plot side, setbacks, floor level, building sizes, fire wall line, office gap), so the square can be swapped for the real plot once Payap names one. It is a layout sketch: every position and every equipment envelope is an estimate. - **Plot**: 110 × 110 m (12,100 m², 7.6 rai, inside the 6 to 8 rai of [scale](scale.md)), road assumed on the south side, 6 m setbacks (placeholder). - **Factory, production floor only**: 84 × 25 m at floor level +1.2 m, in process order along a 54 m glazed visitor corridor. From west to east: staff entry and lockers; workshop and spares, with the machine door and a 12 m vehicle ramp at the north-west corner; galvanics clean room and water treatment; stamper prep, PVC lab and material area; compressed air and electrical; the press hall; trim and optical inspection, QC lab, and finishing and packaging. Behind the fire wall at 62 m are the warehouse and dispatch with two dock doors. - The press hall (465 m²) holds two Duplex systems, each two HRP 12 presses with an EX 50 and an EX 35, and the Classic ([pressing line](equipment/pressing-line.md)). - The 5 t crane runs from the west wall to the fire wall ([crane, workshop and tours](crane-workshop-tours.md)). - **Office building, isolated from the factory floor**: 24 × 15 m, single storey, 12 m south of the factory on its own slab and structure, joined by a covered link that lands at the start of the visitor corridor. - It holds reception, offices, a meeting and training room (the [Payap programmes](payap-partnership.md)), mastering and cutting with an inner acoustic lining, the listening room, the IT and server room, the archive, and WC and kitchen. - The lathe sits away from press vibration and outside the crane zone. - **Utility yard** behind the press hall, across a 6 m service lane: - boiler house with chimney and a covered fuel store; - chiller and cooling tower; - process and fire water tanks; - PEA transformer; - a pipe bridge to the press hall. Boiler and chiller are drawn at the one-Duplex sizes and need re-sizing for five presses ([scale](scale.md)). - **Access**: one gate on the south side opens onto a truck apron in front of the dock doors, with the car park in front of the office and a service road round the east end to the yard and the ramp. - **Area**: about 2,100 m² of factory plus 360 m² of office, so ~2,460 m² under roof. That is above the 1,400 to 2,000 m² of the [scale](scale.md) zone table, which held one Duplex and an automated zone with the offices inside. - The press hall matches the new fleet. - Warehouse and dispatch (~530 m²) are drawn above that table's 300 to 500 m² for packaging and finished goods. Both are estimates to settle against the real plot. The Mueang Chi model and everything sited on it stay as they are.